Tribunals and CommissionsDivision Bench(2026) 09 NGT CK 7092

Pranav Kumar Singh vs State Of Uttar Pradesh & Ors.

National Green Tribunal, Principal Bench, New Delhi · Decided on 22 September 2026

RESULT
Disposed Of
CASE NUMBER
Original Application No. 278/2026
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Judgment

76 paragraphs · 3,377 words
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

1.

Mr. Pranav Kumar Singh has sent the present letter petition through email dated 19.08.2025 (pages 1-2 of the paper book) to this Tribunal, which has been treated and registered as O.A. No. 278/2026 for exercise of suo moto jurisdiction in view of law laid down by Hon’ble Supreme Court in Municipal Corporation of Greater Mumbai vs. Ankita Sinha, (2022) 13 SCC 401.

2.

The Applicant has raised grievances regarding environmental damage caused by hot-mix plant operating at village Sujaanpur, NH-124C, Ghazipur, Uttar Pradesh in violation of environmental norms. The relevant part of the letter petition enumerating grievances of the applicant is reproduced as follows:-

xxx…………………………………….xxx…………………………………..xxx

"Respected Sir/Madam, This is to bring to your urgent attention a matter of grave negligence and severe environmental damage being caused by the Bitumen Hot-Mix Plant operating at sujaanpur village NH124c Ghazipur, Uttar Pradesh.

The uncontrolled emissions of toxic gases, thick black smoke, and constant discharge of hazardous residues from this plant are mercilessly poisoning the air we breathe and destroying the soil beneath our feet. Residents are being subjected to unbearable health hazards, with widespread cases of asthma, chronic cough, skin irritation, and other respiratory problems already reported.

It is shocking that such a blatantly polluting unit is allowed to operate despite clear environmental norms. The plant's operations are not only illegally degrading agricultural lands and natural ecosystems, but also threatening the very right of citizens to live in a safe and healthy environment.

This gross violation cannot be allowed to continue even for a single day longer. We demand that:

An immediate on-site inspection be conducted without any delay.

The plant's operations be suspended forthwith until strict compliance with pollution norms is ensured.

Heavy penalties be imposed on the operators for reckless endangerment of health and environment.

Clear action taken be conveyed in writing to the undersigned and other affected residents.

Let it be placed on record that if the matter is ignored or delayed, we will be left with no option but to escalate it further before higher state/national environmental authorities, courts, and public forums for urgent redressal. The suffering of people here is already beyond tolerance.

Also this is not first time I am raising complaint i am doing since 2022 everytime pollution board officer coming and sound helpless in front of these big shot people. We expect decisive action this time-not empty assurances."

3.

Since the averments made in the application raised substantial questions relating to environment arising out of the implementation of the enactments specified in Schedule-I to the National Green Tribunal Act, 2010, this Tribunal impleaded State of Uttar Pradesh through Secretary, Environment, Forest and Climate Change, Government of Uttar Pradesh; District Magistrate, Ghazipur and; Uttar Pradesh State Pollution Control Board through Member Secretary as respondents no. 1 to 3 and ordered issuance of notices to them requiring them to file their replies/responses.

4.

Pursuant to notice of the O.A., response affidavit dated 13.07.2026 (pages 3-20 of the paper book) was filed by respondent no. 3-UPPCB. The relevant part of the response affidavit is reproduced as under:-

“5.

That in compliance to the order dated 18.05.2026 passed by this Hon'ble Tribunal, inspection was carried out by the UPPCB officials on 08.06.2026. During the inspection, Hot mix plant was found not operational and no any person available as representative. The Hot Mix plant is established adjacent to National Highway-124C in the North direction & adjacent to the Applicant's house in the West direction. A copy of the inspection report dated 08.06.2026 along with photographs (with GPS) is being attached herewith and marked as Annexure-R3/1.

6.

That, as per office records the project proponent of Hot Mix Plant has not obtained Consent to Establish (CTE) or Consent to Operate (CTO) under Water Act, 1974 and Air Act, 1981 to the State Board.

7.

