Supreme CourtFull Bench(2009) 12 SC CK 0085

Tatyasaheb Kore Warana S.S.K.Ltd vs Sharad Baburao Patil & Ors

Supreme Court Of India · Decided on 16 December 2009 · Citation: (2011) 12 SCC 543

HON’BLE JUDGES
K.G. Balakrishna, CJ · Asok Kumar Ganguly, J · Dr. B.S. Chauhan, J
RESULT
Disposed Off
CASE NUMBER
Civil Appeal No. 5343, 5413, 5414 Of 2007

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

7 paragraphs · 299 words

Heard both sides.

The Maharashtra Pollution Control Board has filed a statement to the effect that the petitioner/appellant has complied with the directions of this Court and has installed the ESPs. The latest report by the Regional Officer is to the following effect :

"i) The work of installation of ESP No.1 (310A-1) for the Boiler NO.1 (MR 10652), Boiler No.2 (MR 8530), and Boiler No.4 (MR 9730) has been completed and it was found in operation for trial runs;

ii) The work of installation of ESP No.2 (310-B) for the Boiler No.3 (MR 9443) has been completed and it was found in operation for trial runs;

iii) The work of installation of ESP No.3 (310A-2) to the Boiler NO.5(MR 11835) and Boiler No.6(MR 13027) has been completed and it was found in operation for trial runs. A copy of the said report is enclosed and marked as an Exh.1.

iv) The Board has carried out stack monitoring of source emission at ESPs installed to the Boilers 1,2, 4 and 3 on 24.11.2009 and 2.12.2009. The analysis results of total particulars matter emission are within permissible limit of 150 mg/Nm 3 which are general emission standards, as per the Environment (Portection) Rules, 1986 stipulated as a condition in the consent. Copies of reports of air emissions from ESPs attached to boiler Nos.12, 4 and 3 carried out on 24th November, 2009 and 2.12.2009 are enclosed and marked as an Exh.II."

Learned counsel for the respondents disputes the genuineness of this certificate and says that the ESPs have not been installed. The Maharashtra Pollution Control Board, being a statutory authority, cannot be disbelieved. Having regard to this fact, these applications are disposed of with a direction that the company would be at liberty to carry on with the crushing work.