High CourtsDivision Bench(2024) 10 DEL CK 2176

Subrat Kumar Panigrahi vs Hindustan Petroleum Corporation Limited & Ors

Delhi High Court · Decided on 23 October 2024

HON’BLE JUDGES
C. Hari Shankar, J · Sudhir Kumar Jain, J
RESULT
Partly Allowed
CASE NUMBER
LPA 30/2022 & CM APPL. 1837/2022

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

180 paragraphs · 8,273 words

C. Hari Shankar, J

1.

This appeal, under Clause 10 of the Letters Patent applicable to this Court, orders dated 28 July 2021 and 6 August 2021, passed by the learned Single Judge in WP (C) 4005/20201. During the course of arguments, the challenge narrowed down to the order dated 6 August 2021, as would be explained hereinafter.

Facts, and the challenge

2.

The appellant joined the services of the Hindustan Petroleum Corporation Ltd2, which stands arrayed as Respondents 1 to 3 in the present appeal. As the appellant had not been communicated his Annual Confidential Reports3 for the years 1995 to 2015, he approached this Court by way of WP (C) 2941/2019. In the counter-affidavit filed by way of response to the writ petition, the respondent disclosed the appellant’s ACRs to him. The appellant was aggrieved by the gradings of “4” granted to him for the year 1996-1997 and the grading of “3” is granted to him for the year 2018-2019. In accordance with the liberty granted to the appellant by this Court while disposing of WP (C) 2941/2019 on 17 January 2020, the appellant represented against the aforesaid gradings of “4” for the year 1996-1997 and “3” for the year 2018-2090. The representations were rejected by the respondent vide orders dated 11 January 2020 and 27 January 2020. The appellant, therefore, re-approached this Court by way of WP (C) 4005/2020, in which the impugned orders have come to be passed.

3.

The applicable Guidelines issued by the respondent, governing grant of gradings in ACRs, stipulated thus:

GradingDescriptionGuidelines
1Exceptional Performance; Rarely equalled

Far exceeds all individual goals/targets as set out in the performance plan

Performs all job responsibilities far

above the requirement as specified in the job description
2Performance better than normally expected

Meets all and exceeds most individual goals/targets as set in the performance plan

Performs all job responsibilities in excess of the key requirements for the job as specified in the job description

3Normally expected performance, producing required results

Meets all individual goals/targets set in the performance plan

Meets the overall standard and/or expectations established for the job as specified in the job description

4Performance less than normally expected of the position; not producing required results consistently

Generally meets individual goals/targets as set in the performance plan

Does not meet the overall standard for the job as specified in the job description

5Invariably poor performance

Does not meet most individual goals/targets as set in the performance plan

Does not meet job requirements

Performance demonstrates significant weakness in most areas

Counselling and extensive training is required; Individual performance needs to be re-evaluated within 6 months

Impugned Order dated 28 July 2021

4.

The petitioner, in his writ petition, (i) challenged the ACR grading of “3” granted to him for the year 2018-2019, as well as the orders whereby his representation against the said grading was rejected, and, consequently, sought upgradation of his grading, for 2018-2019, to “1”, (ii) challenged the ACR grading of “4” granted to him for the year 1990 6 April 1997, as well as the orders whereby he’s representation against the grading was rejected, and, consequently, sought upgradation of his grading, for 1996-1997, to “1”, (iii) sought constitution of review Departmental Promotion Committees4 to consider him for promotion to the next Salary Grade C w.e.f. 1998 and 2004 respectively, and (iv) sought modification of the Promotion List dated 19 June 2020 issued by the respondent and inclusion, therein, of his name.

5.

We may note, straightaway, that the appellant did not implead any person who had been promoted by the DPCs w.e.f. 1998 and 2004 or any person who figure in the Promotion List dated 19 June 2020. Without impleading such affected persons, prayers (iii) and (iv) could, in any case, not have been granted. The petitioner, however, restricted his relief, before the learned Single Judge as well as before us in appeal, to the correctness of the gradings awarded to him. As such, this issue does not survive further for consideration.

6.

Before the learned Single Judge, learned Counsel for the appellant submitted that he was restricting its challenge to the grading of “3” awarded to him for the year 2018-2019, and was not pressing the challenge against the grading of “4” awarded to him for the year 1996-1997. This is thus recorded, in para 2 of the judgment dated 28 July 2021:

“2.

At the outset, learned counsel for the petitioner would submit that he shall confine the petitioner to challenge the Adverse Performance Rating of ‘3’ for the year 2018-19. In other words, he shall not press the prayer made with regard to his performance rating for the year 1996-1997 and grant of promotion thereafter including his prayer for retrospective promotion to Grade ‘C’ w.e.f. 2004.”

7.

Accordingly, the learned Single Judge, vide the first order under appeal, dated 28 July 2021, adjudicated on the said challenge.

8.

Apart from referring to the judicial authorities on which the appellant placed reliance, the judgment dated 28 July 2021 record the rival contentions, and proceeds to reason thus:

“5.

According to the learned counsel for the petitioner, it is the case of the respondents that the petitioner has either met all the targets or exceeded the targets. Hence, there is no reason for the petitioner to be rated as ‘3’. He qualifies his submission to contend, the said observation of the Reporting/Reviewing Officer cannot be treated as only 'Good'. That apart, he also stated that the rating of ‘3’ is actuated by mala fide on the part of the Management and in fact, as the petitioner has filed this petition, he has been transferred to a distant place like Mysore. He states, even the rejection of the appeal of the petitioner is not in conformity with the observations made by the Authorities in the ACR, as referred to above. Rather, there is no reason for the Authorities to reject the appeal. He relies upon the following judgments in support of his case that his gradings should be upgraded.

