Tribunals and CommissionsFull Bench(2022) 03 NGT CK 0012

R. K. Gupta vs State of Madhya Pradesh

National Green Tribunal · Decided on 9 March 2022

HON’BLE JUDGES
Adarsh Kumar Goel, CP · Sudhir Agarwal, JM · Prof. A. Senthil Vel, EM · Dr. Vijay Kulkarni, EM
RESULT
Dismissed
CASE NUMBER
Original Application No. 362 Of 2021 (with I.A. No. 55 Of 2022)

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

139 paragraphs · 3,600 words
1.

This complaint has been filed on the basis of media report dated 30. 03.2017 highlighting that huge hazardous waste is still lying at the defunct Union Carbide factory of Bhopal where well known gas tragedy took place in 1984, posing continuous hazard to the environment and public health. The situation is not being remedied inspite of directions for remedial action in various proceedings, including orders of this Tribunal.

2.

Vide order dated 22.12.2021, the Tribunal considered it appropriate to require a factual report in the matter from a Joint Committee of CPCB, State PCB and the District Magistrate, Bhopal.

3.

In pursuance of above, report has been filed on 25.02.2022, after undertaking visit to the site on 21.01.2022, along with local authorities, including representatives of the occupier of M/s. Union Carbide India Ltd. (UCIL) factory - Bhopal Gas Tragedy Relief & Rehabilitation Dept. (BGTRRD), Govt. of MP, Municipal Corporation Bhopal and Capital Project Authority (CPA) officials. The Committee inspected the area where hazardous waste is stored and directed the State PCB to take samples and to monitor ground water quality in nearby localities and also from Solar Evaporation Pond (SEP). It was found that 337MT hazardous waste is still stored. Lime sludge is also stored. Part of it was transported and disposed of in landfill. The remaining is to be disposed of by BGTRRD, Govt. of MP. The Committee found the possibility of contamination of soil and also found need for remediation of the SEP, contamination in terms of pesticide was observed in five wells and also possibility of contamination of soil was indicated. The PCB carried out monitoring of the ground water at 13 locations. The Committee has accordingly suggested speedy disposal of the waste and remediation of contaminated area. It has asked Municipal Corporation not to allow digging of the borewells around the area to avoid exposure to contaminated water. Further recommendation is to dismantle the SEPs and till dismantling the same need to be protected from any unauthorized entry due to possible contaminants. Timebound action plan is required for disposal of the stored waste, dismantling of ponds and remediation of the sites for which guidelines have already been issued by the MoEF&CC in December 2015 under National Program for Rehabilitation of Polluted sites in India. Relevant extracts from the report are reproduced below:

“xxx ……………………………xxx ……………………………..xxx

B. Background information of Union Carbide. Bhopal:

M/s. Union Carbide India Ltd., (UCIL) was manufacturing carbamate type pesticides and the associated intermediate chemicals between 1969 and 1984 at their Bhopal plant. The plant was closed down since December 1984 due to accident of leakage of Methyl Iso-Cyanate (M.I.C.) gas. UCIL was occupier of the premises till 09.07.1998. The total 87.74 acre area of M/s. Union Carbide Ltd. was taken over by M.P. Govt. from M/s. Union Carbide India Ltd. on 09.07.1998. Presently, Bhopal Gas Tragedy Relief and Rehabilitation Department, M.P. Govt. is the occupier of the said premises.

The major issues related to the Union Carbide Factory premises after the MIC gas disaster are

1.

Safe disposal of the waste stored in union carbide premises, Bhopal

2.

Decontamination of contaminated areas and ground water in and around the union carbide premises

3.

Decommissioning of remaining Plant structure.

C. Activities performed by Joint committee during the visit of Union Carbide

1.

The joint committee members visited the premises of Union Carbide, Bhopal and taken the total overview of the site including the remaining structure, plant and machinery and area of Solar Evaporation Pond (SEP). It was observed that the area of Solar Evaporation Pond found unguarded and accessible to nearby residents, some stray animals were also found within the premises.

2.

The joint committee inspected the area within Union Carbide premises where 337MT hazardous waste is stored. The waste was found stored inside the covered shed under lock and key. The waste was put inside jumbo bags, metal trays & drums over a concrete platform.

3.

The joint committee members also visited the probable dump areas within Union Carbide premises identified by NEERI in its study report submitted in 2010. The areas identified in NEERI report were found covered with trees and bushes and was not identifiable physically.

4.

