The applicant-Virendra Tyagi had sent the present letter petition (Pages no. 1-6 of the paper book) by email dated 16.05.2023 to this Tribunal, which has been treated and registered as Original Application (O.A.) No. 478/2023 for exercise of suo moto jurisdiction in view of law laid down by Hon'ble Supreme Court in Municipal Corporation of Greater Mumbai vs. Ankita Sinha & Ors., (2022) 13 SCC 401.
The applicant raised grievances regarding encroachments and dumping of waste on the land of the water body located in Sector 47, Gurugram, Haryana with prayer for protection and preservation for the same. The relevant part of the O.A. enumerating grievances of the applicant is reproduced as follows:-
“Sub: Protection, cleaning and preservation of aquatic life of the water body for the health and hygiene of the neighbourhood community in Sector 47, Gurugram regarding. X X X
1.There is a water body situated at Google Earth (28.42682, 77.04232) in Sector 47, Gurugram. This area spanning over 3 acres approx., is in hazardous condition to the community which requires to develop as a basic amenity to the residents of the city.
2.The said area is neither protected, nor cleaned and completely derelict. The area is being used as a waste dumping ground, unauthorised jhuggi, unauthorised cow/ buffalo grazing etc., and the effective area of the water body is reducing day by day. The water in the pond due to waste dumping has become a breeding place for mosquitos and other insects. It is resulting to an unhygienic and unsanitary environmental hazard.
3.The matter for protection and development of this water body is reported to your office vide email dated 17th April 2023 for early action.
4.The water body with the surrounding greenbelt and the peripheral catchments needs protection, planned development, rejuvenation, conservation and management for recharging groundwater, for healthy living of neighbourhood community and to enhance the overall aesthetics of this Millennium City.
5.To begin with, it is requested that:
- The pond area may be demarcated at the site and protection by peripheral enclosure be taken up on priority.
- Contour Map may be developed through an engineering survey of the area including the catchment area with invert levels of adjacent roads.
- Identification of water inlets for planning of trace interceptors.
6.In view of the above, it is requested that the protection, restoration/ rejuvenation of this water body along with the development of periphery of the pond with greenery and preservation of the aquatic life of pond for conservation of biodiversity may be taken up with Active Citizen Participation as a Model Development.
7.In this regard, it is stated that upon availability of survey details, services of the retired and serving professional in the community may be utilised for the development of the plan of entire water body area for further scrutiny by the State Govt. Officials and further implementation. Involving neighbourhood community people will promote belongingness, awareness and accountability for public property in the neighbourhood and State Govt. may save funds on this account.
8.Few photographs and videos of the water body and its peripheral area are attached herewith for perusal please.”
Since the averments made in the O.A. prima facie raised substantial environmental questions arising out of implementation of the enactments specified in First Schedule to the National Green Tribunal Act, 2010, this Tribunal constituted a Joint Committee comprising of Haryana State Pollution Control Board (HSPCB) and District Magistrate (DM), Gurugram with direction to meet within one week, undertake visits to the site, look into the grievances of the applicant, associate the applicant, verify the factual position and take appropriate remedial action by following due course of law and submit its factual report within two months. The Committee was also directed to report status of water body as per the revenue record and also status of compliance with regard to other waterbodies in District Gurugram with directions given by this Tribunal vide order dated 18.11.2020 passed by this Tribunal in OA No. 325/2015, Lt. Col. Sarvadaman Singh Oberoi vs. Union of India and others.
