Tribunals and CommissionsFull Bench(2022) 10 NGT CK 0031

In re : News item published in The Times of India dated 28.04.2022 titled �Massive fire breaks out at Meerut Chemical factory; no casualties reported Vs

National Green Tribunal · Decided on 18 October 2022

HON’BLE JUDGES
Adarsh Kumar Goel, CP · Sudhir Agarwal, JM · Prof. A. Senthil Vel, EM · Dr. Afroz Ahmad, EM
RESULT
Disposed Of
CASE NUMBER
Original Application No. 304 Of 2022

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

149 paragraphs · 2,562 words
1.

Proceedings in this application have been initiated in the light of captioned media report to the effect that a massive fire broke out in a solvent factory in Mawana, District Meerut, U.P., due to blast which resulted in air pollution.

2.

Vide order dated 28.04.2022, the Tribunal sought a factual report in the matter from a joint Committee of CPCB, State PCB, District Magistrate, Meerut and Director, Industrial Safety, U.P.

3.

The matter was last considered on 18.07.2022 in the light of report of the joint Committee filed on 12.07.2022 identifying the unit as M/s AADI Solvent Recyclers Pvt. Ltd., Khasra No. 506/1,2,3,4,505, Nangli Isha, Mawana, Meerut – 250002 and finding non compliances as follows:-

“36. Specific observations:

1.

The unit was inspected on 27th May, 2022 in compliance to NGT order in OA no. 304/2022 by Joint team comprising of officials from CPCB, UPPCB, Industrial safety, Fire department and District administration.

2.

At the time of inspection unit was found operational.

3.

The unit is engaged in recovery of solvent from mixed solvent from mixed solvent by simple distillation method.

4.

Unit is having valid consent from UPPCB under Air and Water Act and the same was valid upto 3 1/07/2025.

5.

The unit have valid authorization under Hazardous & Other Wastes (Management & Transboundary Movement) Rules, 2016 upto 21/04/2025.

6.

The unit has four raw material storage tanks for storing mixed chemicals having capacity of 50 KL(2 Nos.) and 30 KL (2Nos).

7.

The unit produces Thinner, Acetone, Toluene, IPA, Ethyl Acetate as finished product.

8.

The unit has 12 Tank of total 235 KL for storage of finished goods, out of 12 tanks five were of 12 KL, One of 15 KL, two of 20 KL, one of 25 KL, two of 30 KL and one of 35 KL.

9.

No hazardous waste display board was found at entry gate of the Unit.

10.

Unit has installed one borewell for meeting freshwater requirement but CGWA/UPGWD permission was not available with the unit.

11.

No flow meter was installed at borewell and no logbook for keeping record of freshwater consumption was found.

12.

The unit has one wood fired boiler of two tonne capacity with cyclone dust collector as air pollution control device.

13.

No data of fuel consumption (wood consumption in boiler) was available with the unit.

14.

The unit has ETP of 10 KL capacity. ETP comprises of O&G trap—Primary settling tank—Bio reactors(2Nos) —Secondary clarifier—treated water tank—Sludge drying beds—The ETP was found operational at the time of inspection.

15.

As per unit the ETP treated water has been recycled within the .Unit's premises but no data of recycled water was available with the unit. Also, no such recycling/ reuse of treated effluent was observed at the time of visit by the joint team.

16.

No flow meters were found installed at the ETP inlet & outlet of ETP. Also no logbooks were found maintained at ETP regarding effluent treatment & chemical consumption.

17.

Colored effluent & sludge was observed to be scattered in and around ETP area.

18.

Unit is having an agreement dated 24.5.2022 with M/s UPWMP (CHW-TSDF) Site, Kanpur Dehat [Membership No UPWMP-KNP-HzW-CHW-TSDF-1993].

19.

The unit has Authorization of hazardous and other waster valid till 21/04/20225 with a quantity of total 100 KL/annum of waste but till now no data of waste or sludge disposal was available with the unit.