6.

On the other hand, Mr. Sachin Datta, learned Sr. Counsel appearing for the respondents would contend that the learned counsel for the petitioner has not drawn the attention of this Court to page 65 of the paper book wherein under the heading "Key Areas where performance was not in line with targets", the following has been stated:-

“The officer could not complete the project (Revamping of ETP) assigned to him during the year due to his lack of involvement and initiatives. Delayed planning for execution had made it to carry over for next year”

7.

Mr. Datta states that in fact, the petitioner had not contested any of the parameters of the ACRs, a reference of which has been made above. Mr. Datta has also drawn my attention to page 80, which is an order rejecting the appeal of the petitioner against his performance rating, wherein the Authority, after due application of mind, has rejected the appeal. He has read to me the decision of the Authority on the grievance of the petitioner and decided to retain the performance rating as '3 '. In this regard, I may reproduce the relevant decision of the Authority in the following manner:-

“This is in reference to the MERC grievance logged by you and subsequent MERC meeting conducted to address the grievance. In this regard, we wish to inform you that the counter-signing authority has critically reviewed the MERC recommendation, which is based on the inputs received through personal interaction during MERC meeting and review of HRD documents including comments by Reporting Officer, Reviewing Officers and Moderation Committee. Based on the same, it is observed and commented as under:

Significant achievements namely; installation of access control and CCTV, HSE reports in portal, etc., are recorded in HRD documents and appropriate comments are recorded by RO/RVO. 2. Assessment of KPIs was reviewed objectively and on overall basis found in order. 3. It is noted that majority of the KPIs were assessed as "Meeting Target". 4. It is noted from HRD document that there are certain key performance areas, were targets were not achieved. For eg. Project on Revamping of ETP. 5. Assessment and feedback by RO was duly acknowledged and accepted by you as per HRD documents. 6. Assigned Rating is commensurate with achievements and within the "system-suggested Rating band", which is based on the assessment of KPIs. 7. Assigned Rating is reviewed considering inter-se performance within the workgroup. In view of the above, detailed review and deliberations on the merit of the case, it is advised that assigned Rating is in order and is "retained".

8.

In effect, it is the submission of Mr. Datta that the observations made in the ACR, as sought to be highlighted by learned counsel for the petitioner is totally misleading. It is a case where the petitioner could not able to meet targets of the work assigned to him. It is keeping in view this aspect also, the petitioner has been rated as 'Good'. He also highlight page 30 of the counter affidavit to state as to what process is evolved by the respondents to carry out a performing rating of a particular officer. The relevant paragraph is reproduced as under:-

"6.

That, with regards to contents of Para 3(xi) and (xii), it is submitted that the respective Supervisor(s)/Reporting Officer(s) of the Petitioner had highlighted the nonperformance of the Petitioner and the areas of development/improvement plan of the performance of the Petitioner but the Petitioner did not relent upon the said advice which was reflected in the overall performance output /rating of the Petitioner. Further, as far as the transfer of the Petitioner is concerned, it is pertinent to highlight here that as per the terms of employment of the Petitioner and business exigencies of the Respondent Corporation, the said transfer was affected, and the Petitioner, by adopting deceitful tactics, is trying to mislead the Hon'ble Court by hinting malice in the said transfer.”

9.

Having heard the learned counsel for the parties, the only issue, which arises for consideration is whether the performance rating of the petitioner as '3' is justified or not. The submission of the learned counsel for the petitioner is that in the ACR, it is the observation of the Authorities that the petitioner has met all the time lines of the work assigned to him and in fact for certain work, he has exceeded the target. In other words, there is no reason for the Authorities to give a performance rating of ‘3’. Such a submission, apparently, may not be correct for the reason that at page 65, which is also part of the ACR, which I have reproduced above, it is noted that the petitioner could not complete the project of revamping of ETP because of which the project had to be carried forward to the next year.

10.

That apart, I find that the respondent has also considered in detail, the representation made by the petitioner with proper application of mind, as is clear from the order itself. That apart, I find that there is a very foolproof system for assessing performance of an Officer at different levels.

11.

That apart, the plea of the learned counsel for the petitioner of mala fide may not be sustainable as the petitioner neither has made the Reporting Officer/ Reviewing Officer or a higher officer than them who accepts the performance rating as a party in this petition. It is the case of the petitioner that the Reporting Officer and Reviewing Officer have graded him as '3', which rating the petitioner accepts. Hence, there cannot be any mala fide on the part of the Reporting Officer/Reviewing Officer. Even the higher authorities have not been made a party, hence the allegations cannot be gone into.

12.

On a specific query to the learned counsel for the petitioner that did the petitioner made an averment in the petition that he has completed ETP project on time, no justifiable answer is forthcoming. In any case, it is the satisfaction of the authority concerned, who actually supervise the work of the Officer, which is relevant. It is the case of the respondents, that assigned rating is reviewed considering inter se performance with the working group and the rating has been retained after deliberations. The scope of interference in the cases of ACR is very limited. In this regard, I deem it appropriate to refer to the judgment of a Division Bench of this Court in the case of Navin Kumar Garg v Union of India5, wherein in paragraph 9 it was held as under:

“9.