The joint committee also directed MPPCB to perform sampling and monitoring of groundwater in nearby localities around Union Carbide premises and from water collected in Solar Evaporation Pond. The monitoring was later carried out on 24/1/2022.

D. Factual Status of the issues raised in media report appended with Hon'ble NGT directions

S.

No.

Issue raised

Factual Status

Remark

1.

Toxic      waste store  in  Union Carbide premises

l.  As  per  the  available  records the    details    of    waste    stored within     the     Union     Carbide premises   in   covered   shed   on RCC platform is as follows:

The     occupier     of     the premises i.e. Bhopal Gas Tragedy      Relief      and Rehabilitation          Dept. (BGTRRD),  Govt.  of  M.P.

has       already       taken initiatives        for        the disposal    of    remaining

337  MT  waste  stored  in Union  Carbide  premises. Information received from BGTTRD  vides  letter  no. 87     dated     12.01.2022 and           letter           no. 07/73NCtLt2022/291 dated 07.02.2022, which stated  the  action  taken by        BGTRRD        w.r.t disposal     of     337     MT stored                    waste, remediation     of     union carbide    premises    and status     of     supply     of potable    water    to    gas affected  colonies  around the  union  carbide  letter appended  as  Annexure- 2a&b.

Name of waste

Quantity (approx.)

Contaminateds

(Excavated waste)

162MT

Sevin and

Naphthol residues

Together- 92 MT

Semi   processe pesticides

54MT

Reactor residues

29MT

Total

337 MT

2, Disposal of lime sludge in CTSDF, Pithampur

Earlier, in addition to the waste specified in point number l, lime sludge  was  also  stored  within Union Carbide premises.

As per Hon'ble High Court Order dated  10.01.2008,  the  occupier of  the  Union  Carbide  premises

i.e.  Bhopal  Gas  Tragedy,  Relief and  Rehabilitation  Dept.,  Govt. of M.P. (BGTRRD) called tenders for   the   transportation   of   the waste      to      pithampur      and Ankleshwar respectively.

BGTRRD   informed   to   MPPCB Vide    letter    No.    1698    dated 28.06.2008 (along with form 9 - Hazardous Waste Manifest) that total  33.31  tons  of  lime  sludge were     transported     in     three Trucks/     Container     of     N{/s Kataria  Transport  Co.,  Gujarat on     27.06.2008     to     CTSDF,

Pithampur  (Dhar)  and  the  same was treated and disposed off in a     Secured     Land     Fill     on 30.06.2008 .

Copy of Hon'ble HC order dated 10.01.2008  &.  Intimation  letter from   MPPCB,   RO   (Dhar)   vide letter                                        no.

3260/ROA4PPCB/HW2008

dated 04.10.2008 is enclosed as Annexure- 3.

3.

W.r.t  Hon'ble  SC  SLP  (Civil) No.    -    9874/2012    (Sh.    Alok Pratap  Singh  Vs  Union  of  India &  Ors.)  filed  on  22.03.2012  for the disposal of the waste stored in  Union  Carbide  Bhopal,  in  a trial  run  at  CTSDF,  Pithampur between 13- 18/082015 total l0 MT      of      stored      HW      was successfully    incinerated.    The case    was    disposed    off    on l8/7/2018. The copy of the trial run    report    is    attached    as Annexure.4.

4.

Process  for  the  disposal  of remaining 337 MT waste stored in   Union   Carbide   premises   is being carried out by the occupier

BGTRRD, Govt. of M.P.

1.

Contamination of  soil  in  and around       the Union  Carbide premises including three       Solar Evaporation Ponds     (SEP) and groundwater contamination

l.  In  the  Year  2O10,  National Environmental          Engineering Research      Institute      (NEERI) Nagpur    along    with    National Geophysical   Research   Institute (NGRI) Hyderabad submitted its study  report  to  BGTRR  entitled Assessment and Remediation of Hazardous Waste Contaminated Areas in and around M/s Union Carbide    India    Ltd.,    Bhopal,'. Highlights      of      the      report pertaining  to  contaminated  area and  groundwater  contamination are as follows:

Contaminated area: The report reveals   that   approximately   9 sites    within    Union    Carbide premises  indicated  possibilities of  dumps.  Out  of  this,  3  sites indicated        possibilities        of contamination.  contamination  is about    16    hectares    with    an average  depth  of  contamination

2    m.    The    total    volume    of contaminated      soil      to      be remediated  from  Union  Carbide premises  was  estimated  about 3, 20,000 m3.

Solar  Evaporation  Pond  located outside  the  premises  cover  an area of  around 14 hectare. This area      also      needs      to      be remediated  (total  volume  to  be remediated      was      estimated about 2, 80,000 m3).

