Tribunals and CommissionsDivision Bench(2026) 08 NGT CK 7093

Lalit Kumar Jain vs Uttar Pradesh Pollution Control Board & Ors.

National Green Tribunal, Principal Bench, New Delhi · Decided on 25 August 2026

RESULT
Disposed Of
CASE NUMBER
Original Application No. 645/2023

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

26 paragraphs · 1,395 words
1.

This Original Application (OA) was registered on the basis of a letter petition dated 12.07.2023 sent by one Lalit Kumar Jain resident of Nehru Road, near Jain Mandir, Baraut, Baghpat.

2.

In the letter petition, the Applicant had raised the issue of discharge of untreated sewage in the irrigation canal (Rajwahe), flowing from Baraut and going through different villages.

3.

The plea of the applicant was that the canal water is used for drinking purposes but on account of discharge of untreated sewage from the several drains within Municipal Council Baraut, District Baghpat the water of canal was getting polluted which was creating the health hazards.

4.

The Tribunal by the order dated 08.01.2024 had entertained the letter petition as OA and by impleading the concerned Respondents had issued notices to them. During the pendency of this OA, the steps were taken to remediate the problem raised in the letter petition.

5.

The Respondent-Nagar Palika Parishad, Baraut, UP has filed the affidavit dated 24.08.2026 disclosing that four STPs have been constructed which are now functional and the discharge of untreated sewage from Municipal Council Baraut to the irrigation canal has been stopped. The disclosure so made by the Respondent-Municipal Council Baraut in the latest affidavit dated 24.08.2026 is as under:-

“3.

That it is respectfully submitted that a comprehensive layout plan for treatment of sewage generated within the municipal limits of Nagar Palika Parishad, Baraut was placed before this Hon'ble Tribunal in the earlier status reports and thereafter, in the order dated 10.02.2026, this Hon'ble Tribunal was apprised about the revised layout plan. True copy of revised layout plan is being annexed herewith and marked as Annexure P/1.

4.

That it is submitted that the updated status of the sewage treatment infrastructure is as follows:

S. No.CapacityLocationStatus
1.50 KLDGurana / NPP Baraut sideInstalled, commissioned and operational within the standard norms as per the UPPCB.
2.100 KLDGurana / near Lord Mahavira Academy sideInstalled, commissioned and operational, CTO Granted, Treating as per UPPCB standards.
3.100 KLDBijrol Road / revised site as per updated layoutInstalled and operational and CTO Granted, Treating as per UPPCB standards.
4.250 KLDPayment has been made; Revised location is at Bijrol Road as per updated layouPayment has been made; Revised location is at Bijrol Road as per updated layou
8.

That it is respectfully submitted that a 50 KLD DSTP was earlier installed, commissioned and made operational. The earlier status report records that the said 50 KLD DSTP was successfully designed, constructed, installed, tested and commissioned on 16.06.2025 situated at Lat 29.093425° Long 77.271718°. The UPPCB Regional Laboratory Test Report affirmed treated effluent parameters including pH, BOD, COD and suspended solids within CPCB standards. And the application for Consent to Operate (CTO) in respect of the said 50 KLD DSTP has been granted. True copy of the CTO said 50 KLD DSTP is annexed herewith and marked as Annexure P/2.

9.

That it is further submitted that, in addition to the aforesaid 50 KLD DSTP, one 100 KLD DSTP at Gurana Lat 29.093457° Long 77.271672° and another 100 KLD DSTP at Bijrol Road (revised site) have also been installed in accordance with the recommended capacities under the updated layout plan. These 50 KLD and 100 KLD facilities are completed and operational and sewage interception, diversion and treatment were functional through the said DSTPs.

10.

That it is respectfully submitted that the 100 KLD DSTP at Lat 29.105733° Long 77.268352°. The commissioning of the said DSTP has been done, and it’s operating as per the prescribed standards. The CTO has also been granted for the said 100 KLD DSTP. True copy of the CTOs of the 100 KLDs DSTP is annexed herewith and marked as Annexure P/3 (Colly).