In compliance thereof, the Regional Officer, Haryana State Pollution Control Board (HSPCB), Gurugram Region, North filed report of the Joint Committee by e-mail dated 08.11.2023 (Pages no. 7-70 of the paper book) and by email dated 14.01.2024 (Pages no. 71-74 of the paper book). The relevant part of the Joint Committee report reads as under:-
'2. Compliance of Hon'ble National Green Tribunal directions:-
In compliance of Hon'ble NGT directions issued vide order dated 03.08.2023, a committee of following officers was constituted to ascertain facts and furnish a factual action taken report:-
Sr. No. Name of Officer & Designation Nominee 1. Sh. Hitesh Kumar Meena, IAS, Additional Deputy Commissioner, Gurugram Deputy Commissioner Gurugram 2. Sh. Aparnesh Kumar, Scientist B, HSPCB, Gurugram Region (N) HSPCB Observations and Findings:-
A joint committee comprising of Sh. Hitesh Kumar Meena, IAS, Additional Deputy Commissioner, Gurugram & Sh. Aparnesh Kumar, Scientist B HSPCB, Gurugram Region (N) has visited site on 26.09.2023 alongwith the complainant & Regional Officer, Gurugram Region (North) and during inspection water body was found existing in a narrow shape w.r.t. total area of 19 Kanal 6 Marla earmarked in revenue record. Revenue estate of the area falls under jurisdiction & possession of MCG and MCG is responsible for its maintenance, cleaning, rehabilitation & removal of encroachment. Due to improper maintenance & cleaning by MCG and passage of time vegetation has grown up in the water body. Complainant claimed that encroachment was done by adjacent Group Housing Society and by PWD (B&R) for constructing road. The matter relates to MCG & PWD (B&R) and directions may be issued to MCG to get water body rehabilitated.
Sh. Pradeep Singh and villagers of Village Fatehpur (Jharsa), Sector -47, Gurugram has submitted a representation dated 06.11.2023 (Annexure-1), which is reproduced as under:-
"सविनय निवेदन है कि ग्राम फतेहपुर (झाड़सा) सैक्टर-47, गुरुग्राम की जमीन पर उच्च न्यायालय पंजाब एण्ड हरियाणा चण्डीगढ़ से स्थगन आदेश दिनांक 25.05.2015 से है केस नम्बर सी0डब्ल्यू0पी0 10558 वर्ष 2015 है। स्थगन आदेश की कॉपी संलग्न है। बिन्दुवार विवरण निम्न प्रकार से है:-
1.उक्त गांव की कुल 17 एकड़ जमीन है। जिस पर दो प्राचीन मंदिर व एक जोहड़ है गांव के मकानों, मंदिरों व जोहड़ की फोटो प्रति संलग्न है।
2.यह गांव पिछड़ी जाति (धीवर/कश्यप) का 100 वर्ष पुराना है। इस गांव में लगभग 205 परिवार जमीन अधिग्रहण वर्ष 2003 से पहले रहते थे। इस बारे जनगणना वर्ष 2001 की कॉपी भी संलग्न है। गांव के 205 परिवारों को बगैर किसी कोर्ट के आदेश पर वर्ष 2015 में उजाड़ दिया गया है।
3.इस गांव की जमीन खसरा न0 6/3 / 2 व 4 जो अधिग्रहण से बाहर है उस पर करीब 20 मकान बने हुए थे, को भी हुड्डा विभाग तथा यूनिटेक बिल्डर की मिली भगत से बिल्डर को रास्ता देने के लिए गैर कानूनी रूप से तहस नहस दिनांक 12.04.2015 को कर दिये गये थे। भूमि अधिग्रहण अधिकारी गुरुग्राम द्वारा दी गई सूचना / रिपोर्ट की कॉपी संलग्न है उक्त खसरान की जमीन पर हुड्डा प्लानिंग विभाग द्वारा वर्ष 2013 में सरकारी कार्टर बनाने बारे प्लानिंग की गई है। जिस बारे हुड्डा विभाग मुख्यालय द्वारा ऐतराज जताया गया था कि जो जमीन अधिग्रहण से बाहर है उस पर प्लानिंग किस कारण कर दी गई। इस बारे रिपोर्ट मांगी गई थी। लेकिन 10-15 स्मरण-पत्र देने के बाद प्लानिंग विभाग गुरुग्राम द्वारा रिपोर्ट मुख्यालय को नहीं दी गई।
