Judgment
This order shall dispose of Show Cause Notice no. F.1(92)/RERA/PR/2019/1318 dated 10.06.2022 issued to the Noticee for violation of Section 7 of Real Estate (Regulation and Development) Act, 2016 (hereinafter referred as RE(RD) Act, 2016 or The Act).
An RTI application was received by the Authority enclosing therewith, inter-alia, an advertisement by the Noticee soliciting investment in its real estate project named “Devika Sadar Bazar,” bearing RERA registration number DLRERA2021P0001, assuring 12% Assured Returns till possession and guaranteeing 9% Lease Rental thereafter. The Applicant alleged that the said offer by the promoter is in violation of the provisions of RE(RD) Act, 2016 and sought information about action taken by Real Estate Regulatory Authority (RERA) Delhi against the Promoter. Applicant further requested that if no action has been initiated by RERA against the above promoter/builder on the ground that the said breach has not come to the knowledge of RERA Authority, the RTI application may be treated as a complaint for the purpose of initiating appropriate action against the concerned promoter.
Taking Suo-Moto cognizance of the matter, the Authority issued Show Cause Notice No. F.1(92)/RERA/PR/2019/1318 dated 10.06.2022 to the promoter M/s Hiptage Infrastructure Pvt. Ltd. for the said real estate project. In his reply dated 20.06.2022, the Noticee stated that the Respondent/Noticee has not promised/committed any Assured Returns. The Noticee further informed that he has allotted some of the units of the project to M/s Devika Universal Lands Pvt. Ltd. (hereinafter referred as ‘DULPL’) who is re-selling the units and offering Assured Returns to the subsequent purchasers.
Therefore, notices were issued to DULPL who were also made a party to the present Suo-Moto proceedings.
Noticee filed replies on 20.06.2022 & 22.07.2022 and submitted documents on 04.10.2022. Vide reply dated 30.11.2022, the Noticee also submitted details of payments received from DULPL. Written submissions were filed by the Noticee on 11.04.2023. Respondent No. 2 DULPL joined the proceedings on various dates, submitted documents/information on 07.02.2023 and filed written submissions on 11.04.2023.
Securities and Exchange Board of India (SEBI) forwarded to this Authority another complaint about unregistered collective investment schemes offered by various real estate companies/builders, including Respondents No.1/ Noticee, informing that the Respondent Company is neither listed on stock exchange nor is registered with SEBI as an intermediary. SEBI requested this Authority for necessary action because the matter is in the nature of real estate matter and falls under regulatory purview of Delhi Real Estate Regulatory Authority.
A. BRIEF FACTS
Brief facts of the case, as borne out from the records, are that the North Delhi Municipal Corporation (North DMC) decided to develop and implement a Multi-Level Car Parking cum Commercial Complex under Public Private Partnership model on its land admeasuring 1335.52 square meters situated at Qutub Road, Sadar Bazar, Delhi. The project consisted of development of multi-level car parking for minimum 176 car parking spaces (ECS) operated by the Concessionaire for a period of 5 years with concession period for 7 years. A Commercial Complex was also to be developed at the site and leased out to the Concessionaire for a 99 years lease period.
North DMC invited proposals from eligible bidders. The bid submitted by a Consortium consisting of M/s Shomit Finance Limited and M/s Oasis Suppliers Private Limited was accepted on 08.03.2019. The Consortium further promoted and incorporated a Special Project Company (SPC) named M/s Hiptage Infrastructure Private Limited. The said SPC, in the capacity of Concessionaire, entered into a Concession Agreement with North DMC on 02.04.2019.
The Concession Agreement stipulated that the commercial space developed by the Concessionaire shall be leased by North DMC (Lessor) to the Concessionaire (Lessee) on the terms and conditions set out in the lease deed. After entering into the lease deed, the Concessionaire can sell the units/shops/built-up areas of the Commercial Complex to third parties. To facilitate such sales, North DMC (the Lessor) agreed to execute Sub Lease Deeds in favour of third parties nominated by Concessionaire (the Lessee). The Concessionaire was to be the confirming party to such Sub-Lease Deeds. After signing of the Concession Agreement and getting the building plans sanctioned, the Concessionaire was allowed to market and book, including license or right to use, its part of the buildable area/commercial units in favour of allottee(s) as per applicable “RERA Guidelines”. The Concessionaire was also permitted to enter into commercial arrangement with its allottee(s) and the approval of North DMC was not to be required for such purpose.
The Concessionaire (i.e. Respondent No. 1) got building plans sanctioned from competent sanctioning Authority (i.e. North Delhi Municipal Corporation) on 17.12.2019 for development of such Multi-Level Parking including a Commercial Complex. The project comprised of one multi storeyed building having two basements and five floors. The Commercial Complex consisted of ground floor and first floor. The remaining floors were to be utilised for parking. 49 commercial shops were sanctioned on ground floor and 42 shops on first floor.
The Concessionaire named the project as “Devika Sadar” and applied for registration of the said real estate project with the RERA Delhi. Along with the application for registration of the project, the promoter also submitted a sample copy of Allotment Letter and Agreement for Sale along with other documents.
The RERA, Delhi registered the project “Devika Sadar” on 19.01.2021 and granted it a Registration Certificate bearing registration number DLRERA2021P0001. It also approved the Allotment Letter and Agreement for Sale proposed by the promoter/Respondent No. 1.
M/s Hiptage Infrastructure Pvt. Ltd., the promoter, allotted all shops on first floor of the project, bearing nos. F-1 to F-39, with carpet area totalling to 5440.687 square feet, to DULPL and executed an Agreement for Sale dated 06.01.2022 in favour of DULPL for a sum of Rs. Forty Crore Seven Lacs and Ten Thousand (Rs. 40,07,10,000/-) only. The promoter also termed the Agreement for Sale as Agreement for Sub Lease.
Through the said Agreement for Sale dated 06.01.2022 the promoter (M/s Hiptage Infrastructure Pvt. Ltd.) granted, inter-alia, the following rights in the allotted Retail Space to the Allottee (DULPL).