Being aggrieved by that speaking order, the petitioner had, as stated above, filed the second Original Application, which has also been considered by the Tribunal. The Tribunal is entirely correct in its observation in noting that in a matter, such as recording of ACRs of an employee where a representation has been made thereagainst and the orders have been passed thereon, there is very little scope for interference by the Tribunal. The same applies to us. We cannot substitute our views for those of the reporting or of the reviewing authorities. In fact, there is no occasion whatsoever, for arriving at any view with regard to an officer inasmuch as we have no knowledge about his working. The persons, who have knowledge of his work, are the reporting and the reviewing officers and they have to grade the officer concerned. In the present case, the gradings were given in the first round without communicating the downgrading to the officer. But that lacuna had been set at rest by the Tribunal by virtue of its order dated 01.04.2011 by directing that the representation of the petitioner in this regard be considered by the competent authority. That has been done. The representation has been considered and a speaking order has been passed. The competent authority has decided to maintain the original gradings given to the petitioner. There is no material before us and there can be no material before us which would enable us to take a different view insofar as the gradings are concerned. As regards the procedure to be adopted after the passing of the order of the Tribunal dated 01.04.2011, we are clear that the competent authority, having considered the representation in detail and having passed a speaking order, has complied with the same. " *****

17.

In view of my discussion above, I do not see any merit in the writ petition. The same is dismissed.”

9.

The circumstances in which the subsequent order dated 6 August 2021, though illustrative of the magnanimity for which the learned Single Judge who has passed the impugned orders is well known, came to be passed, are somewhat disturbing. Despite the specific statement of learned Counsel who had appeared on behalf of the appellant before the learned Single Judge on 28 July 2021, that he was restricting its case to the challenge to the grading of “3” awarded for the year 2018-2019, and was not pressing the challenge to the grading of “4” awarded for 1996-1997, the appellant proceeded to file CM 24705/2021, alleging that no such submission had been made by his Counsel on 28 July 2021 and, therefore, seeking to place the challenge to the grading of “4” awarded to the appellant for the year 1996-1997. The application was not signed by the learned Counsel who had argued the matter on 28 July 2021, and was accompanied only by an affidavit of the appellant. The learned Single Judge, therefore, called upon learned Senior Counsel for the respondent, who had appeared before him on 28 July 2021 – and who is now a learned Sitting Judge of this Court – to vouchsafe regarding the proceedings which had transpired on 28 July 2021. The learned Senior Counsel confirmed that the learned Counsel for the appellant had in fact confined his challenge to the grading of “3” awarded to the appellant for the year 2018-2019.

10.

Despite this, the learned Single Judge, displaying characteristic fairness and magnanimity, condescended to hear the appellant even on the challenge to the grading of “4” awarded for the year 1996-1997. We, frankly speaking, might not have been inclined to be so generous. Apropos the conduct of the appellant, we say no more.

11.

The learned Single Judge proceeded to hold, unexceptionably, that the challenge, by the appellant, to the grading of “4” awarded for the year 1996-1997, as well as the prayers for convening of review DPCs, were hit by delay and laches. Before us, Mr. Mahapatra did not seriously press for setting aside the judgment dated 6 August 2021, which rejected the challenge to the grading of “4” awarded for the year 1996-1997 and the prayers for convening review DPCs and consequential reliefs as barred by delay and laches, and once again restricted his challenge to the grading of “3” awarded to the appellant for the year 2018-2019.

12.

We, therefore, are only required to consider the challenge, by the appellant, to the grading of “3” awarded to the appellant for the year 2018-2019.

Discussion and Findings

13.

Having heard learned Counsel for both sides, and perused the record, we are of the opinion that there is substance in the appellants challenge to the grading of “3” awarded to the appellant for the year 2018-2019. A reading of para 6 of the impugned judgment dated 28 July 2021 reveals that the respondent relied, to support the said grading, on the following note made by the Reviewing Officer in the appellant’s ACRs for the year 2018-2019, against the head “Key Areas where performance was not in line with targets”:

“The officer could not complete the project (Revamping of ETP) assigned to him during the year due to his lack of involvement and initiatives. Delayed planning for execution had made it to carry over for next year.”

14.

Mr. Mahapatra took us through the comments made by the Reporting Officer with respect to various objectives to be achieved by the appellant during the year 2018-2019, as entered in the appellant’s ACRs, and we deem it appropriate to reproduce them, in extenso:

PERFORMANCE AND DEVELOPMENT REVIEW - PART A 2018-2019

AppraiseeSUBRAT KUMAR PANIGRAHI-30067320Print Date28-03-2019
Reporting OfficerDAS ABHIMANYU-31909370Reviewing OfficerSUSHIL KUMAR RAI-31910370
DesignationHE-Ch. Plant ManagerDesignation10F-General Manager - Installation
Comment1. To ensure nil incident/accident in the plant2. To ensure the HSE Index as per the AOP target of 94%. 3. To ensure dispatch of safe cylinders from plant thru conducting SOC of 60nd cylinders.4. To ensure 100% comply of all pending recommendations more than two years made in MDSA/SSA/Security Audit/OISD.CommentKeep the plant ready from OISD inspection point of view. Complete pending recommendation of last OISD, by Sept 18 end.

