Tribunals and CommissionsFull Bench(2023) 04 NGT CK 0034

Gopal Chandra Vanwassi vs SDM, Ramnagar & Ors

National Green Tribunal · Decided on 28 April 2023

HON’BLE JUDGES
Adarsh Kumar Goel, CP · Sudhir Agarwal, JM · Dr. A. Senthil Vel, EM
RESULT
Disposed Of
CASE NUMBER
I. A. No. 427 Of 2023 In Original Application No. 396 Of 2022

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

206 paragraphs · 2,461 words
1.

Proceedings in this matter were initiated on the basis of a letter of the applicant stating that 16 stone crushers were operating in District Nainital, Uttarakhand against environmental norms.

Procedural History

2.

Vide order dated 27.05.2022, the Tribunal directed verification of the allegation by a joint Committee of State PCB and District Magistrate, Nainital and to furnish a report to this Tribunal. Accordingly, a report was filed on 03.10.2022 by the State PCB to the effect that out of sixteen units in question, seven were non-compliant, eight had not yet established though they have obtained NOC from the State and one had not even obtained NOC. Non-compliant units were given show cause notice for closure and levy of compensation. Eight stone crushers who had obtained NOC were directed not to establish the same without Consent to Establish.

3.

Considering the said report, vide order dated 18.10.2022, the Tribunal directed impleading the 16 stone crushers as party and issued notice to them to file their response, if any. State PCB was also directed to file further response. State PCB filed reply dated 07.02.2022 to the effect that seven non-compliant units had since rectified their shortcomings and were now compliant. For past violations, compensation was to be proposed.

4.

The matter was further considered on 08.02.2023. Since the State PCB had failed to give all the information in terms of order dated 18.10.2022, further affidavit was directed to be filed. Further affidavit was filed by the State PCB on 25.03.2023 giving the requisite information and further stating that proceedings were also pending before the Uttarakhand High Court in W.P. (PIL) No. 168/2019. State PCB is taking necessary regulatory measures. Status of stone crushers was placed on the website of Uttarakhand PCB, as per orders of this Tribunal.

5.

The matter was last considered on 28.03.2023. The Tribunal noted that while seven units were declared compliant, material in support of the compliance had not been filed. Accordingly, the Tribunal constituted another Committee to verify facts.

Today’s proceedings

6.

In above background, matter has been put up today in view of I.A. no. 427/2023 filed by six out of seven stone crushers, declared by the PCB to be now compliant, alongwith their reply.

7.

We have heard learned Counsel for the parties and perused the record.

8.

Learned Counsel for the units in the IA and State PCB submit that since the said units are compliant, no re-verification is required in absence of any material to the contrary. Non-compliance earlier alleged, as per State PCB notice, was not providing interlocking, adequate height of DG sets and plantations. Violations with regard to interlocking and DG sets heights were rectified immediately. With regard to green belt, the defaulting unit in question had since provided the remaining layers. Thus, all the units were now compliant. The compliance status has been filed as Annexures A1 to A6 to the IA covering M/s Ashok Stone Crusher, M/s Pannu Stone Crusher, M/s Mahabali Stone Crusher, M/s New Ramnagar Stone Crusher, M/s AV Natural Pvt. Ltd. and M/s Guru Har Rai as follows:-

“Annexure A1

NAME OF THE UNIT-M/S ASHOK STONE CRUSHER-

SL.

No.

OBJECTION       IN       THE INSPECTION REPORT

OBJECTION      IN      THE NOTICE                 DATED 27.08.2022

STATUS  OF  COMPLIANCE  AS  ON 14.03.2023

1.

No green belt in three layers as  per  the  policy  is  found around the plant, it is in one layer.

The unit has not developed a green belt as per the policy of the State

Three   Layers   on   the   West  and South   Side.  The  East  Side  has cottages for workers and the east size has an access ramp and hence on    these    two    sides    due    to obstruction development of a green belt is not possible.

2.

Lack of interlocking of the manufacturing     and     the emission control system

Lack of interlocking of the manufacturing and the emission control system

Interlocking system has now been installed and made active.

3.

no such  observation  in  the report

The unit has not obtained ground  water  abstraction permission

The  inspection  report  itself  states that   the   unit   does   not   have   a ground  water  point,  and  instead uses a metered connection from the state     Water     Resources     and Irrigation   department,   hence   no question   of   ground   water   use comes into picture.

4.

no such observation in

the report

The stack height of the DG Set is less than the norms

The unit does not have DG Set and therefore the question of a stack is irrelevant. The inspection also finds that no DG is installed in the unit.

5.

no such  observation  in  the report

The   raw   material   was stacked in excess height

No    such    observation    in    the inspection report.

Annexure A2

NAME OF THE UNIT-M/S NEW RAMNAGAR STONE CRUSHER

SL.

No.