The Allottee shall be at a liberty to sell the space(s) of the Unit in part or full to third parties of its choice on commercial terms it deems fit.
Upon sale of space(s) to third party(ies), the Allottee shall ensure execution of a fresh Agreement between the Promoter (M/s Hiptage Infrastructure Pvt. Ltd.) and the new allottee i.e third party(ies) and the original Allottee (DULPL) shall become a “confirming party” to said fresh Agreement, re-affirming the terms and conditions of Sub-lease Agreement.
The original Allottee (DULPL) may enter into other Agreement(s), understandings etc. with third party(ies) and abide by such terms and conditions thereof.
The Allottee shall undertake and indemnify the promoter against all such claims, losses, demands, etc. that may be raised by any third party(ies).
The obligation to pay as per the Schedule of payments shall be that of the Allottee only and shall not be dependent upon recovery of payments from third parties.
In due course, DULPL solicited applications from interested third parties and sold the commercial units to those third parties.
After sale of shops to third parties by DULPL: neither issued any Allotment Letter to the third parties/new allottees, nor executed any Agreement for Sale to sell with them. Instead, M/s Hiptage Infrastructure Pvt. Ltd entered into fresh Agreement for Sale with new allottees/third parties as “Promoter” for sale of the commercial shops. M/s Devika Universal Lands Pvt. Ltd. co-signed the said Agreement as “confirming party”.
It was also mentioned in the Agreement that the Company (DULPL) has right to sell the shops allotted to it on first floor of the project (termed as Larger Commercial Space) to third parties by virtually dividing/bifurcating the larger space into smaller areas and further claiming that the Promoter has agreed to execute the Agreements in respect of the said virtual spaces in favor of the third parties identified by the Company.
The Agreement further claimed that the new purchaser is an investor desirous of investing in the said project and has requested the Company to allot undivided, unpartitioned and non-lockable unit in the said Larger Commercial Space. The new purchaser shall not claim physical possession of the said unit and that the possession shall mean deemed virtual possession only.
During the proceeding the promoter M/s Hiptage Infrastructure Pvt. Ltd. furnished a copy of Agreement for Sale. Allottee DULPL furnished a copy of sample Agreement executed between M/s Hiptage Infrastructure Pvt. Ltd., third party (sub allottee or new allottee) and allottee DULPL., sample copy of Agreement for payment of Commitment Charges, sample copy of Investor Adherence Letter/Deed and Escrow Account Agreement. Few complaints have been received by the Authority against the default by the promoter in the present project “Devika Sadar Bazar”. Documents filed in one complaint titled Abhishek Khanna V/s M/s Hiptage Infrastructure Pvt. Ltd. (Complaint No. Com/10/08/2023) have been considered for better understanding of the present case and copy of above mentioned complaint has been kept on records.
In all, following Agreements and other legal documents were entered into between, the Promoter M/s Hiptage Infrastructure Pvt. Ltd., the Allottee DULPL and third party/new allottee(s)/subsequent purchaser(s):
Agreement for Sale (Agreement for Sub-Lease) dated 06.01.2022 between Promoter M/s Hiptage Infrastructure Pvt. Ltd. and Allottee DULPL for sale of 49 shops on first floor.
Agreement for Sale between the Promoter M/s Hiptage Infrastructure Pvt. Ltd. and new allottee/third party for sale of virtual shops. DULPL became cosignatory/confirming party to the said Agreement.
Memorandum of Understanding between DULPL and new allottee/third party for payment of commitment charges and guaranteed rent by allottee M/s Devika Universal Lands Pvt. Ltd.
Letter by DULPL to the new allottee/third party indicating amount of commitment charges payable per month and due dates of payment.
Escrow Account Agreement between DULPL and IDFC First Bank Limited appointing IDFC First Bank Limited, as the account Bank, for operating and maintaining the Escrow Account and terms and conditions thereof.
Investment Adherence Letter to new allottee/purchaser from DULPL giving details of purchaser and amount and due date of payment of the investment return amount.
Upon receiving the RTI complaint, the Authority issued Show Cause Notice under Section 7 of the RE(RD) Act, 2016 to M/s Hiptage Infrastructure Private Limited for indulging into unfair and fraudulent practice for offering Assured Returns not mandated by the said RE(RD) Act 2016. In response, Promoter M/s Hiptage Infrastructure Private Limited informed that they have not offered Assured Returns. They have allotted shops on 1st floor to DULPL, who in turn, have promised 12% Assured Returns till possession and 9% Lease Guarantee to the purchasers of commercial shops.
DULPL were subsequently impleaded as a party in the matter and notices were issued to DULPL.
Allottee, DULPL, in their reply, have confirmed that they have promised 12% Assured Returns till possession plus 9% Lease Guarantee to the purchasers of commercial shops.
B. SUBMISSIONS MADE BY RESPONDENT NO. 1 M/S
HIPTAGE INFRASTRUCTURE PVT. LTD.
The submissions/arguments of the Noticee/Respondent M/s Hiptage Infrastructure Private Ltd. are summarised as under:
The Noticee is not offering any form of Assured Return to its Allottees. The Noticee has merely entered into an ordinary Agreement to Sub-lease with its Allottees without any sort of commitment to pay any form of returns etc. However, the Noticee has given liberty to the Allottee to further sell/sub-lease the space, in part or full, to any third party of its choice on any terms and conditions deemed fit by the Allottee. Upon sale of space to any third party, the Allottee shall ensure execution of an Agreement afresh between the Noticee and the new allottee i.e a third party with the Allottee being the confirming party, re-affirming the terms and conditions of the Sub-lease Agreement. The Allottee is free to enter into other Agreement(s), understandings etc. with third party.
The Agreement executed between the Noticee and its Allottee and the Agreement executed between the Allottee and the third party are two distinct and different Agreements. Each of these Agreements have their own contractual obligations to be fulfilled by the parties thereof. Therefore, any Agreement executed by the Allottee of the Noticee cannot be attributed to the Noticee and the Noticee cannot be held liable for fulfilment of any such obligation.