20.

The unit was found complying w.r.t. the prescribed norms as per the consent granted by UPPCB. [pH 7.8 against 6.5 -8.5; Oil & grease 4.6 mg/1 against 10 mg/1; suspended solids — 34.8 mg/1 against 100 mg/1; BOD 18.1 mg/1 against 30 mg/I and COD — 172 mg/1 against 250 mg/1]

21.

UPPCB officials carried out stack monitoring and the SPM — 545.45mg/Nm3 was found against the prescribed norm of 800mg/Nm3.

22.

It was observed that highly flammable raw material is not stored properly as it was kept outside without shade even during sunny summer day.

23.

Loading and Unloading of raw material was observed to be improper as very highly flammable raw material stored in container were rolled over on concrete surface.

As per Report sent by Assistant Director, Factory dated 07.06.2022, following were the observations (Annexure-I):

1.

At the time of fire incident dated 27.04.2022 at 12:40 PM, raw material i.e. Spent Heptane + Toluene (Mix Solvent) from tanker were unloading in the drum and kept outside shade/ raw material storage room.

2.

The unit had several 200 liter drum of very highly flammable raw material kept outside shade in sunny summer day.

3.

The leakage from tanker spread over warm road and get fire which spread from tanker, godown and office.

4.

On site emergency plan (Annexure-II) was provided by the unit but no emergency plan mock-drill were shown.

As per report of Fire Department, Meerut dated 27.05.2022 (Annexure-III)

1.

The unit has 2 lakh liter capacity underground water tank which was empty at the time of inspection

2.

Near underground water tank two electrical pump of capacity — 2280 LMPO, one diesel pump of capacity — 2280 and two jockey pump of capacity 180 LMP were not present.

3.

Yard hydrant was available but not functional.

4.

The unit does not have terrace tank of capacity 20000 liters.

5.

The unit doesn't have Automatic detection and fire alarm and Manually operated fire alarm and automatic sprinkler system

6.

The unit's 1000 liter foam compound (ARAFFF) for fire safety was burnt in fire which was supposed to be kept in other room.

7.

The medium velocity water spray for cooling radiation hazards and foam porer on tanks were not available in the unit premises.

8.

Long range foam monitor was not installed in the unit premises.

Specific recommendations/suggestions:

1.

Unit shall install flowmeters at all water abstraction points.

2.

Unit shall install flowmeters at ETP inlet & outlet.

3.

Unit shall maintain proper record for fresh water consumption, chemical consumption at ETP, effluent generation & discharge, fuel consumption in boiler.

4.

Unit shall maintain proper logbook for raw material consumption & final product.

5.

Unit shall make separate arrangement for storage of Hazardous Waste in ETP area in compliance to HW Rules,2016.

6.

Unit shall obtain permission from CGWA/UPGWD for ground water abstraction.

7.

Unit shall ensure proper handling & storage of Hazardous chemicals in accordance with Rules.

8.

Unit shall ensure and adopt all the necessary fire safety and management measures to prevent and control any kind of fire incident in future.”

4.

The Tribunal accordingly directed remedial measures and also sought further action taken report in the matter. The operative part of the order is as follows:-

“3. From the above, there is lack of adequate safety precautions in operating hazardous activities in violations of statutory Rules - Manufacture, Storage and Import of Hazardous Chemical Rules, 1989. No emergency plan mock drill was conducted, there is no display board, no proper storing of inflammable material, wood fired Boiler is itself safety hazard at the concerned location. This calls for action against violation of statutory Rules under the EP Act. Let the unit take remedial action forthwith which may be overseen by the State PCB and the Director Industrial Safety. In default, coercive measures, including closure may be taken, following due process. Further, there is need to ascertain by the Director Industrial Safety, UP whether siting of the unit is appropriate and if the siting is found to be inappropriate, the same needs to be relocated at appropriate location. An action taken report may be filed by the State PCB and Director Industrial Safety within one month by email. The State PCB will be the nodal agency for compliance. The PP may also be put to notice of these proceedings by the State PCB.”