Financial / Physical

Strategic ObjectivesKey Performance IndicatorsUnit of MeasurementTargets for the YearH1 Milestone (April-September)H2 Milestone (October-March)Weightage
SafetyNear Miss reporting with RCA - Min Z every monthNumbers24.012129
H1 (April to September)
Exceeded the target by reporting 15 near misses over target of 12. Reports are uploaded in the portal including root cause analysis and suggestion with implementation of measures to prevent recurrence. Near misses includes possible toppling of the packed truck in parking area due to water logging, improper cable termination which may turn to potential hazard. Non-strong of backside cage of truck while closing out from loading platform. These finding were also discussed during Safety Committee meetings to enhance awareness among contract workers who are working at shop floorExceeding Target
H2 (October to March)
Exceeded the target by reporting 13 near misses over a target of 12 including root cause analysis and corrective action initiated to avoid re-occurrence of the same. The nearmisses also uploaded in our portal. During the year total 38 nearmisses reported over target of 14. Near misses priced out of unbalanced electrical load in main feeder of building, broken chain of swing platform at TWD gantry, drain cap of LPG compressor in open condition, broken rear view mirror, unhealthy DCP fire extinguishers in truck etc. were reported which create potential hazards. The findings were discussed in the succeeding Safety Committee Meetings, in pop talk with contract labourers to ensure non-repetition by enhancing safety awareness among all workers.Exceeding Target
SafetyHSE IndexPercentage94.093959

H1 (April to September)

Exceeded the target by achieving 96% HSE index over target of 95% which is 3% improvement over target and 2% improvement over historical. The target exceeded due to overall improvement in statutory compliance and compliance of audit recommendations.Exceeding Target
H2 (October to March)
Exceeded the target by achieving 98.14 % HSE Index target in H2 over target of 95%, and it is 2% improvement over achieved 96% in H1 period of the current year. Consolatively 97.9% HSE index is achieved for the year over target of 94%, which is 3% improvement in historical as well as current year target. We enrolled in achieving the HSE index as we have compiled several safety audit recommendations(OISD) by 100% and all most all control safety audit recommendations also before set target date. The improved Behavioural based safety (BBS) culture of plant, cleanliness drive also added to achieve such excellence in HSE index parameters.Exceeding Target
SafetyConducting Fire Drills - fortnightlyNumbers24.012126
H1 (April to September)
Exceeded the target by conducting 14 fire drills over a target of 12. Out of 14 drills 2 drills were conducted in off-shift hours by engaging security staff and contract employees as per fire organisation chart. The 14 fire drills are carried out by conducting minimum 1 fire drill in each of 12 Fire Zones of plant.Meeting Target
H2 (October to March)
Exceeded the target by conducting 13 fire drills over set target of 12 in H2 period. Cumulatively 27 fire drills were conducted in the year over a target of 24 Nos. Fire drills were conducted in 12 designated risk zones covering all ERDMP Scenario and OISD 144 Clause 13 2.5 on fortnight basis. We have conducted 2 fire drills in off shift hours in H2 period to enhance safety preparedness of security guards. The highest risk area of the plant i.e. the filling shed was covered for fire drill once in each and every quarter. The preparedness of plant man and machinery were well appreciated by Govt officials, mutual aid members and officials of Factory Inspections of Haryana while witnessing the drill during Online DMP and time to timeMeeting Target
SafetyNo of accidents & IncidentNumbers0.0004
H1 (April to September)
NIL. By sustainable and exceedingly well maintenance of auto fire fighting system, increased awareness of workforce at plant, we could achieve NIL accidents and incidents during the period under review. Further no loss of working hours and no loss of property achieved during this period which is exceedingly well performance considering the vast area of plant and maximum installed facilities of Bahadurgarli LPG plant.Meeting Target
H2 (October to March)
By sustained and exceedingly well maintenance of emergency fire fighting system, fire fighting equipments, security manpower and security gazettes, we achieved NIL occurrence of any accidents or incident THROUGHOUT THE YEAR. During the last monsoon ,the plant was waterlogged for 2 months but due to proper vigilance, any sort of health hazard was also averted.Meeting Target
Competency EnhancementTraining: Live-Fire Training to cover 100% employees (no of personnel)Numbers6.0428
H1 (April to September)
Exceeded the target as 5 persons nominated for LFT programme at IFSDMS, Baroda over target of 4. The training was conducted on 24-25 August 2018 at IFSDMS, BarodaMeeting Target
H2 (October to March)
Exceeded the target as 4 persons attended Live fire training programme in H2 (6-5th Feb 2019) over target of 2 persons. Cumulatively 8 people undergone training during the current year over yearly target of 6. With this training, all employees, 6 contract employees engaged in safety and maintenance job , 50% strength of security guard (15 in rest) have attended Live Fire training within last 3 years which is the validity period of live fire training certificate.Exceeding Target
Reliability of Operations & ServicesAvailability & uptime of Safety equipments through proper Maintenance schedules/practices viz. Fire engines, fitted by engines, GMS, Fire extinguishers etc including calibration & testingPercentage100.0100%100%8
H1 (April to September)
Exceeded the target as system is modernised by addition of ESD and MCP to the prevailing BGU units to enhance emergency alarm system of fire fighting system. Effectiveness of ERV is live checked for exceedingly well performance during real time rescue operations of en-mute LPG tankers in 3 occasions during the period under review. Effectiveness of fire fighting equipments , Gas monitoring system and other safety equipments were found ready to face any emergency situation during various audit operations. All safety equipments like SRV, TRV, Pressure gauges, Vacuum Gauges were calibrated on schedule.Meeting Target
H2 (October to March)
Healthiness of ERV found excellent in handling en-mute bulk LPG tankers rescue operations on 27.11.18 and during ERV audit by HSE-NZ in H2. commissioning of real time data log system helped monitoring of safety equipments like fire engines, jackets pump, auto FF system and panel round the clock as all data is logged and can be verified at any point of time. 1250 meters of hydrant pipelines replaced. All exciting hydrant lines and FF equipments were painted which were submerged in monsoon as plant was waterlogged. All safety fittings like SRV, TRV, Gauges, were verified and calibrated in due time. All sensors of GMS were verified, replaced on need basis & calibrated to ensure giving audio visual signals during any fault in the system.Exceeding target
Safety & security preparednessNight Inspections: Twice a monthNumbers24.012126
H1 (April to September)
Exceeded the target by conducting 13 inspections over a target of 12 resulting in NIL security breach or theft.Meeting Target
H2 (October to March)
During H2, 14 inspections during night or in odd hours were carried out over target of 12. Hence cumulatively 27 inspections carried out over a target of 12. The inspections has strengthened the security system of the plant resulting in NIL occurrence of any security breach or irregularities during the year under review.Meeting Target