That RE(RD) Act, 2016 is only applicable in relation to a promoter in respect to his project and his obligation toward the allottees. The aim & purpose of the RERA Act, 2016 is to protect the interest of the consumers in the real estate sector and not for protecting the commercial agreement entered for profit purposes. The RE(RD) Act, 2016 does not contemplate any restrictions/prohibition on pricing of the Real Estate and/or payment of any returns including assured/fixed returns.
Any Agreement for payment of return/commitment charge etc. is an ‘independent commercial agreement’ between two parties for commercial gain. Such agreement between the parties would have the “commercial effect” as both the parties have “commercial” interest in the property.
There is no provision under the RE(RD) Act, 2016 for examining and deciding the issues relating to payment of Assured Return/Commitment Charges or commercial effect in an Agreement entered between two parties, being an allottee and subsequent allottee, for purchase of a space in a real estate project. Therefore, the Ld. Authority lacks the jurisdiction to entertain or adjudicate upon the matters pertaining to any Assured Returns or Fixed Returns over an investment.
In view of the above, Respondent No. 1 has submitted that there has been absolutely no violation of Section 7 or any other provision of the RE(RD) Act, 2016 by the Noticee and has prayed that the Ld. Authority may be pleased to dispose of the Suo Moto proceedings.
C. SUBMISSIONS MADE BY RESPONDENT NO. 2 M/S
DEVIKA UNIVERSAL LANDS PRIVATE LIMITED
The submissions/arguments made by Respondent No. 2 DULPL are summarised as under:
DULPL had applied for booking/allotment of commercial space in the project “Devika Sadar” being developed by the Promoter, M/s Hiptage Infrastructure Private Limited. A registered Agreement to Sub-Lease dated 06.01.2022 was executed between the DULPL and the Promoter, wherein the Promoter allotted commercial space admeasuring 5414.687 sq. ft. to DULPL in the project for a total consideration of Rs. 40,07,10,000/-.
That upon the allotment of the aforementioned commercial space, DULPL became an Allottee, covered under the definition as provided under Section 2 (d) of the RERA Act, 2016.
DULPL is an Allottee with the right to create third-party right. As per Clause 1.8 (iv) of the Agreement for Sub-Lease dated 06.01.2022, DULPL is at liberty to sell/sub-lease the allotted area in part or full to any third party of its choice and on such terms and conditions as deemed fit to DULPL with the consent of the Promoter. The Agreement for Sub-Lease further provided that after sale of a part of the allotted space to third-party, DULPL, the Promoter and the Third Party (i.e. new allottee) would enter into a fresh agreement affirming the terms and conditions of the Agreement for Sub-Lease dated 06.01.2022. That the relevant portion of Clause 1.8 (iv) of the Agreement for Sub-Lease is reproduced hereinbelow:
“The Allottee shall be at a liberty to sell the space(s) of the Unit in part or full to third parties of its choice on commercial terms deemed fit by the allottee as sole/joint holders. Upon sale of space(s) to third party(ies), the Allottee shall ensure execution of an Agreement afresh between the promoter, the new allottee i.e. a third party(ies) and the Allottee as the confirming party, re-affirming the terms and conditions of this Sub-Lease Agreement. It is clarified that the Allottee is free to enter into such other Agreement(s), Understandings etc. with third party(ies) and abide by such terms and conditions thereof…”
DULPL has further submitted that the transaction contemplated in the present case is similar to the practice of endorsement prevalent in the Real Estate Sector. Accordingly, while sub-leasing a portion of its allotted area of 5414.687 sq. ft. to a subsequent allottee, DULPL, in adherence with the Agreement for Sub-Lease dated 06.01.2022, executes a fresh Agreement with the subsequent allottee wherein the Promoter is also a party. That vide the said tripartite Agreement DULPL re-affirms the terms and conditions of the Agreement for Sub-Lease dated 06.01.2022, and upon the execution of the tripartite Agreement the new Allottee becomes the Subsequent Allottee and acquires the same rights and liabilities as that of an Original Allottee.
DULPL has substantiated this with an example: ‘A’ has purchased a residential unit from X-a Promoter/Developer- and executed a builder Buyer Agreement. However, due to some reason ‘A’ being in need of funds, further sells off this allotment to a ‘B’ a third party/Subsequent Allottee with the consent of the Promoter and the said Builder Buyer Agreement is endorsed in favour of ‘B’. Thus, in this situation ‘A’ becomes the “Original Allottee” and ‘B’ became the “Subsequent Allottee”.
It is stated that it is common practice in the real estate sector that the original allottee further sub-leases/sells their space to a third party, at a suitable price as agreed between the Original Allottee and Subsequent Allottee, thereby making the new allottee the Subsequent Allottee which is why the word subsequent allottee is included in the definition of allottee as provided under Section 2 (d) of the RE(RD) Act, 2016.
In view of the aforementioned submissions, it can be concluded that DULPL is not a Promoter as they are neither the lessee of the land nor responsible for construction of the Project. For all purposes they are ‘Allottees’ falling withing the definition of an Allottee as provided in Section 2 (d) of the RERA Act, 2016.
DULPL does not fall within the definition of a Real Estate Agent. Primary ingredient for classifying any person as a Real Estate Agent is that:
There must be some negotiation on behalf of a person, who has the right to sell/transfer such property and
is paid “remuneration/fees/commission” for the services provided by him.
Section 2(zm) is reiterated herein below for ready reference:
Section 2(zm) “real estate agent” means any person, who negotiates or acts on behalf of one person in transaction of transfer of his plot, apartment or building, as the case may be, in a real estate project, by way of sale, with another person or transfer of plot, apartment or building, as the case may be, of any other person to him and receives remuneration or fees or any other charges for his services whether as commission or otherwise and includes a person who introduces, through any medium, prospective buyers and sellers to each other for negotiation for sale or purchase of plot, apartment or building, as the case may be, and includes property dealers, brokers, middlemen by whatever name called”
That in the present case, DULPL is not negotiating any deal on behalf of the Promoter. In fact, DULPL has acquired the right to sell/transfer its allotted area of 5414.687 sq. ft. by paying valuable consideration for the same thereof to the Promoter.