OBJECTION       IN       THE INSPECTION REPORT

OBJECTION      IN      THE NOTICE                 DATED 27.08.2022

STATUS  OF  COMPLIANCE  AS  ON 14.03.2023

1.

Only one layer of green belt is found around the Plant

The green belt as per the policy has not been developed.

The green belt as per the policy has been developed and the trees have been planted in three layers. While two layers are tall trees with good foliage, one layer is of new trees.

2.

The    raw    material    was stacked  higher  than  wall, however  penalty  of  Rs.  2 Lakhs  has  been  imposed upon the unit and the same has been recovered

Stocking of minor mineral was higher than the wind breaking wall.

The  fine  for  the  same  has  been made and the unit is not stocking material  higher  than  the  breaking wall height.

3.

Lack  of  interlocking  of  the manufacturing     and     the emission control system

Lack of interlocking of the manufacturing   and   the emission control system

The  interlocking  system  has  been installed and the entire system and conveyor belts are covered with tin sheets.

4.

Stack height of the DG Set is less than  the prescribed norms

No such observation

Stack  height  of  20  feet  has  been provided by the unit now.

5.

No such observation

The  unit  is  using  ground water without permission of    the    Ground    water authority

The   unit   does   not   use   ground water,    the    unit    as    a    water connection      from      the      Water Resources         and         Irrigation Department

6.

No such observation

The unit has not provided wind breaking wall as per the policy of the State

The unit has a wind breaking wall as per the policy and the height is at present 10 feet.

Annexure A3

NAME OF THE UNIT-M/S PANNU STONE CRUSHER

SL.

No.

OBJECTION       IN       THE INSPECTION REPORT

OBJECTION      IN      THE NOTICE                 DATED 27.08.2022

STATUS  OF  COMPLIANCE  AS  ON 14.03.2023

1.

Though tamper proof water meter    is   found   on    the tubewell  permission  of  the Ground    Water    Authority and   Log   Book   was   not available

permission of the Ground Water Authority and Log Book was not available

Consent     from     Ground     water authority       was       taken       on 31.07.2022   and   appropriate   log book is being maintained.

2.

No green belt in three layers as  per  the  policy  is  found around  the  plant,  though one layer is present

No   green   belt   in   three layers as per the policy is found

On west side there is a paddy field of  third  party  and  hence  only  1 layer  is  planted  outside  the  unit boundary.

3.

The    raw    material    was stacked  higher  than  wall, however  penalty  of  Rs.  2 Lakhs  has  been  imposed upon the unit and the same has been recovered.

The   raw   material   was stacked higher than wall

The stack height has been reduced and  the  unit  is  taking  steps  to ensure   that   the   same   is   not repeated.

4.

Lack  of  interlocking  of  the manufacturing     and     the emission control system

Lack of interlocking of the manufacturing   and   the emission control system

This  is  installed  and  photographs of the same are placed on record.

5.

Stack height of the DG Set is less than  the prescribed norms

DG  Stack  height  is  now  14  feet which is compliant.

Annexure A4

NAME OF THE UNIT-M/S MAHABALI STONE CRUSHER

SL.

No.

OBJECTION        IN        THE INSPECTION REPORT

OBJECTION  IN  THE NOTICE          DATED 27.08.2022

STATUS  OF  COMPLIANCE  AS ON 14.03.2023

1.

Though  tamper  proof  water meter    is    found    on    the tubewell  permission  of  the Ground Water Authority and Log Book was not available

The unit has not obtained ground water permission

Permission has been taken from 17.09.2022 and appropriate log book has been maintained.

2.

Three layers of green belt is found  on  three  sides  of  the unit with a width of 9-10 feet. Only  in  north  east  direction green  belt  is  in  one  layer, which is not as per policy

The green belt as per the   policy   has   not been developed.

The   unit   has   established   a green belt in three layers.

3.

Ducting      and      scrubbing system is not established

No such observation

Ducting  and  scrubbing  system in  in  place  and  operation  and photographs  of  the  same  are annexed

4.

The     raw     material     was stacked   higher   than   wall, however   penalty   of   Rs.   2 Lakhs   has   been   imposed upon the unit and the same has been recovered

Photographs  have  been  placed on record to show that this has been  reduced  and  penalty  for the same was in any event paid.

5.

Lack  of  interlocking  of  the manufacturing      and      the emission control system

No such observation

This  system  is  in  place  and photographs of the same are on record.

6.

No such observation

Premises   road   was damaged

No   such   observation   in   the inspection     report,     however latest photos  show interlocking tiles and cement concrete pucca road without damage.

7.

The DG Set stack height is as per the norms

DG  Set  stack  height is  not  as  per  norms [contrary      to      the inspection report]

DG    Set    Stack    height    was always  18  feet  and  hence  the same is as per the norms

Annexure A5

NAME OF THE UNIT-M/S AV NATURAL PVT. LTD.