Customer

Strategic ObjectivesKey Performance IndicatorsUnit of MeasurementTargets for the YearH1 Milestone (April-September)H2 Milestone (October-March)Weightage
Cost LeadershipRecognition of Exceptional Performance in Safety & Sachet Implementation: No.of Officers & workmen recognisedNumbersTo recognize 12 persons among officers / employees / contract workers/ truck crew and awarding them during Independence day/ Republic day /Sachet meetings.To recognize 6 persons among officers / employees / contract workers/ truck crew and awarding them during Independence day/ Sachet meetings.To recognize 6 persons among officers / employees / contract workers/ truck crew and awarding them during Republic Day/ Sachet meetings.6
H1 (April to September)
Exceeded the target by recognizing and awarding 16 persons over target of 6 for exceptional performance in implementing SACNET, BBS and safety in the plant selected among officers, employees and contract workmen. All were rewarded during 72nd Independence day 2018. Further 4 persons awarded with Sachet Safety award for both quarters selected among contract labourers and Truck crew.3 best participants were also awarded during Swachh Bharat Abhiyan in July 2018 while conducting various competitions on Swachhts & Satyata.Meeting Target
H2 (October to March)
Exceeded the target by recognizing and rewarding 14 persons over a target of 6 during H2. Cumulatively 37 persons including 2 officers, 4 employees, 12 packed truck crew and 19 contract workmen were rewarded in this year during various occasions. During H2 Sachet safety award was given to 2 employees and 2 contract workers. 2 best driver award was given on completion of each quarter. 4 awards were distributed to contract workers and security staff by arranging quiz and slogan competition during 48th National Safety week (8-10 march 2019). 2 contract workers were awarded on spot at different time at shop floor during verbal quiz on SOP. 2 employees were awarded on 03.11.2018 for quiz competition during vigilance awareness week 2018.Meeting Target
Customer Value MaximisationComplaint resolution. Resolution of complaints from vendors & Contractors - within 30 daysDaysComplaint resolution within 30 days.Complaint resolution within 30 days.Complaint resolution within 30 days.1
H1 (April to September)
Exceeded the target by resolving the grievance of 2 vendors within 2 days of occurrence of grievance. The grievance was related to GST data uploading and the same was resolved in coordination with IS department. The grievance redressed mechanisms of plant was also strengthened by conducting 1 vendor meet on 11.09.2018 and 2 transporters meets on 25.04.2018 & 21.09.2018.Meeting Target
H2 (October to March)
1 Nos Transporter meet (29.10.18)and 2 Nos vendors meet(03.11.18 & 25.02.19) was arranged during H2. Cumulatively 3 transports meet and 3 vendors meet were arranged during the year to strengthen grievance redressal mechanism and to minimize stake holders grievance. During H2 we have resolved grievance of 2 contract workmen raised out of anomaly in their PF payment. The subject contractor was called and in consultation with concerned PF department, the issue is resolved within 30 days of recording of grievance. We have also organized EPF awareness camp on 02.11.2018 in association with EPFO, Kolnak where 4 long pending grievances of contract labourers was resolved by EPFO Enforcement officer and he forwarded 2 grievances for closure.Meeting Target