The copy of Executive Summary of  the NEERI Report is enclosed as Annexure -5.

Ground water contamination:

The   report  reveals   that   NGRI, Hyderabad    has    collected    05

borewell  samples  within  Union

Carbide     premises     and     30 samples     around     the     union carbide  premises  (up  to  5  km from  Union   Carbide   site).  The results   showed   that   "Ground water     in     general     is     not contaminated due  to seepage of contaminants        from        UCIL contamination     in     terms     of pesticides   was   observed   in   5 wells     near     union     carbide premises.     The     sources     of contamination   of   these   wells attributed to surface run off from the dumps".

The   study   also   indicated   the possibility   of   contamination   of soil and groundwater with BHC, Aldicarb,   Carbaryl,   a-naphthol and Mercury.

2.

M.P.  Pollution  Control  Board (MPPCB)     also     carried     out monitoring  of  ground  water  of about 13 localities around Union Carbide, Bhopal from year 1996 to   2012.   Contamination   W.r.t metals     and     pesticides     like alpha-BHC,     Lindane,     Aldrin, Dialdrin,          Endrin,          DDT, Endosulphan,                      BHC, Methoxychlor,  methyl  parathion, Melathion,   Phorate,   Heptachlor were   not   evident   since   year 2006.

Later     on     Bhopal     Municipal Corporation,   as   per   directions dated   07.06.2012   of   Hon'ble Supreme      Court      Monitoring Committee    started    supplying potable  water  in  the  localities around     the     Union     Carbide premises   and   also   closed   the bore wells.

Summary       of       groundwater quality monitoring carried out by MPPCB      is      appended      as

Annexure- 6.

l. As per the directions of Hon'ble Supreme Court of India      on      Wp      No. 657/1995         [Research Foundation   for   Science Vs Union of India & Ors.l 42 colonies in the vicinity of        Union        Carbide premises   supplied   with potable  water  by  Bhopal Municipal Corporation.

Report    of    tap    water samples    analysed    by MPPCB in  the year 2014 is enclosed as Annexure- 7.

Minutes   of   Meeting   of Supreme                  Court Monitoring       Committee dated   07.06.2012   w.r.t supply  of  potable  water to localities around Union Carbide,     Bhopal     and Commissioner,      Bhopal Division w.r.t stoppage of water  supply  from  tube wells  of  that  area  and supply  of  potable  water to  gas  affected  colonies located around the Union Carbide  are  enclosed  as Annexure-8.

As per the instructions of Joint Committee, MPPCB has collected groundwater samples through bore wells available in the vicinity of Union Carbide premises and from Solar Evaporation Pond (SEP) on 24.01.2022 and analysed at Central Laboratory, MPPCB Bhopal. The details of sampling locations are tabulated in Table- 1 and Google map of the sampling locations is given at Figure-1.

Table 1: Details of Sampling Locations (24.01.2022)

S. No.

Sampling Location

Co-ordinates

1.

Bore Well at Atal Ayub Nagar

23.28095

77.41219

2.

Bore  Well   at Kainchi Chhola

23.27790

77.41624

3.

Bore    Well    at  Garib Nagar

23.28561

77.41479

4.

Bore Well at Blue Moon colony

23.28436

77.40834

5.

Bore Well at New Arif Nagar

23.28199

77.40618

6.

Bore Well at Shiv Nagar

23.28828

77.42519

7.

Open well inside Union Carbide premises

23.27963

77.41004

8.

Surface water of Solar Evaporation Pond

23.28618

77.41192

Results reveal that some of the Physico-chemical parameters like Color, Chloride, Total Hardness, Calcium and Magnesium ions and Heavy Metals like Manganese and Nickel in bore well water of some locations exceeding the acceptable limits of IS 10500[2012]. However, Pesticides are not detected in any of the collected samples.

The copy of the analysis results are is enclosed at Annexure- 9.

The relevant photographs of the site visit taken by the Joint Committee are enclosed at Annexure- 10.

Action taken and proposed by the Joint Committee:

1.

Bhopal Gas Tragedy Relief and Rehabilitation Department, Government of M.P being occupier of Union Carbide, Bhopal may be directed to speed up the process of disposal of waste on priority and remediation of contaminated area in and around the premises of Union Carbide, Bhopal. Letter No. 419/CL/MPPCB/Bhopal dated 03/02/2022 issued to BGTRRD from Dist. Magistrate, Bhopal in this regard.