4.गांव के जोहड़ में पानी गांव के चारों तरफ से बरसात के समय में आया करता था और आज गांव के चारों तरफ 20-20 टॉवर मंजिल बनने के कारण गांव के जोहड़ में केवल सीमित मात्रा में ही पानी आ पाता है यूनिटेक बिल्डर द्वारा बनाई गई सड़क गांव के जोहड़ की जमीन में आती है।
5.गांव फतेहपुर झांडसा के रकबे में कई और भी तालाब व जोहड़ आते थे। जिन पर अब बड़ी बड़ी बिल्डिंगें व पार्क बन चुके हैं।
6.गांव वालों ने अपने मंदिर व जोहड़ और अपने गांव को बचाने का प्रयास किया परन्तु हरियाणा शहरी विकास प्राधिकरण ने गांव को अधिग्रहण करके सैक्टर-47 विकसित कर दिया और इस गांव को पॉकेट A में दर्शाया गया। जिसमें गांव के मंदिर व जोहड़ को दर्शाया नहीं गया है। इस बारे में वर्णन Case No. 10558/2015 में है।
7.आज अपने निजी स्वार्थ के लिए RWA सैक्टर-47, Builder / HSVP/NGO और सैक्टर-47 के लोग गांव के दोनों मंदिरों व जोहड़ पर अपना कब्जा करने की कोशिश कर रहे हैं तथा गांव में बसें 40-45 टैम्परेरी शेड्स में लोग पक्के मकानों को टूटने के बाद से रह रहे हैं। उन्हें भी वहां से भगाने का प्रयास कर रहे हैं और उस जमीन पर पार्क व बड़ा तालाब बनवाना चाहते हैं गांव के लोग उच्च न्यायालय में अपने गांव का केस लड़ रहे हैं तथा अपने मंदिर व जोहड़ को अन्य अति आक्रमणकारी से बचाने की उच्च न्यायालय में गुहार लगा रहे हैं।
8.गांव के टूटने से लगभग 250 परिवार सामाजिक / सांस्कृतिक व आर्थिक रूप से बाहरी दुनिया से कट चुके हैं। सन् 2015 से अब तक गांव के लगभग 20 व्यक्तियों की मृत्यु हो चुकी है न्याय के इंतजार में। लगभग 150 से ज्यादा परिवार दूसरे गांव में जाकर किराये पर रहने को मजबूर हैं तथा उनका रोजगार भी खत्म हो गया है। उनके बच्चों की पढ़ाई लिखाई भी छूट गई है व बच्चों की शादियों भी नहीं हो पा रही है।
9.अतः आपसे हाथ जोड़कर प्रार्थना है कि उक्त गांव के लोगों को गांव में ही रहने व जीने का अधिकार दिया जाए तथा गांव की जमीन को अधिग्रहण से मुक्त कर दिया जाए। आपकी अति कृपा होगी।”
CWP No. 10558 of 2015 titled as Bheem Singh Kashyap and Ors V/s State of Haryana and Ors. is pending before Hon'ble High Court of Punjab and Haryana at Chandigarh and Hon'ble High Court vide its order dated 25.05.2015 has order as under:-
"...In the meantime, status quo shall be maintained. It is, however, clarified that it shall be the responsibility of the petitioners to serve the respondents before the date fixed, failing which the interim order shall stand vacated."
The report is being submitted in light of order of Hon'ble Tribunal, please."
In view of the averments made in the O.A. and observations made in the report of the Joint Committee, this Tribunal vide order dated 10.11.2023 impleaded State of Haryana, through District Magistrate, Gurugram; Commissioner, Municipal Corporation, Gurugram; Haryana Shehri Vikas Pradhikaran; Haryana Water Resources (Conservation, Regulation and Management) Authority; and Haryana Pollution Control Board, through its Member Secretary as respondents no. 1 to 5 and ordered issuance of notices requiring them to file their responses. Subsequently, Gurugram Metropolitan Development Authority was impleaded as respondent no. 6 vide order dated 15.01.2024.
In the course of hearing, reply dated 18.03.2024 was filed by respondent no. 2-Municipal Corporation, Gurugram and reply dated 18.03.2024 was filed by respondent no. 6- Gurugram Metropolitan Development Authority.
Arguments were heard and Judgment was reserved vide order dated 19.03.2024.