That the UPPCB has sent a notice to project proponent of Hot Mix Plant vide letter no. 433/NGT OA No. 278/2026/27, dated 11.06.2026 regarding to obtain Consent to Establish (CTE) or Consent to Operate (CTO) under Water Act, 1974 and Air Act, 1981 from the State Board. A copy of the notice dated 11.06.2026 is being attached herewith and marked as Annexure-R3/2.

8.

That in pursuant to the above, Regional Office, UPPCB, Varanasi has sent recommendation letter to Head Office, Lucknow to issuing show cause notice against the project proponent of Hot Mix Plant under Section 31A of the Air (Prevention and Control of Pollution) Act, 1981 (as amended) vide letter 450/NGT OA No. 278/2026/27, dated 15.06.2026. A copy of the recommendation letter dated 15.06.2026 is being attached herewith and marked as Annexure-R3/3.

9.

That on the basis of Regional Office, Varanasi recommendation letter dated 15.06.2026, UPPCB (Head Office), Lucknow issued a show cause notice to the project proponent under Section 31A of the Air (Prevention and Control of Pollution) Act, 1981 (as amended) vide its letter dated 07.07.2026. A copy of the show cause notice letter dated 07.07.2026 is being attached herewith and marked as Annexure-R3/4.

10.

That in compliance to the order dated 18.05.2026 passed by this Hon'ble Tribunal, The District Magistrate, Ghazipur has constituted a joint committee comprising SDM, Sadar, Ghazipur, DFO, Ghazipur, Nominated member of Regional Office, UP Pollution Control Board, Varanasi and Executive Engineer, Public Work Department, Ghazipur for inspection of concerned Hot Mix Plant vide letter dated 03.07.2026. A copy of the letter dated 03.07.2026 is being attached herewith and marked as Annexure-R3/5.

11.

That in compliance of the order dated 03.07.2026 of District Magistrate, Ghazipur, joint inspection was carried out by the joint committee on 07.07.2026 of the concerned Hot Mix Plant. During joint committee inspection the concerned Hot Mix Plant was also found non-operational. A copy of joint committee inspection report dated 11.07.2026 is being attached herewith and marked as Annexure-R3/6.”

5.

This Tribunal considered the response affidavit filed by the respondent no. 3-UPPCB on 14.07.2026 and observed in order dated 14.07.2026 as under:-

“5.

In its reply, respondent no. 3 has mentioned that Project Proponent has established and operated hot mix plant without obtaining Consent to Establish and Consent to Operate from UPPCB. In the reply, it has been mentioned that notice dated 07.07.2026 has been issued to the Project Proponent.

6.

We have gone through the notice and we find that in the concluding paragraph of the notice it has been mentioned that in case of failure to file any satisfactory reply, order for closure of brick kiln will be passed and there is serious typographical mistake in the show cause notice.

7.

In its reply, respondent no. 3-UPPCB has not specifically mentioned as to whether the hot mix plant meets the siting criteria. In its reply, UPPCB has also not mentioned the particulars of the land, nature and present status thereof and also name of the owner of the same. Illegal establishment and operation of hot mix plant constituted an offence under Section 15 of the Environment (Protection) Act, 1986 but UPPCB has failed to take any action under the above-said provision by filing complaint under Section 5C before the concerned Adjudicating Officer.

8.

We find no explanation as to why this mandatory provision has not been complied with by UPPCB.

9.

It may be observed here that no hot mix plant can be operated without obtaining Consent to Establish (CTE) and Consent to Operate (CTO) from UPPCB. In such an eventuality, UPPCB was required to pass immediate conditional closure order and could not defer the matter of closure of such unit in the name of compliance with the principles of natural justice. UPPCB failed to take immediate action and pass immediate conditional order for closure.

10.

We are constrained to observe that in case of such non-compliance in such cases of illegal establishment and operation of industrial units without CTE/CTO, appropriate action will be taken against the concerned officers of the UPPCB for initiation of disciplinary proceedings and punitive action against them in accordance with law.

11.

Further, prima facie, any such industrial unit/hot mix plant established without obtaining requisite NOC/permissions for conversion of land use etc. from concerned authorities and also CTE/CTO from UPPCB will be liable to be demolished.”

6.

