Tribunals and CommissionsFull Bench(2023) 02 NGT CK 0010

Rama Shanker Awasthi vs State of Uttar Pradesh & Ors

National Green Tribunal · Decided on 13 February 2023

HON’BLE JUDGES
Adarsh Kumar Goel, CP · Sudhir Agarwal, JM · Arun Kumar Tyagi, JM · Dr. Afroz Ahmad, EM
RESULT
Disposed Of
CASE NUMBER
Original Application No. 691 Of 2022

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

157 paragraphs · 1,834 words
1.

Grievance in this application is against operation of captive Thermal Power Plants in Uttar Pradesh under M/s Bajaj Hindusthan Ltd. and Bajaj Energy Ltd. at Lakhimpur Kheri, U.P in violation of environmental norms. According to the applicant, the units are operating without requisite EC and consent. There is illegal extraction of ground water for commercial purposes, in violation of Rules. It is further stated that vide letter dated 06.04.2018, CPCB directed the project proponent (PP) to obtain requisite consent and also directed to take measures against air pollution, to calibrate OCEMS, rectify TSS analyzer and provide ladder for safety of monitoring personnel during manual monitoring but the said directions have not been complied.

2.

Considering the above, vide order dated 27.09.2022 the Tribunal sought a factual and action report from a joint Committee of CPCB and State PCB.

3.

In pursuance of above, report dated 04.01.2023 has been filed by the joint Committee on 16.01.2023 which was incomplete. The report was considered on 20.01.2023 and it was found that serious violations had remain unaddressed and without any coercive measures by the State PCB.

4.

In the light of order dated 20.01.2023, further report has been filed by the State PCB on 10.02.2023 mentioning the action taken as follows:-

“

Sl.

No.

Name of unit

Date        of inspection

Recommendation  of joint committee

Action taken by UPPCB

1.

M/s         Bajaj

Energy     Ltd., Village- Barkhera, Tehsil-Bisalpu Distt.

31.01.2023

The   unit   was   non- operational due to non-requirement     of power   from    UPPCL As informed       by

the                       unit

representative,      the unit    will    start    its production  when  the UPPCL     will     issue production   schedule. The       unit      has to

installed  easy  ladder for  the  monitoring  of flue  gas  emission  as per CPCB guidelines.

UPPCB        vide letter

Dated           10.02.2023

issued  direction  under Air Prevention   and Control of Pollution) Act, 1981   for compliance of recommendation         of Joint             Committee

Report      dated 31.01.2023    (Annexure

no. 1)

2.

M/s         Bajaj Hindustan Sugar        Ltd. (sugar Unit)

31.01.2023

1.

The   unit   has   to installed  easy  ladder for  the  monitoring  of flue  gas  emission  as per   CPCB   guideline and  timeline  given  in the undertaking.

·   UPPCB   vide

letter      dated 10.02.2023 issued direction    under    Air (Prevention            and Control   of   Pollution) Act,         1981         for compliance of recommendation       of Joint Committee report dated         31.01.2023

(Annexure no. 2).

·             UPPCB       vide letter dated 10.02.2023 issued    Show    Cause Notice   under   section- 33A                           of Water(Prevention    and Control    of    Pollution) Act, 1974, as to why the unit    should    not    be closed  and  for  further imposition of EC at the rate of 30,000/- per day from     the     date     of inspection      till      the corrective       measures duly verified are taken. (Annexure no.3)

2.

The    unit    shall maintain               the preventive   measures to    control    of    the fugitive   emission   in bagasse        handling area.

3.

The has to carry out studies    for    impact assessment of treated water   utilization   on agriculture  land  and rate  of  ground  water recharge  through  the pond adopted by them

and log book for water consumptions      and different  Utility  water and     waste     water discharge  required  to be maintained   for proper  accounting  of water     and     waste water.

3.

M/s         Bajaj

Energy      Ltd. village Kundarki, Tehsil-Sadar gonad,   Distt.- Gonda, U.P

28.01.2023

The  unit  requires  to install    easy/circular ladder        for        the monitoring of flue gas emission as per CPCB guideline    and    with timeline given in their undertaking.

UPPCB vide letter dated 10.02.2023         issued direction     under     Air (Prevention and Control of  Pollution)  Act,  1981 for        compliance    of recommendation        of Joint Committee report dated         28.01.2023.