However, while going through the material on record this Tribunal noticed that respondent no.6-GMDA had in its reply claimed restoration of water body measuring 19K-16M in question through NGO namely ‘SEEDS’ but in its report the Joint Committee had mentioned about submission of representation dated 06.11.2023 by Mr. Pradeep Singh and villagers of Fatehpur regarding their long procession over the land in question and pendency of CWP No. 10558 of 2015 titled as Bheem Singh Kashyap and Ors Vs. State of Haryana and Ors. before Hon’ble Punjab and Haryana High Court wherein status quo order dated 25.05.2015 was passed by Hon’ble Punjab and Haryana High Court and that these material aspects were not specifically referred to in the reply filed by GMDA and were not specifically argued at the time of hearing. Accordingly, while mentioning that copies of the writ petition and all the orders passed by Hon’ble Punjab and Haryana High Court on the same were required to be placed on record, this Tribunal vide order dated 25.07.2024 relisted the matter for further hearing and directed respondent no. 6-GMDA to clarify the factual position with respect to the relief claimed in the above said writ petition and status quo order passed by Hon’ble Punjab and Haryana High Court.
In the course of further hearing additional affidavit dated 31.03.2026 was filed by respondent no. 1-State of Haryana; replies dated 09.09.2025, 27.10.2025 and 31.03.2026 were filed by respondent no. 3- Haryana Shehri Vikas Pradhikaran, reply dated 08.09.2025 was filed by respondent no. 4- Haryana Water Resources (Conservation, Regulation and Management) Authority and reply dated 26.08.2025 was filed by respondent no. 6- Gurugram Metropolitan Development Authority.
However, the relevant parts of the replies filed by the above said respondents are not reproduced here for the sake of brevity and for avoiding repetition and the same will be referred to and discussed in later part of this order.
The applicant did not appear personally or through any authorized representative/counsel and did not file any objections to the report of the Joint Committee and rejoinders to the responses filed by the respondents.
We have heard submissions made by learned Counsels for respondent no. 1 to 6 and gone through the material on record carefully.
The Chief Executive Officer, Haryana Water Resources (Conservation, Regulation and Management) Authority, Haryana, Panchkula filed reply dated 08.09.2025 (Pages no. 89-91 of the paper book) mentioning that the subject matter of the present Original Application does not fall within its purview or mandate and no action is required to be taken by it.
In his reply dated 18.03.2024 (Pages no. 75-79 of the paper book), the Executive Engineer (Horticulture), Municipal Corporation, Gurugram stated that as per latest Jamabandi for the year 2018-19, category of land falling under Khasra No.6//26 (19K-16M) of Village Fatehpur Jharsa, Gurugram is Johad. The land in question has been developed as water body in coordination with Gurugram Development Authority through an NGO namely 'SEEDS' after fencing of the area. This developed area includes water body, footpath around water body, open gym and benches. GMDA has provided connection for supply of treated water from STP at Behrampur.
In its reply dated 18.03.2024 (Pages no. 80-83 of the paper book) respondent no. 6-GMDA submitted that it has facilitated MCG for developing water body in question, and has provided connection for supply of treated water from its treated water pipeline network to the waterbody. The treated water supply to the waterbody has been started.
However, respondent no. 6-GMDA filed reply dated 26.08.2025 (Pages no. 84-88 of the paper book) mentioning that it is neither owner nor in possession and has merely provided connection for supply of treated water from its treated water pipeline from STP at Behrampur. In its reply, respondent no. 6 also mentioned that it is not a party to CWP No.10558 of 2015 titled as 'Bheem Singh Kashyap and others Vs. State of Haryana and others pending for 04.11.2025 before the Hon'ble High Court of Punjab & Haryana and is not in position to clarify the factual position with respect to the relief claimed in the above said Writ Petition and status quo order passed by Hon’ble High Court Punjab and Haryana.
Vide order dated 28.08.2025, this Tribunal sought specific response from respondent no. 6-GMDA with respect to the order dated 25.05.2015 passed in CWP No. 10558 of 2015 titled as Bheem Singh Kashyap and Others Vs. State of Haryana and Others qua the water body in question.