Vide order dated 14.07.2026, project proponent namely Bitumen Hot-Mix Plant, Sujaanpur Village, NH-124C, Ghazipur, Uttar Pradesh was impleaded as respondent no. 4 and notice was ordered to be issued to respondent no. 4 for filing of its response specifically showing cause as to why the hot mix plant, which has been established/operated without obtaining requisite permissions from the concerned authorities and CTO/CTE from UPPCB, may not be ordered to be demolished.

7.

By the above-said order, it was also directed that respondent no. 4-hot mix plant shall not operate till further orders to the contrary.

8.

In compliance of order dated 14.07.2026, Status Report dated 12.08.2026 (pages 21-35 of the paper book) was filed by respondent no. 2-District Magistrate, Ghazipur. The relevant part of the Status Report is reproduced below:-

“5.

That in compliance to the order dated 18.05.2026 passed by this Hon'ble Tribunal, answering Respondent has constituted a joint committee comprising SDM, Sadar, Ghazipur, DFO, Ghazipur, nominated member of Regional Office, UP Pollution Control Board, Varanasi and Executive Engineer, Public Work Department, Ghazipur for inspection of concerned Hot Mix Plant vide letter dated 03.07.2026. True copy of the letter dated 03.07.2026 is attached herewith and marked as Annexure P/1.

6.

That, the joint committee inspection was carried out on date 07.07.2026 of the concerned Hot Mix Plant. During joint committee inspection the concerned Hot Mix Plant was also found non-operational. True copy of joint committee inspection report dated 07.07.2026 is attached herewith and marked as Annexure P/2.

7.

That, in compliance with the order dated 14.07.2026 passed by this Hon'ble Tribunal, particularly para no. 17 thereof, the Answering Respondent has issued a letter dated 07.08.2026 to the SDM, Zamania, Ghazipur; the Circle Officer of Police, Zamania, Ghazipur; and the Regional Officer, U.P. Pollution Control Board, Varanasi, requesting them to ensure that the aforesaid Hot Mix Plant is not operated under any circumstances. True copy of the said letter dated 07.08.2026 is annexed herewith and marked as Annexure P/3.

8.

That, the UPPCB issued a closure order to the project proponent under Section 31A of the Air (Prevention and Control of Pollution) Act, 1981 (as amended) vide its letter dated 07.08.2026. For compliance to the closure order dated 07.08.2026, answering do-Respondent constituted a joint committee vide letter dated 10.08.2026. True copy of the letter dated 10.08.2026 is attached herewith and marked as Annexure P/4.

9.

That, the joint committee sealed the cold feed bins, mixing drum and burner unit of the Hot Mix Plant on date 11.08.2026 and handed over to concerned police station Suhaval, Zamania, Ghazipur for ensuring non operation of aforesaid Hot Mix Plant. True copy of the Joint Committee report dated 11.08.2026 with photographs is attached herewith and marked as Annexure P/5.”

9.

Response Affidavit dated 12.08.2026 (pages 36-81 of the paper book) was filed by respondent no. 3-UPPCB. The relevant part of the response affidavit reads as under:-

“PARAWISE RESPONSE REPLY ARE AS FOLLOWS

i- That, in compliance with the order dated 14.07.2026 passed by this Hon'ble Tribunal, an inspection was carried out by the officials of the Uttar Pradesh Pollution Control Board (UPPCB) on 25.07.2026. As per the inspection report, the following habitations/residential premises were found in the vicinity of the Hot Mix Plant in respect of a notification regarding the site for the establishment of a hot mix plant was issued by the Ministry of Environment, Forest and Climate Change, Government of India, on May 18, 2023:-

