Tribunals and CommissionsDivision Bench(2026) 09 NGT CK 7102

Siddharth Rai vs Uttar Pradesh Pollution Control Board & Ors.

National Green Tribunal, Principal Bench, New Delhi · Decided on 28 September 2026

RESULT
Disposed Of
CASE NUMBER
Original Application No. 385/2025

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

11 paragraphs · 679 words
1.

In this Original Application, the applicant had raised the grievance against the construction of a sewage drainage system in Village Hari-Harpur, Block Manihari, Zila Panchayat Gazipur, Uttar Pradesh. The allegation of the applicant was that through this drainage system which was proposed to be constructed untreated sewage of the village was to be discharge in a local clean pond situated at Araji No. 409 in village Hari-Harpur. The applicant had expressed the apprehension that discharge of untreated sewage in the pond will affect its water quality and will create health hazard.

2.

The Respondent No. 2 – Zila Panchayat Gazipur and Respondent No. 5 – District Magistrate Gazipur had initially filed the joint reply dated 27.08.2025, disclosing that the construction work of the drain was stopped with effect from 01.08.2025 and a decision was taken to divert the drain outlet.

3.

The Respondent Nos. 2 and 5 in their joint reply affidavit dated 27.08.2025 had disclose as under:

“4.

That, however, upon receipt of objections from certain local residents regarding the apprehended discharge of drain wate4r into the pond situated at Plot No. 409, immediate remedial action was undertaken and the construction work was stopped with effect from 01.08.2025. A true copy of the Minutes of Meeting of the Environmental Committee, Ghazipur, dated 01.08.2025, which records the said decision and subsequent action, is also attached herewith and marked as Annexure/1.

5.

That subsequently, in consultation with the Gram Panchayat and local villagers, an alternative alignment was finalized, whereby the proposed drain shall no longer discharge into the pond. Instead, the drain outlet shall be diverted towards Gram Sabha land bearing Arazi No. 223 and 302, where a newly constructed drain exists. At the terminal point, a Silt Catcher and Filter Chamber shall be constructed, as per the design prescribed under Swachh Bharat Mission (Gramin), to ensure treatment/filtration of wastewater before discharge. A True Copy of the resolution/proposal dated 11.08.2025 submitted by the Gram Pradhan, Gram Panchayat Hariharpur, reflecting the consensus and revised alignment plan, is attached herewith and marked as Annexure P/2.”

4.

The Tribunal taking note of the fact that the water quality of the pond was not meeting with the requisite norms, had required the respondent State Authorities to consider the feasibility of constructing a DSTP to treat the sewage flowing in the drain.

5.

The Respondent Nos. 2 and 5 have filed the joint reply dated 26.09.2026, disclosing that it is not feasible to construct the DSTP at the site and that the storm water flowing in the drain, after passing through the constructed filter chamber is discharged into and utilized in the agricultural fields of the local farmers for irrigation and it does not flow into the pond. The disclosure so made by the Respondent Nos. 2 and 5 in their joint reply dated 26.09.2026 is as under:

“4.

That the storm-water flowing in the nali, after passing through the constructed filter chamber, is presently being discharged into and utilised in the agricultural fields of the local farmers for irrigation, and does not flow into or affect the pond in question. That a proposal for installation of a Rain Water Harvesting system, for conservation of the said water, has been proposed, and the work thereon is presently under progress.

5.

That the four-member Committee constituted vide letter dated 02.01.2026 has, upon physical inspection, already found and reported that construction of a DSTP is not required at the site, as also recorded in the earlier Progress Report dated 08.07.2026.

6.

That Respondent Nos. 2 and 5 shall continue to monitor and maintain the diverted drain, silt catcher and filter chamber, and shall ensure that no untreated sewage is discharged into the pond in question, in compliance with the directions of this Hon'ble Tribunal.”

6.

In view of the above subsequent developments, learned counsel for the applicant submits that the grievance raised by the applicant has been redressed and it does not survive now. Considering the above, we are of the view that no further orders in the OA is required, which is accordingly disposed of.