11.

That it is respectfully submitted that the Uttar Pradesh Pollution Control Board has also submitted its testing report in respect of the operational treatment facilities, and the treated effluent parameters have been found to be within permissible limits. It is also already been submitted that treated effluent quality had been independently validated by SGS India Pvt. Ltd., and that the treated water was found fit for reuse in horticulture and landscaping. True copy of the testing Reports done by the UPPCB are hereby annexed and marked as Annexure P/4

12.

That the payment for the 250 KLD capacity DSTP has been made on 21.08.2026 and the DSTP has been installed, and the trial run has been started. The UPPCB can visit the site and take samples of water to verify the treated sewage as per the prescribed standards. True copy of the pictures of the all the KLDs STP is hereby annexed and marked as Annexure P/5.

13.

That as per the Order dated 08.01.2024, the Hon’ble Tribunal observed the grievance of the Applicant that;

“1.

This original application is registered on the basis of the letter petition sent by one Mr. Lalit Kumar Jain resident of Nehru Road, Baraut, Baghpat. In the letter petition the complaint is in respect of discharge of sewage in the irrigation canal known by the name of Rajwahe. It is stated that the said irrigation canal flows from Baraut and goes to different villages and the water of this canal is used for the irrigation purposes but the Municipal Corporation, Baraut is discharging the effluents from several drains in this canal as a result of which the water of the canal has become poisonous and health hazard has been created to the residents and cattle. It is also stated that there is a proposal for discharge of the drain water from the drains to be constructed on both side of Binauli Road in the canal.”

14.

That it is respectfully submitted that, as per the technical assessment carried out by the answering Respondent, approximately 500 KLD sewage/wastewater was earlier flowing towards the canal. The answering Respondent adopted a decentralised sewage treatment model by installing DSTPs at appropriate locations, considering drainage flow, site feasibility, topography, technical suitability and availability of land. This was to achieved by Decentralised treatment through DSTPs along with interception and diversion infrastructure.

15.

That it is respectfully submitted that the target of required infrastructure has been met as per the layout submitted and the required ‘no-gap’ target of the flowing untreated sewage and its treatment has been achieved. That earlier the direct flow of untreated wastewater into the canal was immediately stopped by constructing diversion arrangement, including a wall and associated drainage diversion system and retaining walls and related infrastructural works were undertaken along the Mirapur Rajwahe canal to prevent untreated wastewater discharge and preserve the canal environment.

16.

That the untreated water which was earlier flowing towards the canal has now been intercepted and is being diverted for treatment through the installed DSTPs and the treated water generated from the operational DSTPs is being reused by Nagar Palika Parishad, Baraut for horticulture, irrigation/green area maintenance, landscaping and other permissible municipal construction activities.

17.

That, thus it is respectfully submitted that in this scenario, the matter may be disposed of with direction to the UPPCB to monitor the compliance made and testing of the installed STPs sites if required by the authority. The answering Respondent shall extend full cooperation to UPPCB for the same.”

6.

Learned senior counsel appearing for the Municipal Council Baraut has pointed out that this was taken as a pilot project and it has been successfully completed on priority basis. Hence, such a work of Municipal Council Baraut is appreciable.

7.

Shri Mishra, learned counsel appearing for the UP PCB submits that so far as the first three STPs are concerned, they have been verified and found to be operating as per norms and so far as the fourth STP is concerned, the same will also be verified by the UP PCB.

8.

Having regard to the above and considering the fact that the remedial action has been taken and the discharge of untreated sewage from Municipal Council Baraut to the irrigation canal has been stopped, we dispose of the OA directing the UP PCB to regularly monitor the above STPs and ensure the compliance of the consent conditions by these STPs. The UP PCB will be vigilant in ensuring that no untreated sewage from Municipal Council Baraut flows to the irrigation canal and in case, if any such violation is noticed, the UP PCB will ensure immediate remedial and punitive action.