Process

Strategic ObjectivesKey Performance IndicatorsUnit of MeasurementTargets for the YearH1 Milestone (April-September)H2 Milestone (October-March)Weightage
Capacity & Infrastructure AugmentationExecution of Safety related major projects as per approved NPCB planPercentageTo Complete ETP constructionPreparation of LPR and placement of POInstallation of ETP by March 20199
H1 (April to September)
Target exceeded as along with placement of purchase order for ETP (18000076-OQ-12101).PO placed and fabrication including services completed for 850 meters of hydrant and sprinkler pipelines. LPR processed and Purchase Order for various sizes Gate Valves in hydrant line starting from 300 NB to 80 NB placed with a total cost of Rs. 791393 to maintain the healthiness of hydrant system.Meeting Target
H2 (October to March)
Target exceeded. ETP installed and commissioned. Hydrant and sprinkler pipelines all measuring a total length of 1236 Meters replaced. Incoming an apps, expenditure of Rs.18.3 lakhs. Gate valve & NRV of various sizes ranging from 80 mm to 300 mm NB in hydrant line replaced with a total cost of Rs.7.9 lakhs to better the healthiness of fire fighting facilities. In total 3 projects completed over target of 2 and hence it must be treated as exceeding target.Meeting Target
Cost LeadershipConduct Safety Committee Meetings - Quarterly & CompliancePercentageTo conduct 4 safety committee meetings and to ensure 100% compliance to previous Safety Committee Meeting recommendationsTo conduct 2 safety committee meetings and to ensure 100% compliance to previous Safety Committee Meeting recommendationsTo conduct 2 safety committee meetings and to ensure 100% compliance to previous Safety Committee Meeting recommendations5
H1 (April to September)
Exceeded the target by conducting 2 Safety Committee meetings (29.06.18 & 29.09.18) & 1 Sachet Steering committee meeting along with observance of World Bio-fuel day on 10.08.2018.Pending points of previous Safety committee meeting was discussed and compliance status is recorded. The details of proceeding and attendance are uploaded HSE portal.Meeting Target
H2 (October to March)
Exceeded the target by conducting 2 SCM on 28.11.18 & 19.03.19 and 1 SACHET safety review meet on 19.03.19 In the meetings the gaps in safe operations of facilities and enhancement of behavioral safety requirement was discussed and are recorded. All recommendations of previous SCM are discussed in current meeting and are closed after 100%implementation at field to the satisfaction of members. The formation of safety committee & the health and safety policy of the location was appreciated by Factory Inspectorate during their visit to plant on 8.5.19.Case study of incidents and hazards, new issues are also discussed in each SCM for enhancing safety awareness of all members.The details are also displayed in notice board for wider circulation.Exceeding Target
Enabling CulturePeriodic Health Check-Employers' TT & packed Crew/ Contract workmenPercentageTo cover 100% employee and total 100 Nos contract workers / packed truck crew by arranging 2 health checkup camps for eye check up and 1 for health check upTo arrange 1 eye check up camp covering 50 contract workers / packed truck crewTo cover 100% employee and to arrange 1 health check up camp covering 50 contract workers / packed truck crew8
H1 (April to September)
Exceeded the target by conducting 2 camps for free eye check up facility in association with Brahmasahakti Sanjeevani Hospital, Bahadurgarh in April 2018 in which 107 persons working as contract employees or TT & packed truck crew undergone free check up. Hence the achievement exceeded the set target of 1 camp with 50 persons.Meeting Target
H2 (October to March)
Exceeded the target by arranging 2 health check up camp over target of 5 in H2 in which 208 persons checked over a target of 50. Two day long eye check up camp in association with TITAO eye plus, Delhi was held during 9-10 Oct 2018. Check up done for 123 persons among drivers and contract workers. Health check up camp was arranged during 16-17 March 2019 in association with Brahmasahakti Hospital, Bahadurgarh. Tests including blood checkup, ECG, BP, Audiometry, ENT including physician consultation done along with distributing the reports to individual. Total 83 people benefited. Blood donation camp was arranged in association with Indian Red cross Society on 8.10.18. Total 34 blood samples collected from plant. Thus all targets exceeded.Exceeding Target
Cost LeadershipSwachh Bharat - Ensure 100% working of ETP & effluents released within limitsPercentage100.0100%100%4
H1 (April to September)
Target exceeded as I not only ensured the working of ETP on regular basis including recording of all parameters but also ensured disposal of generated waste thru Haryana State Pollution Control Board registered vendor GEPIL. Further PO finalised for modernisation of ETP facility with an estimated cost of Rs 12 lakhs to include biological treatment unit with the existing effluent treatment facilities.Meeting Target
H2 (October to March)
The effluents released from ETP are periodically tested and the parameters are observed within limit as per the laboratory test reports. During H2 period 1070 Kg of ETP sludge was disposed off on 01.03.2019 vide invoice no 140006189 to Gujrat Enviro Protection and infrastructure ( Haryana) Pvt Ltd who are authorised agency of Haryana pollution control board for sludge disposal and treatment.Meeting Target
Cost LeadershipConcave & implement innovation/process improvement - 2 minNumbers2.0114
H1 (April to September)
Target exceeded as Provision of MCP is commissioned and added to existing safety annunciation provisions and PR presented for shifting of FTU in GMS system to field area from the present position in administrative building over target of 1 projectMeeting Target
H2 (October to March)
In H2, We have shifted 3 Non Field Transmission units( FTU) of Pemas make Gas monitoring system nearer to the concerted location to facilitate and strengthen annunciation system in the field itself. Earlier these FTUs were installed in the administrative building and the same was shifted to comply safety requirement and to ensure fast corrective action in case of gas leak. In H1 period, Provision of Manual Call point ( MCP) completed to facilitate audio visual signal at MCC room and at Gate No2, in case of any emergency situation Total 6 Non MCP installed at vital places both projects implemented successfully.Exceeding Target
SafetyAdherence to Daily Safety Check-list & compliance to points observedPercentage100.0100%100%3
H1 (April to September)
The daily safety checklist is followed regularly and any fault observed in safety system and equipments are attended on daily basis without fail or carry over. Although it is a very very difficult task to maintain the auto fire fighting and safety system of the place which is having 63 Acre area but the same is maintained without any minor or major incidents happened during the period under review.Meeting Target
H2 (October to March)
The daily safety checklist along with auto generated daily SCADA system report, tele tale cock report, GMS activation report, Fire engine log book are reviewed and monitored on daily basis. The anomaly in the system if pointed out in the reports are dealt with immediately to ensure round the clock auto operation of fire fighting system. The healthiness of ERV and associated equipment are also maintained on daily basis. Maintaining safe working atmosphere with complete auto fire fighting facility in a huge land area of 63 acres with 37 deluge valves and maintaining Emergency Rescue Vehicle for handling menses LPU 17 accidents are additional tasks and it was handled excellently through out the year.Meeting Target

Learning and Growth

Strategic ObjectivesKey Performance IndicatorsUnit of MeasurementTargets for the YearH1 Milestone (April-September)H2 Milestone (October-March)Weightage
Competency EnhancementBBS Implementation - reflected thru improvement in housekeeping, M&R, Safety & reduction in at-risk behaviour evaluation thru BBS IndexPercentage90.090904
H1 (April to September)
Exceeded the target by achieving 96% BBS index over target of 90%. We hold monthly meetings of Sachat committee and observer committee and discuss the data gathered from field thru our sachet observers on improved behaviour of employees. As a result of which our BBS index has gone up to 96%.Meeting Target
H2 (October to March)
We have achieved 96% Behavioral based safety index during H2. Cumulatively we have achieved BBS Index of 96% for the year over target of 90% and historical of 94%. We regularly hold SACHET steering & observer team meeting and discuss to implement better behavioral safety for all stake holders. We have displayed SACHET and safety pamphlets for awareness of all and hence achieved such excellent result.Exceeding Target
Competency EnhancementTraining: covering Workman, Drivers, Contract workman, Security staff as per OISD 154 once in a yearPercentageTo cover training for 42 employees, 110 contract workers and 180 packed truck crew as per OISD 154 module.10 training programmes covering 200 participants10 training programmes covering 172 participants3
H1 (April to September)
Exhibit reproduced from the original judgment
Exhibit reproduced from the original judgment
15.