The Administrator, HSVP, Gurugram filed reply dated 09.09.2025 (Pages no. 92-456 of the paper book) on behalf of respondent no. 3-HSVP. In his reply the Administrator, HSVP, Gurugram submitted that the land in question comprising Khasra No. 6//26 formed subject matter of the CWP No. 10558 of 2015. The land parcels were acquired vide notifications dated 12.08.2003 and 10.08.2004 issued under sections 4 and 6 of the Land Acquisition Act, 1894 followed by award dated 07.12.2005 for public purpose namely Development of Residential and Commercial Sector 47, Gurugram and the possession of the acquired land was taken and handed over by the Land Acquisition Collector, Gurugram to Estate Officer-II, HSVP, Gurugram vide Rapat Roznamcha no. 182 dated 07.12.2005.
In his above said reply, the Administrator, HSVP, Gurugram also mentioned that since status quo order dated 25.05.2015 is operative, respondent no. 3 has been stopped from taking any action qua khasra no. 6//26 of Village Fatehpur Jharsa.
In CWP No. 10558 of 2015 titled as Bheem Singh Kashyap and Others Vs. State of Haryana and Others the land of the pond comprised in 6//26 was included in Para No. 12 thereof which referred to land comprised in Khewat No., Kila No./Khasra No. 6//3/2, 4, 6, 7, 8, 14, 16/2, 17/1, 17/2, 18/1, 19/1, 24, 26, Rect. No. 3, Kila No. 26, Rect. No. 6, Kila No. 3/1, 3, Kila No. 7, Rect. No. 5, Kila No. 20/1 (3-11) of village Fatehpur Jharsa.
In the above said writ petition the petitioners challenged the Land Acquisition Notifications dated 12.08.2003 and 10.08.2004 and raised grievances regarding demolition carried out by the respondents on 12.04.2015 and sought CBI inquiry, rehabilitation of affected families and for payment of compensation to them with other consequential reliefs.
Vide order dated 28.08.2025 this Tribunal sought response of the respondent no. 6 with respect to effect of the above said order qua the water body in question. In compliance of order dated 28.08.2025, Mr. Ajay Kumar, District Magistrate, Gurugram appeared through V.C. and Ms. Vaishali Singh, Administrator, HSVP, Gurugram and Mr. Vijay Yadav, D.R.O., Gurugram appeared physically before this Tribunal on 10.09.2025 and sought time for filing of additional responses mentioning therein the requisite details regarding encroachments on the water bodies and also details of encroachers.
Additional affidavit dated 27.10.2025 (Pages no.457-466 of the paper book) was filed by the Administrator, HSVP, Gururgam on behalf of respondent no. 3-Haryana Shehri Vikas Pradhikaran.
In additional affidavit dated 27.10.2025, respondent no. 3-Administrator, HSVP, Gurugram submitted that the area of Khasra no. 6//26 of Village Fatehpur Jharsa was fenced at the site and a pond exist on the same on the periphery of Khasra no. 6//26, the structures exist in the shape of a temple, temporary washroom and a small masonry platform. Photographs taken during the site visit on 24.10.2025 were enclosed with the additional affidavit.
This Tribunal considered the reply and found the same to be materially deficient as the requisite details regarding encroachments made and also details of the area encroached upon and the names of encroachers and action taken for removal of encroachments were not given and respondents were granted opportunity to file additional response.
Respondent no. 1-State of Haryana filed additional response dated 31.03.2026 (Pages no. 467-472 of the paper book) mentioning that the matter was got examined and a report dated 30.03.2026 (Pages no. 470– 472 of the paper book)containing details of encroachments including particulars of encroachers has been obtained.
The Administrator, HSVP, Gurugram filed additional response dated 31.03.2026 (Pages no. 473-491 of the paper book) on behalf of respondent no. 3-HSVP that all encroachments which have been raised after passing of the status quo order dated 25.05.2015 passed by Hon’ble Punjab and Haryana Hight Court in CWP No. 10558 of 2015 titled as Bheem Singh Kashyap and Others Vs. State of Haryana and Others shall be removed as per law by respondent no. 3-HSVP, Gurugram who is custodian of the land in question. The relevant part of the additional response is reproduced below:-
“3.That it is respectfully submitted that site in question was visited by the Survey team of the Estate Office-II, HSVP, Gurugram and Revenue department and vide report dated 31.03.2026 sent through email dated 31.03.2026, it has been submitted that the area of Khasra No. 6//26 of village Fatehpur Jharsa was demarcated and on site a pond by name of Jharsa Pond exist on the site of Khasra No. 6//26. It has been further submitted that there is one temple (39 sq. yards) and a small masonry platform (Majar) (5 sq. yards). It has been further submitted that there are 7 Jhuggi's on the land in question. A true translated copy of demarcation report dated 31.10.2025 received through email dated 31.10.2025 is annexed herewith as Annexure R-3/1(Pg. No. ) for the kind consideration of the Hon'ble Court.