Sl. No.Particular Provisions (Siting Criteria as per MOFCC notification Clause [Note(xi)]Status as per inspection report dated 25/07/2026Remark
1.1 km from the boundary of cities and towns.No such establishment found within 1 .0 KMSite does not comply with Serial No. 02 & 03 of the siting criteria for the Hot Mix Plant. as prescribed in Gazette Notification No. G.S.R 376(E) dated May 18, 2023, issued by the Ministry of Environment, Forest and Climate Change (MoEF&CC), Government of India.
2.0.5 km from human habitations.Nearest habitation: 1. Adjacent to boundary of plant premises Complainant House 2. Approx 600 meter from plant premises Viilage-Sujanpur habitation in North direction 3. Approx 250 meter from plant premises 3-4 houses located at North-East direction 4. Approx 1.5 KM from plant premises Village
Chakbakshan habitation located at South direction
3.0.2 km from National or State Highways (measured from the center line)NH-124C adjacent to boundary of plant premises in North side
4.0.5 km from schools. colleges, and temples.Nearest school: Located at approx 600 Meter from Plant in North-East direction
5.1 km from hospitals, courts, and tourist spots.No such establishment found.
Sl. No.Particular ProvisionsStatusRemark
1In cases where existing hot mix plants are unable to meet the siting criteria mentioned in clause (xi), the unit may be permitted to operate subject to the condition that a minimum 6-meter-high compound wall made of GI (Galvanized Iron) sheets is installed along the entire plot periphery (boundary).During the inspection, no establishment was observed with a GI sheet compound wall measuring a minimum of 6 meters in heightNon-Compliance

As per above the site of the hot mix plant is non-compliant with the siting criteria specified in the said notification. A copy of the inspection report dated 25.07.2026 and relevant part of notification dated 18.05.2023 is being annexed herewith and marked as Annexure-R3/1.

ii- That, the project proponent provided the Land Lease Deed along with show cause reply dated 15/07/2026, the site of the unit is situated at Mauza-Mednipur, Pargana-Tehsil Zamania, District-Ghazipur, comprising an area of 0.5060 hectares, equivalent to 2.0 Bigha. Further mentioned that Shri Lal Bahadur Singh s/o Shri Jagdish Singh (landowner), resident of Village-Mednipur, Post-Tadhi Ghat, Police Station-Suhwal, Tehsil-Zamania, District-Ghazipur had leased the land to M/s VKR Infraprojects Limited, represented by its Director, Shri Vinod Kumar Rai, for the purpose of establishing a construction project, at an annual rent of ₹50,000/-for a period commencing from 27.07.2018 and ending on 26.07.2023.

iii- That District Magistrate, Ghazipur have issued direction to SDM, Zamania, Ghazipur for providing land details of Hot Mix Plant vide letter no. 889/NGT/2026-27, dated 07/08/2026. A copy of letter dated is being attached herewith and marked as Annexure-R3/2.

iv- That, SDM, Zamania informed vide letter no. 594, dated 11/08/2026 that aforesaid Hot Mix Plant established on Plot No. 559 (area 4.3920 hectares) in Mauza Mednipur, Pargana and Tehsil Zamania, District Ghazipur. Lal Bahadur s/o of Jagdish Singh is a co-sharer of the said plot. He has leased out his share of the land measuring 0.506 hectares to M/s V.K.R. Infra projects Private Limited (Director: Vinod Kumar Rai, son of Vasudev Rai; Address: House No. 102/1, Naukapura, Badbag, Lanka, Ghazipur, Uttar Pradesh). Which is recorded in Category 1(k) in revenue records. A copy of letter dated 11/08/2026 is being attached herewith and marked as Annexure-R3/3.

v- That, the UPPCB has issued show cause notice against the project proponent of Hot Mix Plant under Section 31A of the Air (Prevention and Control of Pollution) Act, 1981 (as amended) vide letter 450/NGT OA No. 278/2026/27, dated 15.06.2026.

vi- That, the said Show Cause Notice was duly served upon Shri Vinod Kumar Rai through WhatsApp on 10.07.2026. In this regard, the unit submitted its reply to the office on 15.07.2026.

vii- That, project proponent enclosed Land Lease Deed with the reply, the site of the unit is situated at Mauza-Mednipur, Pargana-Tehsil Zamania, District-Ghazipur, comprising an area of 0.5060 hectares, equivalent to 2.0 Bigha. Further mentioned that Shri Lal Bahadur Singh s/o Shri Jagdish Singh (landowner), resident of Village Mednipur, Post-Tadhi Ghat, Police Station-Suhwal, Tehsil-Zamania, District-Ghazipur had leased the land to M/s VKR Infra projects Limited, represented by its Director, Shri Vinod Kumar Rai, for the purpose of establishing a construction project, at an annual rent of ₹50,000/-, for a period commencing from 27.07.2018 and ending on 26.07.2023.