Further, DULPL is not receiving any remuneration/fees/commission from the Promoter for further selling/transferring its allotted area of 5414.687 sq. ft. Therefore, since both the key ingredients as contemplated by the definition of Section 2(zm) are not fulfilled, DULPL cannot be termed as a Real Estate Agent but are vested with an interest in the property of being Allottee.
The arrangement of commitment charges between the Allottee and subsequent allottee is a commercial transaction, and therefore, the agreement governing the terms and conditions of commitment charges is outside the jurisdiction of the Ld. Authority. It is important to bring it to the knowledge of the Ld. Authority that while sub-leasing the commercial space further by DULPL, certain subsequent allottees negotiated for a payment of commitment charge on monthly basis after payment of lump sum amount towards allotment of their Unit. This amount is to be paid in a timely manner as agreed between DULPL and the Subsequent Allottees, for which separate agreement has been executed between the DULPL and the subsequent allottee.
xii.That the arrangement between DULPL and the subsequent allottee is a commercial transaction between the two private parties, wherein both the parties have the main objective of commercial interest from the transaction. Such commercial transactions have been purposefully left out from the RE(RD) Act, 2016 by the legislature while drafting the Act.
xiii.It is further clarified that RE(RD) Act, 2016 does not contemplate any restrictions/prohibitions on pricing of the Real Estate property and/or payment of any returns/rebates. Nor the RE(RD) Act, 2016 has any provision regulating payment of any such Commitment Charges. Therefore, the Ld. Authority has no jurisdiction in the matter of payment of Commitment Charge as DULPL is neither a Developer nor a Promoter.
xiv.DULPL has informed that the amount which has to be paid as Commitment Charges to the subsequent allottee has already been secured by it by entering into an arrangement with M/s IDFC First Bank Ltd., wherein a deposit of an amount equivalent to the total Commitment Charges payable to a subsequent Allottee has already been made. And when the specific date for the payment of Commitment Charges arrives as per the time schedule, the money from the deposits shall be paid directly to the subsequent Allottee. Since the money to be paid as Commitment Charges is secured in the form of a deposit therefore, by no stretch of the imagination it can be said that there is any danger or risk involved in the payment of Commitment Charges. Further DULPL is paying ‘Commitment Charges’ at the request of the Third Party (“Sub-Allottee”) who has invested in a unit forming part of the larger commercial space leased out to DULPL (“Allottee”) by M/s Hiptage Infrastructure Pvt. Ltd. (“Promoter”).
xv.It is submitted that the RE(RD) Act, 2016 empowers the Authorities constituted under the provisions of the said Act to raise questions on the Agreement for Sale only. However, in the present case the Agreement for Commitment Charges is not an Agreement for Sale. The Agreement for Commitment Charges is rather a commercial arrangement with respect to payment of Commitment Charges between the two parties/allottees. Therefore, the same is not within the purview of the Ld. Authority.
xvi.For the payment of ‘Commitment Charges’, DULPL has entered into a completely separate and standalone understating with the Third Party, in form of a letter, whereby the terms and conditions of the Commitment Charges have been laid down. This understanding is a commercial contract between two Allottees and does not involve the Promoter in any manner nor is related to the Agreement to Sub-Lease in any form. Therefore, document does not fall within the ambit of documents for which registration is compulsory as per Section 17 of the Registration Act, 1908. It is further submitted that the understanding/letter has no real estate transaction conferring any transfer of any right, title or interest in any immovable property which may require registration of the same under Section 17 of the Registration Act, 1908.
D. ANALYSIS AND OBSERVATIONS
D.1: JURISDICTION OF THE AUTHORITY
The Respondents have raised preliminary objections regarding jurisdiction of the Authority to entertain present complaint.
Respondent No. 1 M/s Hiptage Infrastructure Private Limited has argued that the Act does not contemplate any restrictions or prohibitions on pricing and/or payment of any returns including Assured/Fixed Returns in a real estate project and, therefore, the Authority lacks the jurisdiction to entertain or adjudicate upon the matters pertaining to Assured Returns/Commitment Charges/Fixed Returns over an investment. They have further argued that any form of payment of return or Commitment Charges etc. are ‘Independent Commercial Agreements’ between two parties, both of whom have the main aim of commercial gain from the transaction. Such Agreements between the parties would have the “commercial effect” as both the parties have “commercial” interest in the property. The RE(RD) Act, 2016 has jurisdiction over the consumer interest in real estate sector and not over the commercial transactions entered for profit purposes. The Assured Returns/Commitment Charges are commercial transactions between the Allottee and the subsequent allottees and therefore, would not fall under the purview of the RE(RD) Act, 2016. There is no provision under the RE(RD) Act, 2016 for examining and deciding the issues relating to the provisions of Assured Return/Commitment Charges or commercial effect in an Agreement entered between two parties, being an allottee and subsequent allottee, for purchase of a space in a real estate project.
Respondent No. 2 DULPL have argued that the RE(RD) Act, 2016 does not contemplate any restrictions/prohibitions on pricing of the Real Estate property and/or payment of any returns/rebates. Also, the RE(RD) Act, 2016 does not have any provision regulating payment of any such Commitment Charges. Therefore, the Agreement governing the terms and conditions of commitment charges are outside the jurisdiction of RE(RD) Act, 2016. Therefore, the Ld. Authority has no jurisdiction in the matter of payment of commitment charges. Respondent No. 2 is neither a Developer/Promoter, nor a real estate agent.