The copy of the issued letter is enclosed as Annexure- 11.

2.

Letter No. 418/CUMPPCB/Bhopal dated 03/02/2022 issued to Bhopal Municipal Corporation from Dist. Magistrate, Bhopal to not allow any digging of bore wells around the Union Carbide premises to protect the exposure of consumers to any contamination of water and also immediate closure of hand pumps/ bore wells (if any) located in nearby localities around the Union Carbide premises till restoration of site.

The copy of the issued letter is enclosed at Annexure- 12.

3.

Area of Union Carbide premises is covered and protected, however the area of Solar Evaporation Pond is unprotected and accessible to nearby residents. Rain water collected in Solar Evaporation Ponds. Solar Evaporation Pond should be dismantled. Till then solar pond area shall be guarded & protected to restrict the unauthorized entry and for human protection from possible contaminants. Action to be taken by the occupier of the Union Carbide premises i.e. Bhopal Gas Tragedy Relief and Rehabilitation Department, Government of M.P.

4.

A time-bound Action Plan for the disposal of stored waste, dismantling of solar ponds' area and remediation of the contaminated sites shall be prepared by the occupier of the Union Carbide premises i.e. Bhopal Gas Tragedy Relief and Rehabilitation Department, Government of M.P. and the same should be submitted before Hon’ble NGT for the timely execution of the work without any delay. [Disposal of waste and remediation of site is being performed by BGTRRD is as per directions of Hon Supreme court].

5.

MoEF&CC has already issued a guidance document for assessment and remediation of contaminated sites in India in Dec., 2015 under National Program for Rehabilitation of Polluted Sites in India, available at that may be referred (https://cpcb.nic. inr'uploads/bwmd/MoEFCC_guidelines_contaminatedsites.pdf)”

4.

We have heard learned Counsel for the State PCB who simply submitted that the situation is serious which needs to be remedied by the concerned authorities. We however note that the State PCB has failed to perform its obligation as a statutory regulator under the Water and Air Acts and also under the Hazardous Waste Management Rules, 2016 framed under the Environment (Protection) Act, 1986. There is also failure of the BGTRRD, Govt. of MP in clearing the waste and remediating the site even though the plant was closed in the year 1984 due to Bhopal Gas disaster and the area was taken over by MP Government on 9. 07.1998 – 24 years back. The resultant effect is continued contamination to the prejudice of environment and public health. Necessary safeguards are not being adopted. The report refers to orders of Madhya Pradesh High Court on the issue of taking steps for scientific removal of the hazardous waste. There is also a report on trial incineration of such waste in the year 2015 by CPCB and also report of NEERI recommending fencing of the premises, sealing of the borewells, disposal of the waste, de-contamination and de-commissioning of plant, remediation of soil and ground water.

5.

The above undisputed facts show serious unsatisfactory state of affairs and apathy and failure of the concerned authorities to perform their responsibility under public trust doctrine which calls for prompt action by BGTRRD, Govt. of MP, which further needs to be monitored by the Chief Secretary, M.P. personally in view of long time failure to take such requisite steps, to the detriment of environment and public health. This should be in a timebound manner, not beyond six months. As already noted, trial has already been held in the year 2015 and thus there can possibly be no reason for any further delay. Oversight Committee in the MoEF&CC and in the Ministry of Chemical and Fertilizer may grant necessary sanctions in terms of directions of the Hon’ble Supreme Court on the subject within one month.

6.

We note that the matter has been earlier dealt with by the Hon’ble Supreme Court in SLP (C) No. 9874/2012, Union of India v. Alok Pratap Singh, including orders dated 04.04.2012, 11.05.2012, 18.02.2013 and 17. 04.2014 and also in W.P. No. 657/1995, Research Foundation for Science Technology and Natural Resource Policy v. Union of India.

7.

Vide order dated 30.08.2018 in W.P. No. 657/1995, Research Foundation for Science Technology and Natural Resource Policy v. Union of India, the Hon’ble Supreme Court directed preparation of an action plan on the subject.

8.

On transfer of proceedings in WP No. 657/1995, Research Foundation (2005) 10 SCC 510 and (2012) 7 SCC 769, supra, on the Management Rules, 2016, the matter has been dealt with by this Tribunal in OA No. 804/2017, Rajiv Narayan & Anr. vs. Union of India & Ors. The Tribunal constituted a Monitoring Committee to compile relevant information and in the light of orders of the Hon’ble Supreme Court dated 18.07.2018 transferring proceedings before this Tribunal.

