Tribunals and CommissionsDivision Bench(2026) 08 NGT CK 7086

Aadesh Kumar Yadav vs Uttar Pradesh Pollution Control Board & Ors.

National Green Tribunal, Principal Bench, New Delhi · Decided on 14 August 2026

RESULT
Disposed Of
CASE NUMBER
M.A. No. 97/2025 In Original Application No. 603/2023

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

13 paragraphs · 715 words
1.

This Original Application (OA) was registered on the basis of letter petition dated 05.07.2023 sent by one Aadesh Kumar Yadav, resident of Line Par. Lakshamanpuri Thana, Tehsil and District Moradabad, Uttar Pradesh.

2.

In the said letter petition the Applicant had alleged that Hindustan Petroleum Corporation Limited (HPCL) was carrying out illegal construction in the flood plain zone of river Ram Ganga and Ganga at village Hridayapur, Tehsil and District Moradabad, UP. The Tribunal by order dated 30.11.2023 had impleaded the concerned Respondents and had issued notice to them. The District Magistrate, Moradabad had formed a joint Committee and had placed on record the report of the joint Committee on 18.01.2024 disclosing that on the spot in question the HPCL was lying the PNG/CNG supply pipeline for distribution of the gas received from Gas India Limited.

3.

The OA was disposed of by the Tribunal by the order dated 12.04.2024 directing as under:

“xxx ……………………………………….xxx……………………………..xxx

5.

Tribunal by order dated 30.11.2023 had formed a joint committee which had submitted the report dated 18.01.2024 stating that as per the google map, distance of plant in question is 678.50 meter from bank of river and at the end it is stated that, distance for constructing the embankment from middle of the river is 615 meter. Whether the construction of respondent/project proponent falls within the flood plain zone or not, can be ascertained and action can be taken by the authorities, if required, only after the flood plain zone is demarcated.

6.

Hence, we dispose of the original application, directing the authorities to expedite the process of demarcation of flood plain zone in question and submit quarterly report before the Registrar General of the Tribunal disclosing the progress till the flood plain zone is demarcated and to take action against the respondent/project proponent, if required, after demarcation of the flood plain zone, and submit final action taken report thereafter. If found necessary, the matter will be listed before the Bench for consideration.”

4.

In compliance of the above order, the District Magistrate, Moradabad had filed the report alongwith the covering letter dated 26.07.2024 received on 05.08.2024. On the basis of this report, present Misc. Application was registered.

5.

During the pendency of the MA, the Irrigation Department of UP has filed the report dated 23.04.2026 disclosing that the details of demarcation of flood plain of river Ram Ganga and that the construction in question does not fall in the flood plain zone of the river. The said disclosure made in the report of the Irrigation Department, UP is as under:-

“2.

That as per the directions of the Tribunal, it is humbly submitted that National Institute of Hydrology, Roorkee (Haridwar) through Letter no. SWHC/NIH/2024-25/CS-302 dated 02.04.2026 has informed that for demarcation of Flood Plain Zone (FPZ) on both banks of Ramganga River from “Kalagarh Dam (District Bijnaur) to Kannauj” 1 meter contour interval data provided by Director, Survey of India, Map Bhawan, Uttar Pradesh Geospatial Directorate (Northern Region) 5. Vibhuti Khand, Gomti Nagar, Lucknow has been used. True copy of the Letter dated 02.04.2026 is annexed herewith as Annexure P/1.

3.

That furthermore copies of maps were received from National Institute of Hydrology, Roorkee (Haridwar) regarding demarcation of Flood Plain Zone (FPZ) on both banks of Ramganga River are enclosed. True copies of maps received are annexed herewith as Annexure P/2.

4.

That it is further submitted that based on the coordinates of the Flood Plain Zone (FPZ) of the Ramganga River obtained from the National Institute of Hydrology, Roorkee (Haridwar), Hindustan Petroleum Corporation Limited (HPCL Plant), Village Hridaypur, Tehsil and District-Moradabad does not fall in the Flood Plain Zone (FPZ) of the Ramganga River. True copy of the map of the HPCL Plant is annexed herewith as Annexure P/3.

5.

That it is submitted that on 06.04.2026, the Government of Uttar Pradesh has issued a Government Order no. 262/2026-27 NGT/26-27-S.-4CN-1795582 for declaring Flood Plain Zone (FPZ) on the Ramganga River. True copy of the Government Order dated 06.04.2026 is annexed herewith as Annexure P/4.”

6.

In view of the above, we are of the view that allegation made in the letter petition that construction being raised on the flood plain is unsubstantiated, therefore, no further orders in this MA is required which is accordingly disposed of.