Annexure no. 4

4.

M/s         Bajaj Hindustan Sugar Ltd.(Sugar unit),    Village- Kundarki, Tehsil-    Sadar gonda,    Distt. Gonda, UP

28.01.2023

1.

The  unit  has  to installed  easy  ladder for the monitoring of flue  gas  emission  as per  CPCB  guideline and timeline given in the under taking.

2.

The  unit  has  to maintain              the preventive    measure deployed  for  control of       the       fugitive emission   in   captive power  plant  area  to control     the     dust generated during the handling of bagasse.

3.

The  unit  has  to carry  out  studies for impact assessment of treated             water utilization             on agriculture  land  and rate of ground  water recharge through the pond     adopted     by them.

UPPCB vide letter dated 10.02.2023         issued direction     under     Air (Prevention and Control of  Pollution)  Act,  1981 for        compliance    of recommendation        of Joint Committee report dated          28.01.2023

(Annexure no. 5).

UPPCB vide letter dated 10.02.2023         issued Show    Cause    Notice under   section-33A   of Water(Prevention    and Control    of    Pollution) Act, 1974, as to why the unit    should    not    be imposed Environmental Compensation       from dated    07.12.2022    to

16.12.2022  amounting Rs.              3,00,000/-(Annexure no. 6).

4.

The unit has valid Environment Clarence    (EC)    for MoEF   &   CC,   has valid  consent  under Air  Act,  Water  Act, Authorization        for handling   of   HW   & consent  to  establish

for handling of Ash.

5.

M/s Bajaj

27.01.2023

The   unit   was   non- operational    due    to non-requirement     of power from UPPCL. As informed  by  the  unit representative,      the unit    will    start    its

production  when  the UPPCL     will     issue production   schedule. The    unit     has     to installed  easy  ladder for  the  monitoring  of flue  gas  emission  as per CPCB.

UPPCB vide letter dated

Energy Ltd.,

10.02.2023         issued

Village

direction     under     Air

Etaimaida,

(Prevention and Control

Tehsil-Utraula,

of  Pollution)  Act,  1981

Distt.-

for        compliance    of

Bairampur, UP

recommendation        of

Joint Committee report dated          27.01.2023 (Annexure no. 7).

6.

M/s    Bajaj Hindustan Sugar Ltd.(Sugar unit), Village- Etaimaida, Tehsil-Utraula, Distt.

Balrampur, UP

27.01.2023

1.

The  unit  has  to installed easy ladder for the monitoring of flue gas emission as per  CPCB  guideline and timeline given in the under taking.

2.

The   unit   shall maintain             the preventive   measure to    control    of    the fugitive  emission  in the         bagasse handling area.

UPPCB        vide

letter           dated 10.02.2023       issued direction under Air (Prevention        and Control   of   Pollution) Act,         1981         for compliance of recommendation

of                         Joint

Committee        report dated           27.01.2023

(Annexure no. 8)

3.

The  unit  has  to carryout  studies  for impact    assessment of     treated     water utilization             on agriculture land and rate of ground water recharge      through the pond adopted by them.

UPPCB  vide      letter dated           10.02.2023

issued  Direction  under section-33A        of Water           (Prevention and        Control of Pollution) Act 1974. (Annexure no. 9)

7.

M/s Bajaj Energy Ltd., Village-Maqso odpur, Tehsil- Piwayan, Distt.- Shahjahanpur, UP

31.01.2023

The unit was non- operational due       to          non-requirement      of power   from   UPPCL. As  informed      by the                       unit representative,      the unit    will    start    its production  when  the UPPCL     will     issue production   schedule. The unit has to installed  easy  ladder for  the  monitoring  of flue  gas  emission  as

per CPCB guideline.

UPPCB  vide      letter dated 10.02.2023 issued direction under Air (Prevention        and Control of Pollution) Act, 1981 for compliance of

recommendation of  Joint Committee  report dated 31.01.2023  (Annexure

no. 10)

8.

M/s     Bajaj

Hindustan Sugar Ltd.(Sugar unit), Village- Maqsoodpur, Tehsil- Piwayan, Shahjahanpur, UP       Distt.-

31.01.2023

1.

The  unit  has  to installed easy ladder for the monitoring of flue gas emission as per  CPCB  guideline and timeline given in the undertaking.

2.