The  Tribunal  issued  further  directions,  considering  the  report  of  the Monitoring Committee, fixing timelines for disposal of hazardous waste in scientific manner. The Tribunal reviewed the compliance status on 07.07.2020 and finally on 29.01.2021 and issued following final directions:

“xxx ……………………………….xxx………………………………….xxx

14.

We have considered the report of the CPCB and appreciate the efforts in compiling all the relevant information on this important subject and direct that observations/suggestions of the CPCB with reference to the compliance by the State PCBs/PCCs may now be duly complied expeditiously, which may be further overseen by the CPCB. The CPCB may assess compensation if the State PCBs/PCCs neglect compliance, following due process, which may be recovered and utilized for restoration of the environment, by preparing an action plan to be approved by the Chairman, CPCB. Even though the report of the CPCB is exhaustive for all the States, we take on record the report furnished by the Oversight Committee for State of UP filed on 10.09.2020. As directed earlier, the MoEF&CC may follow up compliance of steps to be taken by the Central Ministries, for which purpose the CPCB may coordinate with the MoEF&CC. CPCB may impose compensation, if necessary, on the States/UTs which fail to set up TSDF or make other alternative arrangement for management of hazardous waste as per Rules. CPCB may also notify the contaminated sites, having potential for damage to the environment, in public domain, alongwith damage caused and the studies undertaken. CPCB may also ensure that hazardous waste generators/recycles/operators of TSDF follow safety protocols, undertake periodical audits, have onsite and offsite emergency plans to avert accidents and fire and other environmental damage.”

9.

The timelines in the order of this Tribunal dated 28.06.2019 are as follows:

“…………  iv.  126 sites which  have  already  been  identified  as contaminated may be cleared of the hazardous waste within six months so that remediation process may start. The remediation work may start at the 55 sites for which DPRs have been completed within the timelines specified in the DPRs. For the remaining 71 sites, DPRs may be completed expeditiously but not later than one year and thereafter remediation may be done as per the timelines in the DPRs.

v. Failure to remove the waste from the 126 identified sites will result in environmental compensation to be paid at the rate of Rs. 10 lakhs per site from 01.04.2020 by the concerned SPCBs/PCCs to the CPCB. Same rate will apply in respect of such of the 195 sites as are identified as contaminated with effect from 01.01.2021.

vi. With regard to 195 probable contaminated sites, the assessment may be completed within six months and thereafter the waste may be removed within next six months form sites cleared by the CPCB to be contaminated.

vii. The clearance of site by way of disposal or transfer should be strictly as per the HOWM Rules, to be monitored by the CPCB. The cost of removal of waste may be first paid out of the environment funds/consent funds available with the State PCBs/PCCs and thereafter recovered from the persons concerned……………….”

10.

It appears that there is failure to comply with the above direction which may be verified by the CPCB and if violations is found, CPCB may take further action in terms of order of this Tribunal, quoted above.

The application will accordingly stand disposed of.

A copy of this order be forwarded to the Secretary, MoEF&CC, Secretary, Ministry of Chemical and Fertilizer, Govt. of India, CPCB and Chief Secretary, M.P. by e-mail for compliance.

IA No. 55/2022

11.

This application has been filed by Bhopal Group for Information and Action praying for closing these proceedings as the matter is being dealt with by the Madhya Pradesh High Court in W.P.(C) No. 2802/2004, Alok Pratap Singh v. Union of India & Ors. and also by the Hon’ble Supreme Court in W.P.(C) 657/1995, Research Foundation for Science Technology and Natural Resource Policy v. Union of India. We have heard learned Counsel for the applicant in the IA and asked for any suggestion in the matter beyond suggesting that the Tribunal should not deal with the issue. No suggestion has come forth. Thus, we are unable to find any bona fides in the prayer and are at loss to understand how the applicant is helping the cause by such prayer. There is no threshold bar to the jurisdiction of this Tribunal in the circumstances nor the orders proposed are in any manner in conflict with orders of the High Court or the Hon’ble Supreme Court. Rather, the Tribunal is enforcing the said orders, finding that the authorities are failing to perform their obligation. Needless to say that the orders are subject to any order of the Hon’ble Supreme Court and not in conflict with the same. IA is accordingly dismissed.

12.

Since the order has been passed based on the report of the joint Committee of CPCB, State PCB and District Magistrate, which has also considered the viewpoint of the BGTRRD, Govt. of MP, we have not considered it necessary to issue a separate notice to the BGTRRD, Govt. of MP. However, if it is aggrieved by order of this Tribunal, it is at liberty to move this Tribunal with such grievance.