viii- That, the reply of show cause notice dated 15.07.2026 submitted by project proponent of Hot Mix Plant was found to be unsatisfactory. A copy of the reply letter dated 15.07.2026 is being attached herewith and marked as Annexure-R3/4.

ix- That on the basis of Regional Office, Varanasi recommendation letter dated 28/07/2026, UPPCB (Head Office), Lucknow issued a closure order to the project proponent under Section 31A of the Air (Prevention and Control of Pollution) Act, 1981 (as amended) vide its letter dated 07.08.2026. A copy of the closure order dated 07.08.2026 is being attached herewith and marked as Annexure-R3/5.

x- That in compliance to the closure order dated 07.08.2026, The District Magistrate, Ghazipur has constituted a joint committee vide letter dated 10/08/2026. A copy of the letter dated 10/08/2026 is being attached herewith and marked as Annexure-R3/6.

xi- That, the joint committee sealed the cold feed bins, mixing drum and burner unit of the Hot Mix Plant on date 11.08.2026 and handed over to concerned police station Suhaval, Zamania, Ghazipur for ensuring non operation of aforesaid Hot Mix Plant. A copy of the compliance report dated 11.08.2026 with photographs is being attached herewith and marked as Annexure-R3/7.

xii- That, The Hot Mix Plant was established and operated without obtaining Consent to Establish (CTE) and Consent to Operate (CTO), and the necessary pollution control measures were also not installed. The Regional Office, UP Pollution Control Board, Varanasi has prepared prosecution report under the provisions of the Air (Prevention and Control of Pollution) Act, 1981, as amended. Filing of prosecution against aforesaid Hot Mix Plant is under process. A copy of the report is being attached herewith and marked as Annexure-R3/8.”

10.

Despite opportunity having being granted, no response has been filed by respondent no. 4.

11.

Mr. Varun Singh, learned counsel appearing for respondent no. 4 has submitted that respondent no. 4 will dismantle the hot mix plant and remove the machinery from the site in question.

12.

The applicant has not appeared today personally or through duly authorized representative/Counsel and has not filed any response /rejoinder to the replies/reports filed by the respondents.

13.

We have heard submissions made by learned Counsels for the respondents and gone through the material on record.

14.

The applicant has raised grievances regarding environmental damage caused by hot mix plant operating at Sujaanpur Village, NH-124C, Ghazipur, Uttar Pradesh in violation of environmental norms.

15.

In its response affidavit dated 13.08.2026, respondent no. 3-UPPCB has mentioned that the hot mix plant did not meet the siting criteria laid down in MoEF&CC Notification No. GSR 376 (E) dated 18.05.2023.

16.

Respondent no. 4 has made statement through its counsel undertaking to dismantle hot mix plant and remove the machinery from the site in question.

17.

In view of the statement made by respondent no. 4 through its Counsel, respondent no. 4 is directed to dismantle the hot mix plant and remove the machinery from the site in question and submit compliance report to the Member Secretary, UPPCB in this regard within two months and the UPPCB shall verify and submit its report in this regard before the Learned Registrar General of this Tribunal within three months.

18.

Respondent no. 3-UPPCB is directed to take action within two months for imposition and realization of environmental compensation for past violations in accordance with law by giving opportunity of being heard to respondent no. 4 in compliance with principles of natural justice.

19.

Since operation of hot mix plant in violation of environmental norms attracts penalty under Section 15 of the Environment (Protection) Act, 1986, respondent no. 3-UPPCB is also directed to file complaint, within two months, against respondent no. 4 before Adjudication Officer appointed under Section 15C of the Environment (Protection) Act, 1986.

20.

The Member Secretary, UPPCB is directed to file action taken reports as directed above before the Learned Registrar General of this Tribunal, within three months.

21.

The present O.A. is disposed of accordingly with no order as to costs.

22.

The reports as directed above may be filed before Learned Registrar General of this Tribunal, who shall place the matter before the Bench, if the reports are not received and also in case on receipt of the reports further orders are considered to be necessary.

23.

A copy of this order may be sent to the Member Secretary, Uttar Pradesh Pollution Control Board by email for requisite compliance.