The   unit   shall maintain             the preventive  measures to    control    of    the fugitive   emission in bagasse      handling area.

3.

The  unit  has  to carry out studies for impact    assessment of     treated     water utilization             on

agriculture land and rate      of      ground water    recharge through    the    pond adopted by them and

log book for water consumptions   and different  Utility  water and waste water. discharge    required to  be maintained  for proper accounting  of  water and waste

UPPCB          vide letter dated

10.02.2023          issued direction under    Air

(Prevention          and Control of Pollution) Act, 1981 for compliance     of

recommendation of  Joint Committee           report

dated 31.01.2023 (Annexure

no. 11).

UPPCB                vide letter dated 10.02.2023 issued Show Cause Notice       under

section-33A of Water(Prevention and Control of Pollution) Act, 1974, as to why the unit should not be closed and for further

imposition of EC at the rate of 30,000/- per day from the date of inspection till the corrective measures   duly Verified are taken. Annexure no. 12.

9.

M/s Bajaj Energy Pvt. Ltd., Village- Khambharkhe ra, Tehsil- Kheri, Distt.- Lakhimpur Kheri UP

21.12.2022

& 22.12.2022

(Report already submitted)

The  unit  was  non- operational due to non-requirement   of power   form  UPPCL as informed       by

the                     unit

representative,    the unit   will   start   its production when the UPPCL will schedule.

1.

The  unit  has  to install  spiral  ladder for the monitoring of flue gas emission as per CPCB guideline.

2.

The  unit  has  to developed  dedicated storage  shed  for  the storage                  of

contaminated drums and    wax    as    per Hazardous Waste  (Management and    Transboundry movement)       Rules 2016.

UPPCB  vide      letter dated 10.02.2023 has       imposed Environmental Compensation

Rs. 3,50,000/- (Rs.

Three Lac Fifty Thousand

only)                  against the unit in compliance of the recommendation

of                          Joint

Committee

Repor

t Dated 21.12.2022 and

22.12.2022.

(Annexure no. 13.

10.

M/s          Bajaj Hindustan Sugar Ltd.(Sugar unit),    Village- Khambhar khera,   Tehsil- Kheri,    Distt.- Lakhimpur Kheri UP

21.12.2022

& 22.12.2022

(Report already submitted)

1.

The   unit   has   to install   spiral   ladder for  the  monitoring  of flue  gas  emission  as per CPCB

2.

The   unit   has   to maintain the drainage system  and equalization   tank   to ensure                   the compliance  of  norms and  better  efficiency of ETP.

3.

The   unit   has   to modify the launder of clarifier  tank  of  ETP and    sludge    drying beds.

4.

The   unit   has   to deploy  the  preventive measures   to   control the  fugitive  emission of captive power plant area.

5.

The unit has to get repaired   PH   sensor which  is  installed  on ETP  on  priority  basis and                  proper operational             for OCEMS.

6.

The   unit   has   to carry  out  studies  for impact assessment of treated water utilization               on agriculture  land  and rate  of  ground  water recharge  through  the pond     adopted     by them.

7.

The   unit   has   to develop  dedicated storage   set   for   the storage of

contaminated   drums and    bags    as    per Hazardous

Waste (Management       and Transboundry movement)   Rules 2016.

UPPCB vide letter dated 10.02.2023 has imposed Environmental Compensation          Rs. 9,30,000/- (Rs. Nine Lac Thirty   Thousand   only) against    the    unit    in

compliance of          the

recommendation         of Joint             Committee Report      dated 21.12.2022              and

22.12.2022.    Annexure

no. 14.

”

5.

We have considered the matter. It is seen while violations alleged with regard to EC/consents have not been found, other non-compliances have been found noted above against which action has been initiated. The same may now be finalized within one month and surveillance maintained against violations. The State PCB may issue revised CTOs in the light of its report and thereafter secure compliance within the stipulated time frame. In case of default, necessary actions be taken under the Water and Air Acts. We note that no information has been provided as to how thermal power stations are laying closed as per common understanding, such plants are never closed completely. State PCB may check up this aspect.

6.

Learned counsel for the applicant submitted that he did not have access to the report and according to his instructions there are continuing violations. If it is so, it is open to the applicant to point out such violations to the State PCB in the first instance. If any grievance survives, the applicant will be at liberty to take further remedies in accordance with law.

The application is disposed of.