High CourtsDivision Bench(2018) 05 DEL CK 0232

STERLITE TECHNOLOGIES LIMITED vs BHARAT SANCHAR NIGAM LIMITED

Delhi High Court · Decided on 18 May 2018

HON’BLE JUDGES
S. RAVINDRA BHAT · A.K. CHAWLA
RESULT
Dismissed
CASE NUMBER
W.P.(C) 3140 OF 2018, C.M. APPL.12502-12504/2018 & 17514 OF 2018

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

177 paragraphs · 1,014 words

Schedule of Requirement (SoR),,,,,

S. No.,"ITEM Description as per

Technical

Specification",Quantity,,,

Supply of Material (As per technical specification given in Annexure A, B &C)",,,,,

1,"OLT Chassis and allied accessory including 19â€

standard rack/ETSI rack, 24 U size with 1+1

power module etc. and the installation materials

equipped with the line cards in n+1 redundancy

mode.",,54,,

1.1,"GPON Ports (Without redundant linec ards)

(Consignee wise distribution of Ports will be

decided by BSNL).",,1038,,

1.2,Redundant Line Cards (Spare 10% of ports at 1.1),,26,,

1.3,Additional OLT GPON Line Cards,,0,,

,Control/switch/uplink card each:,,108,,

1.4,"With 4 No. Optical GE (1000 Base

LX) interface ports",4,,,

,"With 2 No.FE/GE (10/100/10000

Base T)

Electrical interface Ports",0,,,

1.5,"Control/Switch/uplink card each

with two

(2) 10 GE Uplink ports",,3,,

,,,,,

S.

No.","Section

No./Pag e No.",Claus e No.,Clause Description,Clarification sought,BSNL Clarifications

335,"Section-

3 Part-C","1.4 &

1.5","Control/Switch/Upli nk

card each: With 4 no.

Optical GE (1000 Base LX)

interface ports-4 andÂ

Control/Switch/Upli nk

card each with two (2) 10

GE

Uplink ports","In the SoR two type

          Â

of

controller asked

          Â

at        Sr.

No.1.4 & 1.5 as below

with Sr. No.1.4 stating

One Controller Card

  having

1x4G interface and Sr.

No.1.5

stating

controller

having 2x10G interface.

We      d o

understand that OLT

location would be

equipped with","As per tender.

The quantity of item

under serial number

1.4

(control/switch/uplin

ke with 4 numbers of

GE port in each card)

shall be made twice of

quantity of item at

serial number 1 of

Table C, (i.e. chassis)

in each Package. The

quantity of item under

serial number

1.5

(Control/Switch/Upli

nk with 2 numbers of

10GE port in each

card) shall be made

,,,,"either 2 modules of

controller card with

1x4G interface or two

modules of controller

with

2x10G

interface.

Â

Our understanding is

        Â

augmented by

     the following

      two

clauses: “Technical

specification of

OLT Â in annexure-

1†at page-413, here

clause 6.3.1 says there

should be two

termination

  cards

           Â

in

redundancy/loa

d       sharing

configuration.

At page 419 clause

23.9(i)-

OLT must support

network side cards with

1G ports or 10G ports.

Â

Kindly confirm if

         our

understanding is correct.","twice of quantity of ite

at serial number 1

Table C (i.e. chassis) in

Package. However

ordering of GE card or

10GE card shall be

done as requirement.

XX

X",,Xxx,Xxx,Xxx,Xxx

337,Section-,1.2,"Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â

Redundant

          Â

Line",Our,Supply of redundant

,3 Part-C,,"Cards (Spare 10% of ports

at 1.1)","understanding according

to requirement Sr. No.1

of the SoR “equipped

with the line cards in

          Â

N+1 redundancy

mode†bidder has

          Â

to provision one

additional 8 port GPON

card at each OLT

location. In addition to

these redundant cards at

Sr. No.1, is Sr. No.1.2

asking for additional

redundant cards.

Kindly confirm.","line card is to be made

as per requirement of

price schedule item

no.1.2 of Table C of

respective package.

This item is the

redundant line card

which is mentioned as

redundant i.e. N+1 of

item at serial number

1.

Item at serial

number 1.1 & 1.2 are

part of material

mentioned at serial

number 1 of

Table C. T

quantity/number

redundant cards in a

SoR and price sched

shall be equal to numb

of chassis at seri

number 1.

BSNL has evidently taken into account the clarification of,,,,,

29.01.2018 which states that the item redundant line card would be S. no.1, 1.1 and 1.2 and has mentioned as part of material mentioned at S. no.1 of",,,,,

table. C. The crucial terms are that the quantity or the number of redundant cards in all SORs and price schedule shall be equal to the chassis at s.,,,,,

no.1. This obviously meant that the number of chassis is part of the OLT channels, i.e. 54. The petitioner’s bid does not conform to these",,,,,

specifications.,,,,,

10.

It has been repeatedly held that tender prescription or tender conditions, its incorporation or application are left to the primary judgment of the",,,,,

executive authority or the public agency which publishes bids eliciting eligible bidders (Refer Central Coal Fields Ltd. v. SLL â€" SML (Joint Venture),,,,,

&Ors. (2016) 8 SCC 622 and Consortium of Titagarh Firema Adler Spa v. Nagpur Metro Rail Corporation Ltd. (2017) 7 SCC 846 and Afcons,,,,,

Infrastructure Ltd. v. Nagpur Metro Rail Corporation Ltd. (2016) 16 SCC 818). In the present case, terms of tender condition at paras 5.2 and 5.3 and",,,,,

the clarification issued on 29.01.2018 were incorporated in the tender condition itself. The bidders, therefore, were required to comply and furnish",,,,,

appropriate bids incorporating the prescribed quantifies. No doubt, on 29.01.2018, the petitioner’s bid was found to be technically eligible. That,",,,,,

however, did not confer any vested or indefeasible right upon it to say that if there was any shortage in the quantities, the other part of the tender",,,,,

conditions could not be insisted upon by BSNL. In this Court’s opinion, the BSNL contends correctly that the price evaluation stage occurs later",,,,,

and that the question of price or cost loading had to be dealt with subsequently. This Court is satisfied that in the overall circumstances of the case, the",,,,,

BSNL neither unfairly considered the terms nor acted in an arbitrary manner in deciding to resort to holding that some bidders had quoted less number,,,,,

of Redundant cards at Sl. no.1.2 and that their tenders could be loaded by CET in terms of clause 9.2.,,,,,

11.

For the foregoing reasons, there is no merit in the petition. It is accordingly dismissed.",,,,,