It is apparent, from a bare glance at the above remarks of the Reporting Officer of the appellant, for the year 2018-2019, that the appellant either met, or exceeded, every target set for him during the said year, under every head. The final remark reads: “Exceeded all set targets”. The “Overall Feedback of the Reviewing Officer”, in conclusion, reads:

“Officer is very sincere and responsible and hard working. Maintains good interpersonal relationship. Keeps cool in tense situation. Already got good exposure in the field of safety. Should be given higher responsibility in other field in LPG or any other SBU.”

16.

Though it is true that is may be beyond our remit to afford any qualitative evaluation of the appellant, it would be myopic on our part not to observe that the appellant appears, from a reading of the above entries, to have been an officer of considerable calibre. In that view of the matter, “Part B” of the “Performance & Development Review” of the appellant for the year 2018-2019 makes for surprising reading, and may be reproduced:

PERFORMANCE AND DEVELOPMENT REVIEW – PART B 2018-2019

Name: SUBRAT KUMAR Employee No. 30067320 PANIGRAHI

Designation: Sr. Manager-Operations Curr Designation: Sr. Manger-Locn: Bahadurgarh LPG Plant Operations (12121400) Curr. Locn: Bahadurgarh LPG Plant

Stream: 60 (12121400) Stream: 60

F. ANNUAL PERFORMANCE REVIEW

Significant Contributions made during the year:

1.

The officer has contributed his efforts significantly to complete the installation of access control and CCTV to ensure the improvement in security safety of plant.

2.

The officer has carried out various updates of HSE reports in portal timely.

Key Areas where performance was not in line with targets:

1.

The officers could not complete the project (Revamping of ETP) assigned to him during the year due to his lack of involvement and initiatives. Delayed planning for execution had made it to carry over for next year.

General Behavioural Feedback

1.

The officer is disciplined. He has taken care of plant operations in absence of Plant Manager in addition to his own assigned jobs. The officer needs to involve in team and field jobs for better performance of the plant. He needs to share his knowledge and experience among other officers in team to improve his learning and growth.

Appraisee Comments: My sincere regards for recommending me for higher responsibilities as mentioned in the overall feedback. I confirm you Sir, I will take up higher assignments with continued zeal and dedication. I am thankful to my supervisors for assigning me to LONI LPG Plant before OISD visit and I feel satisfied for meeting the expectation of mgmt. by bringing the location presentable on HSE parameters while working in harmony with LONI LPG plant team. Further I also excelled in all my set KPI targets during the year.

Appraisee: 30067320 – SUBRAT KUMAR PANIGRAHI

Appraiser: 31909370

17.

We are conscious of our limitations in matters where ACR gradings and remarks are under challenge. Judgments of the Supreme Court advocate circumspection and restraint by the Court when dealing with such challenges. This is chiefly because the performance of the officer is best known to his colleagues and superiors, and not to the Court, which has had no occasion to peruse the official’s performance, or assess his work.

18.

There can, therefore, be no question of the Court sitting in appeal over the decision of the Reporting or Reviewing Officers apropos the remarks that they have chosen to enter in the ACRs of officers under their supervision, or the grading that they have finally chosen to award. We are concerned, as are all courts exercising certiorari jurisdiction, with the manner in which the respondents have acted, rather than the ultimate outcome of their action.

19.

Viewed thus, a damaging entry in the ACR, which is contrary not only to the entire record but to the earlier comments entered by the very same officer, and is unsupported by any material whatsoever, cannot be allowed to stand, as it would be manifestly arbitrary. A reading of para 6 of the judgment dated 28 July 2021 of the learned Single Judge reveals that this observation of the Reviewing Officer was, in fact, the main defence of the respondent, to the challenge laid by the appellant to the “3” grading.

20.

Not only is the aforesaid remark in Part B of the appellant’s ACR contrary to all the entries made by the Reporting Officer prior thereto, which clearly note that the appellant had not only met, but in fact often exceeded, the ETP targets; they are even contrary to the Reviewing Officer’s own “Overall Feedback”. It is one thing to say that the Reviewing Officer is entitled to exercise his own subjective assessment of the officer being assessed; it is altogether another to say that the Reviewing Officer can enter starkly contradictory remarks in the ACRs, with the adverse remark being opposed to all earlier entries in the ACRs. In a given case, such an action may smack of mala fides; in this case, no such substantial case of mala fides has been made out by the appellant and we, therefore, are spared the necessity of travelling down that path. At the very least, however, the remarks by the Reviewing Officer in Part B of the appellant’s ACRs, under the head “Key Areas where performance was not in line with targets” is ex facie arbitrary and, therefore, infracts Articles 14 and 16 of the Constitution of India.

21.