Arguments of the Respondents have been considered. Perusal of records reveal that Respondent No. 1 M/s Hiptage Infrastrure Pvt. Ltd. and/Respondent No. 2 DULPL have issued an advertisement on the web portal 99 acres.com advertising the Real Estate Project “Devika Sadar Bazar”. Hardcopy of said Advertisement is available on records. In the advertisement on the said portal the Respondents have mentioned that ‘Devika Sadar Bazar’ is spread in 1600 square yards with approximately 90 shops on GF and 1st Floor. Construction is in progress and possession is by year 2022. Sadar Bazar is Asia’s most dense and diverse whole sale market. No vacant plot is currently available at Sadar Bazar. Devika is building world class and most promising potential business hub arena. The advertisement further states that units are available for sale in Devika Sadar Bazar project and this is an opportunity to own a unit by investing as low as Rs. 26.4 lakhs. Those who are interested in purchasing commercial space in Devika Sadar Bazar may contact the advertisers. The advertisement further promises 12% Assured Return till possession and guaranteed 9% Lease Rentals thereafter. The advertisement further states that by investing Rs. 26.40 lakhs one can earn Rs. 26,400/- per month.
The web portal 99 acres.com is a portal for Real Estate properties and transactions and is not a portal for investment or financial transactions. The Respondents issued advertisement on a real estate web portal for sale of shops/commercial units in the real estate project being developed by them. Respondents did not advertise for investment in the financial schemes offered by them. The promoters promised Assured Returns and guarantee of Lease Rental in addition to delivery of a shop. The consumers approached the promoters for purchasing a shop/commercial space in the real estate project. Consumers did not approach the Promoters/Respondents for making any financial investment. Consumers made a real estate transaction and not a commercial transaction. All real estate transactions involve payment of money. The money paid by the so called new Allottees to the Respondents for purchase of a shop can only be treated as real estate transaction. It cannot be treated as a commercial transaction. Therefore, the contention of the Respondents that payment of money by new Allottees is a commercial transaction is hereby rejected. For the same reason the contention of the Respondents that payment of assured returns/commitment charges in return of the sale consideration is a commercial transaction and does not fall under purview of this Authority, is also rejected. In the instant case, the promise of Assured Returns is a part of a real estate transaction and therefore, this Real Estate Regulatory Authority has jurisdiction over the matter.
It may further be seen that SEBI, vide its letter number SEBI/NRO/NRO/NRO/P/OW/2023/510030444/1, forwarding the complaint against the Respondent No. 1 to this Authority, has mentioned that the company M/s Hiptage Infrastructure Pvt. Ltd. is not listed on stock exchanges and is also not registered with SEBI as an intermediary. SEBI has stated that the matter is in the nature of real estate and falls under the regulatory purview of Real Estate Regulatory Authority, Delhi. Thus, SEBI has also affirmed that this Authority has jurisdiction over the matter.
It would be pertinent to note that SEBI has issued detailed guidelines regarding schemes that can be treated as collective investment schemes and companies which can be treated as collective investment management company. As per SEBI guidelines only a company incorporated under the provisions of companies Act, 1956 and registered with SEBI under the SEBI (Collective Investment Schemes) Regulations 1999, and whose object is to organise, operate and manage a collective investment scheme, can float schemes or arrangements under which deposits can be accepted. SEBI has stated that the Respondents are not registered with SEBI. Respondents have not shown any document showing that the Respondents have obtained approval of SEBI for accepting deposits from the consumers. Therefore, legally, the Respondents cannot collect money from consumers promising Assured Returns on such deposits. The money collected by the Respondents from the consumers cannot be treated as commercial investment or commercial transaction. Therefore, the claim of the Respondents that the money collected from the consumers is commercial transaction is not accepted.
The Banning of Unregulated Deposit Schemes Act, 2019 does not permit investment schemes promising assured returns unless they are approved by SEBI/Appropriate Regulator. The Respondents have failed to show approval of SEBI/ Regulator for their alleged scheme of Assured Returns/Commitment Charges. Therefore also, the claim of the Respondents that Assured Returns/Commitment Charges are commercial transactions is not tenable.
Therefore, such transaction of Assured Returns/Commitment Charges falls under purview of the RE(RD) Act 2016 and RERA, Delhi has jurisdiction over such transactions. Therefore, the contention of the Respondents that this Authority has no jurisdiction in the matter of payment of commitment charges is hereby rejected.
D. 2: VOILATIONS OF CONCESSION AGREEMENT OF NORTH DMC:
It may be seen that Respondent No. 1 M/s Hiptage Infrastructure Pvt. Ltd., entered into a Concession Agreement with North DMC on 2.04.2019. The Concession Agreement stipulated that the commercial space developed by the Concessionaire shall be leased by North DMC (Lessor) to the Concessionaire (Lessee) on the terms and conditions set out in the said Agreement.
The said Concession Agreement stipulated that the Concessionaire shall, at their cost, prepare a scheme (the “Commercial Facility Scheme” or the “CF Scheme”) relating to the construction and the built-up areas. The CF Scheme shall, inter-alia, contain the construction schedule, the details of the total built up area and common areas and the master plan. The CF Scheme shall mandatorily comply with the RE(RD) Act 2016 and the Concessionaire shall periodically intimate North DMC with respect to such compliance.
The Concession Agreement further stipulated that Concessionaire shall, upon signing of the Concession Agreement and after obtaining the building plan sanction and applicable permits, be entitled, at its cost, risk and consequence, to market, accept booking applications, make allotment and enter into agreements, including license or right to use, between the Concessionaire and such applicants/lessees, for the buildable/built up area at the commercial facility with any person on mutually agreed terms and conditions, and as per applicable “RERA Guidelines” and the approval of North DMC would not be required for such purpose. The Concessionaire (Lessee) shall also be permitted to sub lease its lease hold rights over the built-up areas of the commercial facilities to any third party by way of Sub Lease Deeds between the North DMC (the Lessor) and the third party and the Concessionaire being the confirming party to the sub lease. Further, upon signing of the Concession Agreement, the Concessionaire shall be eligible to enter into any other commercial arrangement with an allottee.