The photographs of the Khasra No. 6//26 taken during the site visits on 30.03.2025 and 31.10.2025 are marked and annexed herewith as Annexure R-3/2 (Pg No. ) for the kind consideration of the Hon'ble Tribunal.
4.That for the assistance of the Hon'ble Tribunal for just adjudication of the matter at hand, drone imagery of the Khasra No. 6//26 of village Fatehpur was also taken. A copy of drone imagery dated 31.03.2206 is marked and annexed herewith as Annexure R-3/3 (Pg No. ) for the kind consideration of the Hon'ble Tribunal.
5.That as far as CWP No. 10558 of 2015 titled as Bheem Singh Kasyhap & Ors Vs State of Haryana & Ors is concerned in which acquisition proceedings have been challenged qua land in question among other lands, same is now fixed for 24.08.2026 before Hon'ble Punjab & Haryana High Court, Chandigarh. It is further submitted that vide order dated 25.05.2015, Hon'ble High Court had directed parties to maintain status quo. The said order dated 25.05.2015 is still operating. A copy of order dated 25.05.2015 is annexed herewith as Annexure R-3/4 (Pg. No. ) for the kind consideration of the Hon'ble Tribunal.
6.That it is further submitted that all encroachments which have been raised after passing of status quo order dated 25.05.2015 in CWP No. 10558 of 2015 shall be removed as per law by the Estate Officer-II, HSVP, Gurugram who is custodian of the land in question through her survey team.”
The relevant part of translated copy of report dated 31.10.2025 (sic 30.03.2026) enclosed as annexure R-3/1 (at page no. 478 of the paper book) is reproduced below:-
“In the above matter, demarcation report had already been submitted before the Hon'ble Tribunal. Hon'ble Tribunal had directed for providing status of encroachments and names of encroachers which was shown as E-1 to E-4 by the DGPS Surveyor. The details of the encroachers are as under:-
S.No. Khasra No. Area in yards Name of Encroachers
E-1 6//26 39 sq. yards Temple Constructed by the Gram Samaj
E-2 6//26 5 sq. yards Majar of Mahant
E-3 6//26 275 sq. yards On bund constructed by Govt. by to store water, there are jhuggi's exist Name of the encroachers areas under:-1. Krishan S/o Suresh 2. Mahesh S/o Uday Singh 3. Krishan S/o Balbir 4. Sonu S/o Suresh 5. Chand S/o Narayan 6. Bagdu S/o Teja 7. Chand S/o Bagdu
E-4 6//26 1077 sq. yards Haryana Shehri Vikas Pradhikaran has constructed road and Footpath
Therefore in compliance of Hon'ble Tribunal orders, the above report is submitted to Tehsildar Wazirabad for further necessary action.”
By the material on record it is established that land comprised in Khasra no. 6//26, Village Fatehpur Jharsa, District Gurugram is a pond and pond exists over part of the same but part of Khasra no. 6//26 as mentioned in report dated 31.03.2026 enclosed with reply dated 31.03.2026 has been encroached upon by seven persons.