Despite grant of opportunity, Mr. Pawan Narang, learned Counsel for the respondents, is unable to provide any basis for the afore-noted entry made by the Reviewing Authority in the performance and development review of the appellant for the year 2018-2019. He ventured to suggest that, if the entire records of the appellant were perused, some basis for the comment might be forthcoming. We are not inclined to embark on any such roving inquiry. Our remit is not to seek to justify, one way or the other, the damaging remark entered by the Reviewing Officer. In view of the preceding entries in the appellant’s ACRs, and the concluding remark by the Reviewing Officer himself, the very least that was required was some mention of the basis for such a discordant entry having been entered by him in Part B of the ACRs. The Reviewing Officer has not chosen to do so. Extrapolating, to the entries in the ACRs, the time-honoured principle, enunciated by Krishna Iyer J. in Mohinder Singh Gill v Chief Election Commissioner6, that an order has to speak for itself, the entries by the Reviewing Officers in the appellant’s ACRs had to speak for themselves. Of course, the Reviewing Officer was not required to adduce detailed reasons for his comments; however, for a comment as discordant with the rest of the ACRs as that entered under the head “Key Areas where performance was not in line with targets”, some justification for the comment had to be forthcoming.

22.

Mr. Narang has, however, sought to submit, firstly, that the overall grading of “3” awarded to the appellant for the year 2018-2019 was in sync with the remarks entered in his ACRs even if the damaging entry of the Reviewing Officer under the head “Key Areas where performance was not in line with targets” were to be ignored, and, secondly, that the appellant had, in his “Appraisee Comments” towards the end of Part B of the ACRs, not protested or objected to the said remark, thereby indicating that he accepted its correctness.

23.

We are not impressed by either contention.

24.

Once the injurious entry by the Reviewing Officer in the appellant’s ACRs is found to be unsustainable and arbitrary, the sequitur has necessarily to be a re-assessment by the Reviewing Officer. As is apparent from the preceding entries made in the appellant’s ACR for the year 2018-2019, the appellant has been uniformly graded as an “Excellent officer”, with the final recommendations of the Reviewing Officer being that he should be given higher responsibility. ETP targets had been noted not just to have been met, but also, often, exceeded by him. The entry by the Reviewing Officer in Part B of the appellant’s ACRs under the head “Key Areas where performance was not in line with targets” is, therefore, obviously seriously damaging to the appellant, and it remains in the realm of conjecture as to the grading which would ultimately have been accorded to him, were the said entry not to have been present. We cannot, therefore, presume that the appellant would still have been graded “3”, especially as the final comment of the Reporting Officer was that he had “exceeded all set targets”, which was echoed by the Reviewing Officer (in Part A of the ACR), who in fact recommended that he deserved to be shouldered with higher responsibilities.

25.

Insofar as the “Appraisee Comments” in Part B of the ACRs are concerned, they, quite obviously, cannot operate as estoppel against the appellant challenging the injurious entry in Part B which preceded it. There is neither an express, nor any implied, acceptance, by the appellant of the said entry. In any event, it would be unthinkable to hold that the appellant can be foreclosed from challenging the entry, whatsoever the outcome of the challenge might be.

26.

Reliance has also been placed, by the learned Single Judge, on the decision of the appellate authority, to whom the appellant had appealed against the grading of “3” awarded to him. There is no notice, however, by the appellate authority, of the apparent discordance between the entry in Part B of the appellant’s ACR and the preceding entries in Part A, including the entry by the Reviewing Authority himself, recommending that the appellant be given higher responsibilities in view of his capability. The order of the appellate authority cannot, therefore, in our considered opinion, eradicate the effect of the injurious entry by the Reviewing Officer in Part B of the appellant’s ACRs. Even otherwise, in our opinion, so fatal, to the integrity of the appellant’s ACR, is the discordant entry by the Review Officer in Part B thereof, that an apparently reasoned appellate order cannot infuse it with life.

Conclusion

27.

Resultantly, inasmuch as the comment by the Reviewing Officer in Part B of the appellant’s ACR for 2018-2019 under the head “Key Areas where performance was not in line with targets” cannot sustain the scrutiny of law, the said entry, as well as the grading of “3” granted to the appellant for the year 2018-2019, awarded consequent thereto, are also quashed and set aside.

28.

Part B of the appellant’s ACRs for the year 2018-2019 is, therefore, directed to be rewritten, and a fresh grading granted to the appellant, within a period of four weeks from today.

29.

Though we express our dissatisfaction about the manner in which the Reviewing Officer has conducted himself in the present matter and had made the aforesaid entry in the appellant’s performance and development review, we refrain from making any further comments in the order as the said officer has not been impleaded personally as a party in the present case.

30.

Observations contained in this judgment are only intended to address the challenge, by the appellant, to the grading of “3” awarded to him in his ACRs for the year 2018-2019. They are not intended to represent any opinion, by us, on the appellant’s performance, or the grading to which he may ultimately be entitled. The respondent would objectively re-assess the appellant, but in accordance with law, and keeping in mind his overall performance, and the entries in Part A of his ACRs.

31.

The impugned order dated 28 July 2021 is, therefore, quashed and set aside.

32.

Inasmuch as Mr. Mahapatra restricted his case to the grading of “3” awarded to the appellant for the year 2018-2019, the order dated 6 August 2021, insofar as it rejects the appellant’s challenge to the grading of “4” awarded for the year 1996-1997, remains undisturbed.

33.

WP (C) 4005/2020 filed before the learned Single Judge, as well as the present appeal, stand allowed to the aforesaid extent.

Footnotes

  1. 1.Subrat Kumar Panigrahi v HPCL & ors
  2. 2."the respondent", hereinafter
  3. 3."ACRs" hereinafter
  4. 4.DPCs
  5. 5.2012 SCC OnLine Del 1593
  6. 6.(1978) 1 SCC 405