SL.

No.

OBJECTION        IN        THE INSPECTION REPORT

OBJECTION  IN  THE NOTICE          DATED 27.08.2022

STATUS  OF  COMPLIANCE  AS ON 14.03.2023

1.

No  water  meter  was  found, permission   of   the   Ground Water   Authority   and   Log Book was not available

Unit has not obtained permission    of    the ground wayer board

Permission has been taken from 31.07.2022.

2.

Green  belt  in  one  layer  has been established around the Plant

The    unit    has    not developed green belt as per the policy

THE   unit   has   developed   the green belt and the photographs of the same are annexed.

3.

Ducting      and      scrubbing system is not established

The    unit    has    not established          the

ducting                and scrubbing system

Established   and   photographs placed on record.

4.

The     raw     material     was stacked   higher   than   wall, however   penalty   of   Rs.   2 Lakhs   has   been   imposed upon the unit and the same has been recovered

Stocking    of    minor mineral      is      done higher than the wind breaking wall

The  minor  mineral  is  stocked less   than   the   height   of   the breaking      wall      and      the photographs  for  the  same  are also placed on record.

5.

Lack  of  interlocking  of  the manufacturing      and      the emission control system

The    unit    has    not provided               for interlocking of the air pollution          control

The  system  has  been  installed and   the   photographs   of   the same are also placed on record.

6.

Stack height of the DG Set is less    than    the    prescribed norms

No such observation

Stack height has been increased to  5  MTS  (15  feet  approx..)  in accordance with the regulation.

7.

No such observation

Unit has not provided for    pucca    settling tank    for   reuse   of washing water.

The      same      was      always established and since the same is  a  large  part  of  the  plant  it cannot be established overnight and  photographs  of  the  same are being placed on record.

Annexure A6

NAME OF THE UNIT-M/S GURU HAR RAI STONE CRUSHER

SL.

No.

OBJECTION        IN        THE INSPECTION REPORT

OBJECTION  IN  THE NOTICE          DATED 27.08.2022

STATUS  OF  COMPLIANCE  AS ON 14.03.2023

1.

No  water  meter  was  found, permission   of   the   Ground Water   Authority   and   Log Book was not available

No  permission  from Ground             water authority   has   been taken by the unit

Consent   has   been   obtained

w.e.f. 16.07.2022

2.

The   green   belt   is   in   two layers around the plant and the  width  is  6  feet.  In  the West  side  there  is  no  green belt and green belt according to     the     policy     is     not established

The    unit    has    not developed green belt as  per  the  policy  of the State

The  green  belt  in  accordance with    the    policy    has    been planted.

3.

The    consent    renewal    is pending       since       original consent         lapsed          on 31.03.2022   and   the   unit though    has    applied    for renewal process is pending

The   unit   does   not possess   valid   CCA as on date

The unit has applied for renewal of CCA on 09.09.2022 however the same has been granted by the  State  PCB  and  hence  in accordance  with   the  Air  and Water Act, the unit has deemed consent  since  4  months  have expired from the date on which a   complete    application    was made.

4.

The     raw     material     was stacked   higher   than   wall, however   penalty   of   Rs.   2 Lakhs   has   been   imposed upon the unit and the same has been recovered

Stocking  of  material was done beyond the height of the wall

The   stack   height   has   been reduced  and  the  penalty/fine stands paid.

5.

Lack  of  interlocking  of  the manufacturing      and      the emission control system

Lack  of  interlocking of the manufacturing and    the    emission control system

The   interlocking   system   has been installed.

6.

Stack height of the DG Set is less    than    the    prescribed norms

The  stack  height  of the   DG   is   not   in accordance  with  the norms

The stack height of the DG Sets has been increased.

7.

No Such observation

The   premises   road was damaged

There is very minor damage  to the internal  road (raw material that  falls  of  the  truck)  and  the Petitioner         has         already established a CC Road

9.

There is no material to rebut the above factual status. Thus, their does not appear to be any need for reverification as directed vide order dated 28.03.2023 with regard to the said six units. Only in respect of M/s Badesha Stone Crusher - Respondent No. 8, compliance status may be re-verified by the State PCB. The State PCB may take remedial action in case of non compliance of the said unit and for past non-compliances, as per law. With regard to remaining nine, since they have reportedly not yet started their operations, there is no cause of action as on today.

10.

In this view of the matter, learned Counsel for the parties submit that nothing survives for further consideration and main matter itself be disposed of.

The O.A. and I.A. stand disposed of accordingly.

If any grievance survives, it will be open to the aggrieved party to take remedies as per law.

A copy of this order be sent to the CPCB, Regional Office of MoEF&CC, Dehradun, UKSPCB, District Magistrate and Superintendent of Police, Nainital by email for compliance.