In Hinch Lal Tiwari Vs. Kamala Devi and others (2001) 6 SCC 496 Hon’ble Supreme Court held that ‘ponds’ are a public utility meant for common use and the ponds could not be allotted or commercialised. In that case Hon’ble Supreme Court observed that the Government, including the Revenue Authorities i.e. Respondents 11 to 13, having noticed that a pond is falling in disuse, should have bestowed their attention to develop the same which would, on one hand, have prevented ecological disaster and on the other provided better environment for the benefit of the public at large. Such vigil is the best protection against knavish attempts to seek allotment in non-abadi sites. While setting aside the order of the High Court, restoring the order of the Additional Collector dated 25-2-1999 confirmed by the Commissioner on 12-3-1999 and directing respondents no1 to 10 to vacate the land, Hon’ble Supreme Court directed the State including Respondents 11 to 13 to restore the pond, develop and maintain the same as a recreational spot observing that it will undoubtedly be in the best interest of the villagers and will also help in maintaining ecological balance and protecting the environment. In that case Hon’ble Supreme Court observed as under:-
“13.It is important to notice that the material resources of the community like forests, tanks, ponds, hillock, mountain etc. are nature's bounty. They maintain delicate ecological balance. They need to be protected for a proper and healthy environment which enables people to enjoy a quality life which is the essence of the guaranteed right under Article 21 of the Constitution…..”
In Jagpal Singh and others Vs. State of Punjab and others (2011) 11 SCC 396 Hon’ble Supreme Court noted that since time immemorial, certain common lands had vested in village communities for collective benefit. Except in exceptional circumstances when used exclusively for the downtrodden, said lands were inalienable. Since Independence powerful people and a corrupt system had appropriated said lands for personal aggrandizement. Pointing out the harms in allowing such misappropriation, Hon’ble Supreme Court noted an urgent public interest in stopping such misdeeds and issued directions for eviction of illegal occupants and restoration of the common land to villagers. In that case Hon’ble Supreme Court observed as under:-
“X X X X
19.… our ancestors were not fools. They knew that in certain years there may be droughts or water shortages for some other reason, and water was also required for cattle to drink and bathe in etc. Hence they built a pond attached to every village, a tank attached to every temple, etc. These were their traditional rain water harvesting methods, which served them for thousands of years.
20.Over the last few decades, however, most of these ponds in our country have been filled with earth and built upon by greedy people, thus destroying their original character. This has contributed to the water shortages in the country. Also, many ponds are auctioned off at throw away prices to businessmen for fisheries in collusion with authorities/Gram Panchayat officials, and even this money collected from these so called auctions are not used for the common benefit of the villagers but misappropriated by certain individuals. The time has come when these malpractices must stop.
21.In Uttar Pradesh the U.P. Consolidation of Holdings Act, 1954 was widely misused to usurp Gram Sabha lands either with connivance of the Consolidation Authorities, or by forging orders purported to have been passed by Consolidation Officers in the long past so that they may not be compared with the original revenue record showing the land as Gram Sabha land, as these revenue records had been weeded out. Similar may have been the practice in other States. The time has now come to review all these orders by which the common village land has been grabbed by such fraudulent practices. X X X X
23.Before parting with this case we give directions to all the State Governments in the country that they should prepare schemes for eviction of illegal/unauthorized occupants of Gram Sabha/Gram Panchayat/Poramboke/Shamlat land and these must be restored to the Gram Sabha/Gram Panchayat for the common use of villagers of the village. For this purpose the Chief Secretaries of all State Governments/Union Territories in India are directed to do the needful, taking the help of other senior officers of the Governments. The said scheme should provide for the speedy eviction of such illegal occupant, after giving him a show cause notice and a brief hearing. Long duration of such illegal occupation or huge expenditure in making constructions thereon or political connections must not be treated as a justification for condoning this illegal act or for regularizing the illegal possession. Regularization should only be permitted in exceptional cases e.g. where lease has been granted under some Government notification to landless labourers or members of Scheduled Castes/Scheduled Tribes, or where there is already a school, dispensary or other public utility on the land.
