Tribunals and CommissionsDivision Bench(2026) 08 NGT CK 7110

Sudhir Kumar Jha vs Gorakhpur Industrial Development Authority & Ors.

National Green Tribunal, Principal Bench, New Delhi · Decided on 25 August 2026

RESULT
Disposed Of
CASE NUMBER
Original Application No. 1152/2024

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

34 paragraphs · 1,323 words
1.

In this Original Application (O.A.), the applicant has made an allegation of violation of environmental norms by respondent no.2, an integrated steel plant of 3 lakh TPA and captive power plant of 30 MW capacity in GIDA industrial area, Gorakhpur.

2.

The applicant has alleged that residents of 12 villages in the vicinity of the industry are adversely affected on account of the black ash and smoke emitting from the chimney of respondent no.2 which were causing severe air pollution and creating health hazard.

3.

The Tribunal after considering the report filed by the Uttar Pradesh Pollution Control Board (UPPCB) in the proceedings dated 28.08.2025, in order to ascertain the correct position, had directed the Central Pollution Control Board (CPCB) to carry out a fresh inspection of the respondent no.2 unit and to ascertain the status of compliance of the norms by the said unit. The said direction of the Tribunal on 28.08.2025 was as under:

“4.

In order to ascertain the correct position, we require the Central Pollution Control Board (CPCB) to carry out the fresh inspection of respondent no. 2 unit and to ascertain the status of compliance of norms by the unit. The CPCB will also ascertain compliance of norms relating to stack emission by respondent no. 2 unit. Let the report by the CPCB be filed within six weeks.”

4.

In compliance of the above order, CPCB had filed the report dated 19.11.2025 disclosing that inspection of respondent no.2 unit was carried out by the CPCB team and monitoring unit on 14-15/10/2025. In the report of the CPCB had made the following 08 recommendations: -

“2.2. Recommendation:

Based upon the above observations of monitoring team following may be recommended to the unit:

1.

The unit should ensure compliance of PM emission at stack of CFBC boiler as per emission standards.

2.

The unit should ensure that the effluent generated from each section of unit should be treated to meet the prescribed standard under the CTO and recycling and reuse of treated effluent should be done as per consent conditions.

3.

Iron lock gate of channel/drain carrying washing and cleaning effluent generated from DRI Plant, rolling mill, melting shop should be closed and storage tank for the same should be properly lined.

4.

The unit should install dust suppression system to reduce fugitive emission during loading and unloading of coal and iron ore/pallets near the railway platform.

5.

The unit should carryout crushing of slag in enclosed system and slag should be stored in covered area.

6.

Unit should develop minimum 33% green belt within the premises as per EC/consent condition.

7.

Iron ore/pallets and dolomite should be stored in covered area.

8.

Unit should maintain logbook for of hazardous waste (category wise) management in the plant as per authorization including manifest document.”

5.

The Tribunal by order dated 21.11.2025 had directed the UPPCB to submit the report in respect of the compliance of the above recommendations by respondent no.2.

6.

In pursuance of the said order, UPPCB has submitted the report dated 07.02.2026 reflecting the status of compliance of the above recommendations by respondent no.2 as follows:-

“III. COMPLIANCE VERIFICATION BY UPPCB

7.

That in compliance of the aforesaid directions, the inspection of the said unit was conducted on 30.01.2026 to verify the compliance status. That the status of compliance with respect to the recommendations of CPCB is as under:

S. No.Directions of Hon'ble NGTCompliance Status by Project Proponent
1The Unit should ensure compliance of PM emission at stack of CFBC boiler as per emission standards.The unit has installed an Electrostatic Precipitator (ESP) on the CFBC Boiler. Stack monitoring of the boiler was conducted on 30.01.2026. As per the monitoring report, flue gas emission parameters are within prescribed norms. The Stack Monitoring Report is annexed as ANNEXURE R-1.
2The unit should ensure that the effluent generated from each section of the unit is treated to meet the prescribed standards under the CTO, and recycling and reuse of treated effluent is carried out as per consent conditions.The unit has installed an STP of 25 KLD for domestic effluent and an ETP of 100 KLD for effluent generated from the power plant. Samples from the outlets of the STP and ETP were collected and analyzed at the Regional Office Laboratory of U.P. Pollution Control Board, Gorakhpur. As per the analysis report, all parameters are within prescribed norms. The Analysis Report is annexed as ANNEXURE R-2.
3Iron lock gate of the channel/drain carrying washing and cleaning effluent generated from DRI Plant, rolling mill, and melting shop should be closed, and the storage tank should be properly lined.

During inspection, the iron lock gate was found properly closed.

Additionally, the unit has constructed a new, properly lined storage tank for collection and reuse of treated water. Photographs are annexed as ANNEXURE R-3.

4The unit should install a dust suppression system to reduce fugitive emissions during loading and unloading of coal and iron ore/pellets near the railway platform.During inspection, it was found that the unit has constructed an RCC rail unloading platform equipped with water sprinkling systems to control fugitive emissions during loading and unloading of coal and iron ore/pellets. Photographs are annexed as ANNEXURE R-4.
5The unit should carry out crushing of slag in an enclosed system and store slag in a covered area.During inspection, the slag crushing plant was found operating in an enclosed system, and the conveyor belts are covered with M.S. sheets. Photographs are annexed as ANNEXURE R-5.
6The unit should develop a minimum 33% green belt within the premises as per EC/consent conditions.The unit has developed a green belt over approximately 25.0 acres, which constitutes about 33% of the total plot area. Photographs are annexed as ANNEXURE R-6.
7Iron ore/pellets and dolomite should be stored in a covered area.During inspection, iron ore/pellets and dolomite were found stored in covered areas. Photographs are annexed as ANNEXURE R-7.
8The unit should maintain a logbook for hazardous waste (category-wise) management in the plant as per authorization, including manifest documents.The logbook for hazardous waste, including process waste and ETP sludge, was found properly maintained along with requisite manifest documents. A copy of the logbook is annexed as ANNEXURE R-8.
7.

Referring to the above, Learned Counsel for respondent no.2 has submitted that all the 08 recommendations have been complied with and respondent no.2 is operating complying with the environmental norms.

8.

The UPPCB has filed the report dated 12.08.2026 disclosing that earlier, on the site inspection of respondent no.2 unit conducted on 26.12.2024, violation of the provisions of Air Act, 1981 was found. Therefore, complaint under Rule 3 of the Air (Prevention and Control of Pollution) (Manner of Holding Inquiry and Imposition of Penalty) Rules, 2024, (Complaint No. 25/81-6-2026), has been filed under Section 37 of the Air Act, 1981 before the Adjudicating Officer. The Adjudicating Authority has taken cognizance of the said complaint, which is stated to be pending. Hence, the said complaint will be decided on its own merits in accordance with law.

9.

The applicant has filed the rejoinder dated 31.07.2026, enclosing therewith certain news articles stating that the industries of the area are causing pollution by discharging effluent in the drain and causing air pollution also noise pollution. The Counsel for the applicant could not point out that these new items relate to violation by respondent no.2. If the industrial units of that area are not complying with the norms and are causing air, water and noise pollution, requisite action is required to be taken by the UPPCB.

10.

Hence, we direct the UPPCB to form a team which will carry out the inspection of the industries operating in that area and, if any of the industry is found to be operating in violation of the norms, requisite, remedial and punitive action will be taken by the UPPCB. Let this exercise be completed by the UPPCB within a period of three months.

11.

The O.A. is accordingly disposed of.