The Concession Agreement further stipulated that Concessionaire may charge, demand and collect the Premia for the buildable/built up areas in the CF from the sub-lessees/ allottees/other persons at market driven rates. Premia is defined as the amounts of money that the Concessionaire may, demand, charge, collect, retain and appropriate from the applicants (persons making bookings)/Allottees/lessees/other persons in respect of the built-up areas in the Commercial Facility at the market driven rates determined by the Concessionaire. The Concession Agreement further stipulated that all payments of Premia shall be made by the Allottees/other persons shall be made in accordance with RE(RD) Act 2016.
It may thus be seen that the scheme of Concession Agreement dated 02.04.2019, signed between the Concessionaire and North DMC, provided that the commercial shop being constructed by the Concessionaire could be allotted/sold to the allottees as per RERA provisions and by way of a Sub-Lease Deed between the allottee and the North DMC (Lessor). The Concessionaire (Lessee) would be the confirming party. All payments of premia shall be made in accordance with RE(RD) Act 2016.
However, this has not been done. The Promoter M/s Hiptage Infrastructure Pvt. Ltd. sold the shops to Allottee DULPL. However, sub lease deed between the North DMC and the Allottee DULPL was not executed. Promoter M/s Hiptage Infrastructure Pvt. Ltd. also did not become a confirming party to said sub-lease deed. Instead, the promoter M/s Hiptage Infrastructure Pvt. Ltd. executed an Agreement for Sale between them self and Allottee DULPL on 06.01.2022. This was against the provisions of Concession Agreement. Such Agreement for Sale/Sub-Lease Deed also gave rights to the allottee DULPL ultra vires to the Concession Agreement leaving a scope to manipulate subsequent sales by offering Commitment Charges and Guaranteed Lease Rentals in violation of the Concession Agreement dated 02.04.2019.
D.3: VOILATIONS OF AGREEMENT FOR SALE APPROVED BY AUTHORITY
As per provisions of Section 4 (2) (g) of RE(RD) Act, 2016, every Promoter, while making application to the Authority for registration of his Real Estate project, shall enclose proforma of the Allotment Letter, Agreement for Sale and the Conveyance deed proposed to be signed with the Allottees.
Accordingly, at the time of registration, the Respondents submitted a sample copy of Agreement for Sale to be executed between Respondents and the allottees. The Authority approved the same.
However, it is seen that the Promoter entered into an Agreement for Sale with the Allottee DULPL whose terms and conditions are very different from the terms and conditions of Agreement for Sale approved by the Authority. The new Agreement entered between M/s Hiptage Infrastructure Pvt. Ltd. & DULPL permits the later to sell virtual shops, to offer 12% Assured Returns till possession and guarantees 9% Lease Rental per month. The Agreement for Sale approved by the Authority did not contain such conditions. This is a violation of provision of Section 7 (1) (b) of the RE(RD) Act, 2016.
The National Capital Territory of Delhi Real Estate (Regulation and Development) (Agreement for Sale) Rules, 2016 prescribes a model format for Agreement for Sale to be executed between the Promoter and the Allottees. The Agreement for Sale executed by Promoter M/s Hiptage Infrastructure Pvt. Ltd. with new Allottees (third parties) is at variance with the model “Agreement for Sale” prescribed in the Agreement for Sale Rules 2016, and contained terms & conditions not permitted by model Agreement to Sell. Thus, the promoter M/s Hiptage Infrastructure Pvt. Ltd. has violated provisions of the RE(RD) Act, 2016.
D. 4: SALE OF VIRTUAL SHOPS:
DULPL further claimed that the Company has right to sell the shops to third parties by virtually dividing/bifurcating the larger space into smaller areas and that the Promoter has agreed to execute the Agreements in respect of the said virtual spaces in favor of the third parties identified by the Company. The Agreement further clarified that the new purchaser has requested the Company to allot undivided, unpartitioned and non-lockable unit in the said Larger Commercial Space. The new purchaser shall not claim physical possession of the said unit and that the possession shall mean deemed virtual possession only.
Thus, the Promoter M/s Hiptage Infrastructure Pvt. Ltd. have sold virtual shops to new purchasers.
Sale of virtual shops is against the provisions of RE(RD) Act, 2016.
These virtual shops do not conform with the building plans sanctioned by North DMC because the size of the shops is different from the size of shops approved in the sanctioned building plans. Sale of shops whose specifications are different from the specifications prescribed in the sanctioned building plan is in violation of the RE(RD) Act, 2016.
The RE(RD) Act 2016 also mandates that after completion of construction, the physical possession of the shops shall be handed over to the allottee. The RE(RD) Act, 2016 does not permit the Promoter to refuse to hand over the possession after completion of unit/project. Therefore, conditions stipulating that the physical possession would not be handed over to the Allottee(s) is also against the provisions of the RE(RD) Act, 2016.
D.5: COMMITMENT CHARGES AND GAURANTEED LEASE RENTAL:
The Promoter M/s Hiptage Infrastructure Pvt. Ltd., through Agreement for Sale dated 06.01.2022, granted to the Allottee DULPL, the right to sell the space of the Unit, in part or full, to third parties of its choice on its own commercial terms and to enter into such other Agreement, understandings etc. with third parties as it deemed fit. However, DULPL, did not issue any Allotment Letter or execute any Agreement to Sell with new Allottees/Third Parties. Subsequently, M/s Hiptage Infrastructure Pvt. Ltd., as the “Promoter”, entered into another Agreement with subsequent/new Allottees. DULPL, as the “Company”, became the co-signatory to said Agreement.
The Allottee DULPL also entered into a Memorandum of Understanding with the new Allottees/Purchasers committing to pay the Allottee a sum equivalent to 12% of the cost of unit per month as Commitment Charges and also agreed to pay them fixed amount of rent on monthly basis as Guaranteed Lease Rent till expiry of guaranteed rent period.
The “Introduction and Statement of Objects and Reasons” enumerated in the Real Estate (Regulation and Development0 Act, 2016 clarifies that the Act 2016 was introduced because the Real Estate sector was unregulated and lacked professionalism, standardization and adequate consumer protection. Apart from regulation and promotion of Real Estate sector, transparency in sale and contractual conditions, and protection of consumer interests in real estate sector, the Act 2016 also aims at.