5.

In view of above, further report has been filed by the State PCB mentioning the remedial action taken as follows:-

“

S.No

Shortcoming  as  mentioned in order dated 18/07/2022

Compliance Status at site

1

No hazardous waste display board  was  found  at  entry gate of the Unit.

A display board at the Entry gate of the unit was found regarding Hazardous waste. Photograph ofsaid display board is annexed as annexure-l.

2

Unit    has    installed    one borewell for  meeting freshwater requirement but CGWA/UPGWD     permission was  no  available  with  the unit.

Unit has  installed flow meter  at two  water  abstraction points.  OIHP  near  Boiler  and  I.5HP  in  the  plant  area. Photographs  of  installed  flow  meter  are  annexed  as annexure-2. The reading flow meter were 15.29m3  and 84.77m3  log book of the water meters are attached. Unit has applied for registration regarding water abstraction before UPGWD, Meerut.

3

No flow meter was installed at borewell and no logbook for     keeping     record     of freshwater       consumption was found.

Unit  has  installed  flow  meter  at  two  water  abstraction points.  01HP  near  Boiler  and  1.5HP  in  the  plant  area. Photographs  of  installed  flow  meter  arc  annexed  as annexure-2. The reading flow meter were 15.29m3  and 84.77m3 log book of the water meters are attached.

4

No data of fuel consumption (wood      consumption      in boiler)  was  available  with the unit.

The log book of fuel consumption (wood consumption in boiler) is attached as annexure-3.

5

As per unit the ETP treated water   has   been   recycled within  the  Unit's  premises but no data  of        recycled water was available with the unit. Also, no such recycling/ reuse of treated effluent was observed at the time of visit by the joint team.

No  water  meter  was  found  at  the  recycle  point  after ETP.

6

No flow meters were found installed at the ETP inlet & outlet   of   ETP.   Also   no logbooks       were       found maintained        at        ETP regarding                effluent treatment     &     chemical consumption.

Flow meters at inlet & outlet of ETP are installed. The Photographs  of  installed  flow  meters  are  annexed  as annexure-4.  The  logbooks  found  maintained  regarding Chemical consumption regarding ETP. The records found at the time of inspection is attached.

7

Colored  effluent  &  sludge was observed to be scattered in and around ETP area.

A Photograph of ETP is annexed as annexure- 5. No colored effluent  & no sludge was observed in  scattered in around ETP area.

8

It was observed that highly flammable  raw  material  is not  stored  properly  as  it was  kept  outside  without shadeeven    during    sunny summer day.

The highly flammable raw material  used  by  the  unit were  found  stored  in  covered  shed.  A  Photograph  is annexed as annexure-6

9

Loading  and  Unloading  of raw material was observed to   be   improper   as   very highly     flammable     raw material        stored        in container  were  rolled  over on concrete surface.

No  rolling  over  on  concrete  surface  of   highly  raw material    was    observed.    Regarding    Loading    and Unloading of raw material unit is using Man rolled trolly. A photograph is annexed as annexure-7

As per Report sent by Assistant Director of Factories dated 07.06.2022

10

At the time of fire incident dated 27.04.2022 at 12:40 PM, raw material i.e. Spent Heptane + Toluene (Mix Solvent) from tanker were unloading inthe  drum  and kept outside shade/ raw material storage room.

No raw materials were found kept outside the covered shed.

11

The  unit  had  several  200 liter  drum  of  very  highly flammable    raw    material kept outside shade in sunny summer day.

The 200 liters drum of raw materials, highly flammable were found kept in the covered shed.

12

On   site   emergency   plan (Annexure--111)             was provided by the unit but no emergency  plan  mock-drill were shown.

Mock-drill was conducted on dated 10-08-2022.