24.Let a copy of this order be sent to all Chief Secretaries of all States and Union Territories in India who will ensure strict and prompt compliance of this order and submit compliance reports to this Court from time to time. X X X X”
In O.A. No. 325/2015 titled Lt. Col. Sarvadaman Singh Oberoi vs. Union of India and others the issue for consideration in the original application was identification, protection and restoration of water bodies in Gurgaon in Haryana. However, in the light of proceedings which took place, the scope of the application was extended to the entire State and then to the entire country, in the interest of protection of environment. This Tribunal noted the need for conservation of water bodies throughout India for healthy environment, particularly in the light of judgment of the Hon’ble Supreme Court in Hinch Lal Tiwari vs. Kamala Devi & Ors. (2001) 6 SCC 496. This Tribunal observed that under Public Trust Doctrine, the State has to maintain and restore the water bodies. This inter-alia helps availability of water, protection of aquatic life, maintaining micro climate, recharge the ground water and e-flow of the rivers. In view of mandate of law laid down by the Hon’ble Supreme Court and the NGT Act, 2010, this Tribunal, vide order dated 10.05.2019, directed all States/UTs to review the existing framework of restoration of all the water bodies by preparing an appropriate action plan and to include restoration of water bodies as one of the items incidental to waste management covered by orders in O.A. No. 606/2018 Compliance of MSW Rules, 2016, directed CPCB to examine all such plans and furnish its comments to this Tribunal and to prepare and place on its website guidelines in the matter of restoration of water bodies and directed Central Monitoring Committee constituted in terms of order dated 08.04.2019 in O.A. No. 673/2018, News item published in “the Hindu” authored by Shri Jacob Koshy titled “More river stretches are now critically polluted”. This Tribunal considered the reports filed by CPCB and the U.P. Oversight Committee and status of compliance and issued further directions vide order dated 18.11.2020.
In O.A. No. 219/2024 titled as Syed Ashhar Tauseef Vs. Kamal Faruqui and others where the respondents no. 1, 3 to 5 raised construction by encroaching upon the water body resulting in destruction of the water body (pond), the Bench headed by the Hon’ble the Chairperson of this Tribunal held that such an action could not be given the seal of approval and that having regard to the importance of water body in the larger context of the environment and also considering the local geographical contextual issues, the water body which was existing earlier on Gata No. 403 and 404 was required to be restored to its original position. Accordingly, the Bench headed by the Hon’ble the Chairperson of this Tribunal rejected the plea of respondents no. 1, 3 to 5 that they will create another water body in the adjoining land available to them for the reason that a natural water body created on account of existing topography and distinctive ecological and hydrological features cannot be replaced by an artificially created water body at a different location which may not have such recharge channels and sustainability particularly so when such artificially created water body has been expressly excluded from the definition of ‘Wetland’ given under Section 2(g) of the Wetland (Conservation and Management) Rules, 2017 and directed the State Wetland Authority of State of U.P. and the respondent no. 3, District Magistrate, Amroha to ensure that the water body at Gata No. 403 and 404 is restored to its original position. To ensure that in this process, the interest of the students, if any, studying in the educational institution set up by respondents no. 1, 3 to 5 on the land of the water body may not be made to suffer, one year time was granted to respondents no. 1, 3 to 5 to relocate the infrastructure constructed on the water body to an appropriate location.
Order dated 17.02.2025 passed in above mentioned case was upheld by Hon’ble Supreme Court by order dated 04.04.2025 passed on Civil Appeal No. 4361/2025 filed against the same by disposal thereof with mere extension of time granted for relocation of the infrastructure by two years from the date of the order.
In the present case, the Administrator, HSVP, Gurugram has submitted in reply dated 31.03.2026 that encroachments mentioned in the report were made after passing of status quo order dated 25.05.2015 in CWP No. 10558/2015 and the same shall be removed as per law by the Estate Officer-II, HSVP, Gurugram who is custodian of the land in question through her Survey Team.
Since the encroachments are stated to have been made after passing of status quo order dated 25.05.2015 passed by Hon’ble Punjab and Haryana High Court in CWP No. 10558 of 2015 titled as Bheem Singh Kashyap and Others Vs. State of Haryana and Others the constructions raised by the encroachers in the pond area are not thereby protected. Consequently the encroachments and constructions in question are liable to be removed in compliance of directions given by Hon’ble Supreme Court in Hinch Lal Tiwari and others Vs. Kamala Devi and others (2001) 6 SCC 496 and Jagpal Singh and others Vs. State of Punjab and others (2011) 11 SCC 396.
Accordingly, the respondents are directed to remove the encroachments and constructions over the pond in accordance with law and to restore/rejuvenate the pond as per directions given by Hon’ble Supreme Court and this Tribunal and CPCB Guidelines.
The present Original Application is disposed of accordingly with directions as mentioned above.
A copy of this order may be sent to the applicant and the respondents by e-mail for information/requisite compliance.