Because, RE(RD) Act 2016 has standardised the business practices and transactions in real estate sector and made them uniform, therefore, the terms and conditions and financial transactions set out in any offer, Application form, Allotment letter, Agreement for Sale or any other related document, which bind the Allottee and the Promoter in a real estate relationship, must conform to the uniform and standardised transactions outlined in the RE(RD) Act, 2016.
In the present case, the transactions undertaken by the Promoter are different from the standardised transactions envisaged in the RE(RD) Act, 2016. The Promoter/Company has offered fixed returns on the investments made by the Allottee on specified rates and for specified durations (Commitment Charges). The Company has further assured the consumers to rent out the property to Tenants (Third Party Lessees/Brands) for a guaranteed monthly rental. The RE(RD) Act, 2016 does not envisage payment of Assured Returns and Guaranteed Lease Rentals by the developers. By offering such returns, the Promoter/Company has violated provisions of RE(RD) Act 2016.
D.6: SALE BY ALLOTTEE DEVIKA UNIVERSAL LANDS PVT. LTD. NOT AN ENDORSEMENT
The Promoter M/s Hiptage Infrastructure Pvt. Ltd. have stated that they have allotted shops to M/s Devika Universal Lands Pvt. Ltd. who has sold/allotted the under construction shops to third parties of its choice offering 12% Assured Returns (Commitment Charges) and 9% Lease Rental Guarantee.
DULPL have justified sale to third parties arguing that the transaction contemplated in the present case is similar to the practice of endorsement prevalent in the real estate sector, claiming that it is a common practice in the real estate sector that the original Allottee further sub-leases/sells their unit/spaces to a third party at a price agreed between the original Allottee and purchaser, thereby making the new Allottee, the subsequent Allottee as provided under Section 2 (d) of the RE(RD) Act, 2016.
They have substantiated this with an example: ‘A’ has purchased a residential unit from X-a Promoter/Developer-and executed a Builder Buyer Agreement. However, due to some reason ‘A’ being in need of funds, further sells this allotment to a ‘B’ a third party/subsequent Allottee with the consent of the Promoter and the said Builder Buyer Agreement is endorsed in favour of ‘B’. Thus, in this situation ‘A’ becomes the “Original Allottee” and ‘B’ became the “Subsequent Allottee”. Accordingly, while sub-leasing a portion of its allotted area of 5414.687 sq. ft. to a subsequent Allottee, DULPL, executed a fresh Agreement with the subsequent Allottee wherein the Promoter is also a party. Upon the execution of the tripartite Agreement the new Allottee becomes the subsequent Allottee and acquires the same rights and liabilities as that of an original Allottee.
The above argument of the Respondents is not tenable. It is to be pointed out that endorsement of sale in favour of subsequent buyer is a practice in the real estate sector. When a promoter sells a flat to an allottee, he records the sale in form of an Agreement for Sale executed between the Promoter and the allottee. When the Allottee sells his flat/unit, to another purchaser, before taking over possession of said flat/unit, the Promoter recognises such sale by adding name of new purchaser in the original Agreement for Sale and deleting the name of the Original Allottee from said Agreement for Sale. Thus, the Promoter endorses name of the new purchaser in the original Agreement for Sale executed between the Promoter and the Original Allottee. Alternatively, the Promoters execute a fresh Agreement to Sale with new Allottees which is exactly same as the Agreement executed with Original Allottee. This practice is called endorsement. In the instant case, instead of endorsing name of new purchaser in the original Agreement for Sale, the Allottee DULPL executed an altogether new Agreement with the new Allottee/Purchaser. Thus, the practice adopted in the present case is different from the practice of endorsement prevelant in the real estate sector. Therefore, the arguments of the Respondents that the transactions undertaken by them is similar to the practice of endorsement prevalent in the real estate sector is hereby rejected.
D.7: ACCEPTING 10% OF COST BEFORE AGREEMENT FOR SALE:
Section 13 (1) of the RE(RD) Act 2016 prescribes that the Promoter cannot accept more than 10% of the cost of unit without entering into an Agreement for Sale with Allottee. In the instant case the Promoter M/s Hiptage Infrastructure Pvt. Ltd. has accepted full cost of the real estate commercial shops i.e. Rs. Forty Crore Seven Lacs and Ten Thousand (Rs. 40,07,10,000/-) only from DULPL before entering and registering the Agreement for Sale. Thus, the Promoter has accepted more than 10% of the cost of unit before entering into an Agreement for Sale with the Allottee.
The Promoter has clarified that the Agreement for Sale dated 06.01.2022 was registered on 12.08.2022 as an annexure to another Agreement dated 20.04.2022. This explanation is not accepted. As per provision of Indian Registration Act 1860, an Agreement for Sale is required to be registered within four months from the date of execution. As such, the Agreement for Sale dated 06.01.2022 executed between the parties was required to be registered by 05.05.2022. The same has not been done.
The parties executed another Agreement on 20.04.2022 and the Agreement dated 06.01.2022 was annexed to said Agreement dated 20.04.2022 as an Annexure. The said Agreement dated 20.04.2022 was registered on 12.08.2022. Respondents have argued that Agreement dated 06.01.2022 be also considered to be registered on 06.01.2022.
Registering an Agreement as Annexure to some other main Agreement cannot be taken as Registration of Annexure. Therefore, it can be concluded that the Agreement for Sale dated 06.01.2022 has not been registered till date. It may also be noted that the Agreement has been registered as an Annexure to subsequent Agreement between the parties only after issue of Show Cause Notice by this Authority on 10.06.2022 and appears to be an afterthought to cover up the illegal Act of collecting/accepting more than 10% of the cost of the unit without registration of Agreement for Sale.
Therefore, it is observed that accepting an amount of more than 10% of the cost of real estate unit from the allottee before executing the Agreement for sale is violation of Section 13 (1) of RE(RD) Act, 2016.