As per report of Fire Department, Meerut dated 27.05.2022

13

The  unit  has 2  lakh liter capacity undergroundwater tank  which  was  empty  at the time of inspection

The  Underground  water  tank  of  capacity  2  lakh  litre was found filled with water.

14

Near    underground    water tank two electrical pump of capacity — 2280 LMPO, one diesel  pump  of  capacity  — 2280 and two jockey

pump  of  capacity  180  LMP were not present.

The said electrical pump of capacity - 2280 LPM, one diesel pump of capacity — 2280LPM and one jockey pump  of  capacity  180  LPM  were  found  in  operating stage.

15

Yardhydrant was available but not functional.

Yard hydrant system found in operating stage.

16

The    unit    doesn't  have Automatic    detection    and fire   alarm   and   Manually operated fire alarmand automatic sprinkler system

The unit is having Automatic detection and fire alarm and   Manually   operated   fire   alarm   and   automatic sprinkler system. The said fire alarm system found in operating stage.

17

The  unit's  1000 liter foam compound (ARAFFF) for fire safety   was   burnt   in   fire which  was  supposed  to  be kept in other room.

The 1000 liter foam compound (ARAFFF) was found stored in the premises.

18

The  medium velocity water

spray for  cooling radiation hazards and foam porer on tanks were not available in the unit premises.

The medium velocity water spray for cooling radiation hazards and foam porer on tanks is available.

11

19

Long  range  foam  monitor was to installed in the unit premises.

Long    range   foam  monitor  branch  have  been established.

Specific recommendations/suggestions

20

Unit          shall          install flowmeters   at   all   water abstraction points.

Unit has installed flow meter at two water abstraction points. 01HP near Boiler and 1.5HP in the plant area. Photographs  of  installed  flow  meter  are  annexed  as annexure-2. The reading flow meter were I 5.29m3  and 84.77m3  log book of the water meters are attached. As mention above in point no- 3

21

Unit          shall          install flowmeters  at  ETP  inlet  & outlet.

Flow meters at inlet & outlet of ETP are installed. The Photographs  of  installed  flow meters  are  annexed  as annexure-4. As mention above in point no-6

22

Unit   shallmaintain  proper record     for    fresh    water consumption,         chemical consumption at ETP, effluent generation    &    discharge, fuel consumption in boiler.

Unit     has maintained  record   for    fresh  water consumption,    chemical    consumption    ETP,    effluent generation  discharge,  Fuel  consumption  boiler.  The  log books for above regards has been maintained as mention above point no-2,3&4.

23

Unit    shall maintain proper logbook for  raw      material consumption       &       final product.

The   logbook   of   raw  material   consumption   &   final product is attached as annexure No-08.

24

Unit     shall  make separate arrangement for  storage  of Hazardous   Waste   in   ETP area  in  compliance  to  HW Rules, 2016.

Separate arrangement for storage of Hazardous Waste

i.e. ETP sludge has been maid by the unit which is a

covered room, pucca floor. The area of the room of the about 08Feet x 09Feet. A photograph of covered seprate room annexed as annexure-09.

25

Unit shall   obtain permission                    from CGWA/UPGWD  for     ground water abstraction.

An application have been forwarded by the unit regarding obtaing permission from  UPGWD    for ground water abstraction of two water abstraction points separately. The copy of said application is annexed as annexure-10

26

Unit     shall  ensure  proper handling     &     storage  of Hazardous  chemicals   in accordance with Rules.

A report of Assistant Director of factories U.P. Meerut Zone Meerut dated 23-08-2022, 27-08-2022 & 30-08- 2022 is being annexed as annexure-11

27

Unit Shall ensure and adopt all the necessary fire safety and  management  measures to  prevent  and  control  any kind   of   fire   incident   in future."

A report of Chief fire officer Meerut dated 30-08-2022 is being annexed as annexure-12.

Regarding fire   safety, NOC   from    fire  service department vide letter dated 05-09-2022 annexed as annexure-13.

In view of above, no further order appears to be necessary.

The application is disposed of.