D.8: M/S HIPTAGE INFRASTRUCTURE PVT. LTD. IS THE PROMOTER
In his reply dated 20.06.2022 the Promoter M/s Hiptage Infrastructure Pvt. Ltd. has stated that it has not offered any Assured Returns or Commitment Charges. It has allotted some of the units in the project to DULPL who is reselling the units and offering Assured Returns/Commitment Charges to the subsequent purchasers. Therefore, M/s Hiptage Infrastructure Pvt. Ltd. have stated that they are not accountable for offering Commitment Charges or any consequent violations of RE(RD) Act, 2016.
Vide Agreement for Sale dated 06.01.2022, the Promoter M/s Hiptage Infrastructure Pvt. Ltd. sold/allotted all the shops on first floor to Allottee DULPL giving it right to further sell/allot the shops/spaces of the unit, in part or in full, to third parties on commercial terms and also to enter into other agreements/understandings with third parties.
The Promoter M/s Hiptage Infrastructure Pvt. Ltd. executed another Agreement for Sale with subsequent allottees/purchasers (third parties), granting right to DULPL to sell the Larger Commercial Space to the third party by dividing/bifurcating the larger space into smaller areas only virtually and M/s Hiptage Infrastructure Pvt. Ltd. allotted such undivided unpartitioned commercial space in the Larger Commercial Space to third parties and agreed to execute the Agreements in respect of the said virtual spaces in favor of them.
The perusal of the Agreement reveals that all the responsibilities under the Agreement were assigned to, and lie with, the Promoter M/s Hiptage Infrastructure Pvt. Ltd. For example, it was responsibility of the Promoter M/s Hiptage Infrastructure Pvt. Ltd. to intimate to the Allottee the amount payable and provide the details of taxes paid, or demanded, along with Acts/Rules/Notifications. (Term 1.3 (iii) of the Agreement). Total price for the unit shall be payable as per payment plan directly to the Promoter (Point 2 of the MoU with third parties). The Promoter has the powers to allow early payment of instalments (Term 1.6). The Promoter is responsible for not making any addition and alterations in the sanctioned plans, layout plans and specifications except minor changes or alterations as may be necessary (Term 1.7). The Promoter is responsible to pay all outgoings before transferring the possession of the unit to the Allottee(s) (Term 1.12). The Allottee was required to make payments on demand by the Promoter (Term 1.13). The Promoter was responsible to offer possession of the unit on or before a specified date (Clause 7.1). The Promoter shall offer the possession of the unit to the Allottee in terms of the Agreement (Clause 7.2). The Promoter shall compensate the Allottee in case of any loss caused due to defective title of the land (Clause 7.6). The Promoter shall be responsible to provide and maintain essential services in the project (6(a)).
As can be seen from above, the entire Agreement is replete with duties and responsibilities assigned to the Promoter M/s Hiptage Infrastructure Pvt. Ltd. only. No duty or responsibility has been assigned to the DULPL. The Promoter M/s Hiptage Infrastructure Pvt. Ltd., through Agreement for Sale dated 06.01.2022, granted to the Allottee DULPL, the right to sell the space of the Unit, in part or full, to third parties of their choice on its own commercial terms and to enter into such other Agreement, understandings etc. with third parties as it deemed fit. DULPL sold the shops to third parties. However, DULPL, did not issue any Allotment Letter or execute any Agreement to Sell with new allottees/third parties. Only M/s Hiptage Infrastructure Pvt. Ltd. sold/transferred the rights in shops to third parties by entering into another Agreement with subsequent/new allottees as the “Promoter”. DULPL only became the co-signatory to said Agreement as the “Company”.
It may, therefore, be concluded that M/s Hiptage Infrastructure Pvt. Ltd. is the promoter with reference to the subsequent allottee(s) and shall remain responsible for violations mentioned in forgoing Sections.
E: FINDINGS AND CONCLUSIONS:
The Authority finds that the promoter accepted more than 10% of the cost of units from DULPL before entering into an Agreement for Sale with the Allottee. This is violation of Section 13 (1) of the RE(RD) Act, 2016 liable for penalty under Section 61 of the RE(RD) Act, 2016. The Authority hereby levies a penalty of Rs 50,00,000/- (Rs. Fifty Lakhs only) on the promoter M/s Hiptage Infrastructure Pvt. Ltd. for this violation.
It is held that M/s Hiptage Infrastructure Pvt. Ltd. has violated the terms and conditions of RE(RD) Act, 2016 by signing an Agreement for Sale dated 06.01.2022 with Allottee DULPL whose terms and conditions are different from the Agreement for Sale approved by the Authority. This amounts to violation of Section 7 (1) (b) of the RE(RD) Act, 2016. The Authority hereby levies a penalty of Rs. 1,00,00,000/- (Rs. One crore only) on the promoter M/s Hiptage Infrastructure Pvt. Ltd. under Section 61 of the Act.
The RE(RD) Act, 2016 does not envisage payment of Assured Returns and Guaranteed Lease Rentals by the developers. By offering 12% Assured Returns till possession and 9% Guaranteed Lease Rental thereafter, the promoters have violated provisions of RE(RD) Act 2016 [besides this being an unfair trade practice covered under provisions of Section 7(1)(c)]. The Authority, therefore, hereby levies a penalty of Rs. 2,00,00,000/- (Rs. Two Crore only) on the Promoter M/s Hiptage Infrastructure Private Limited.
The Promoter M/s Hiptage Infrastructure Pvt. Ltd. have sold virtual shops to the allottees of smaller size than the size approved in the sanctioned plan with condition stipulated that the physical possession would not be handed over to them. This is against Section 17 of the RE(RD) Act, 2016. The office is directed to issue a notice to the promoter as to why action should not be taken against them under Section 61 of the Act for this violation.
Copy of this order may also be forwarded to the Commissioner, MCD, Delhi and Chairman, Securities and Exchange Board of India (SEBI) for perusal and appropriate action.
Ordered accordingly.