Tribunals and CommissionsDivision Bench(2022) 03 NCLT CK 0025

Phoenix Arc Pvt Ltd vs Deegeee Cotsyn Pvt Ltd

National Company Law Tribunal · Decided on 10 March 2022

HON’BLE JUDGES
Pradeep Narhari Desmukh, Member (J) · Shyam Babu Gautam, Member (T)
RESULT
Disposed Of
CASE NUMBER
MA 3760 of 2019 IN CP (IB) 2285/MB/C-II/2018

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

1,371 paragraphs · 7,930 words

Shyam Babu Gautam, Member

1.

The present application is moved by Resolution Professional Mr. Hasti Mal Kachhara (hereinafter called as “the Applicant”) under section 30 (6) of the Insolvency and Bankruptcy Code, 2016 (“code”)  r/w   Regulation   39(4)  of  the  IBBI  (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 for seeking approval of the resolution plan under the provisions of Section 31(1) of the code, for the Corporate Debtor Deegee Cotsyn Private Limited (hereinafter called as the “Corporate Debtor”) and for passing order/appropriate direction that this Tribunal may deem fit in the present matter.

2.

The present Application seeking approval of the Resolution Plan submitted by Manjeet Cotton Private Limited (‘Resolution Applicant’) from this Tribunal under Section 31(1) of the Insolvency and Bankruptcy Code, 2016 (‘Code’).

3.

The CoC in the adjourned 8th CoC meeting held on 01 Noevmber 2019 approved the Resolution Plan filed by Manjeet Cotton Private Limited with 67.54% votes in favour of the plan. Voting was conducted through e-voting facility from 04 November 2019 to 08 November 2019. The last day i.e. 270th day of Corporate Insolvency and Resolution Process is 23 November 2019. Hence, this Application for approval of Resolution Plan u/s. 31 of the Code.

4.

A Corporate Insolvency Resolution Process (hereinafter referred to as “CIRP”) of M/s. Deegee Cotsyn Private Limited (Corporate Debtor) was commenced by Order of your Hon’ble Bench dated 26th February 2019 (certified copy received on 05 March 2019) in Company Petition No. 2285/MB/2018, pursuant to insolvency petition filed by the Financial Creditor under the provisions of Section 7 of the Code and the Applicant was appointed as the Interim Resolution Professional (“IRP”).

5.

A public announcement of CIRP in the present matter was made on 06 March 2019 thereby inviting claims from all the creditors to be filed by 19 March 2019. The details of claims as on the date of filing the present application is as follows:

Sr.

No.

Financial

Creditor

Amount

Claimed

Amount

Admitted

Amount

Rejected

Share

1

IDBI           Bank

(Unsecured)

61,41,79,590/-

47,33,11,572/-

14,08,68,018/-

32.46%

2

Phoenix ARC

324,107,074/-

324,107,074/-

0

22.23%

3

Union   Bank   of

India

308,804,014/-

308,804,014/-

0

21.18%

4

Canara Bank

212,640,679/-

212,640,679/-

0

14.58%

5

Oriental Bank of Commerce

139,199,091/-

139,199,091/-

0

9.55%

Total

159,89,30,448/-

145,80,62,430/-

14,08,68,018/-

100%

Notes:

Interest is admitted up to date of commencement of CIRP i.e. 26th February, 2019

Claims of Unsecured Related Financial Creditors:

Sr No.

Name of Party

Amount Claim

Amount Admitted

Remarks

1

Aditi Bhoot

322,656/-

319,991/-

Note 2 & 3

2

LeelaDevi Bhoot

372,997/-

369,916/-

Note 2 & 3

3

ManjuDevi Bhoot

490,486/-

486,435/-

Note 2 & 3

4

Minaldevi Bhoot

443,109/-

443,109/-

5

Navalkumar Bhoot

12,043,831/-

12,043,831/-

6

Nisha Devi Bhoot

491,852/-

487,790/-

Note 2 & 3

7

P H Combines (Prop.

Pravin Kumar

Bhoot (HUF)

65,177,665/-

65,177,665/-

8

Pawan Bhoot

490,487/-

486,436/-

Note 2 & 3

9

Pooja Bhoot

431,923/-

428,356/-

Note 2 & 3

10

Prakashchandra

Bhoot

441,879/-

441,879/-

11

Pravin Bhoot

490,540/-

486,489/-

Note 2 & 3

12

Prayagchand

Hariram

4,125,938/-

4,125,938/-

13

Pushpadevi Bhoot

30,285/-

30,285/-

14

Sangeeta Bhoot

232,097/-

232,097/-

15

Santosh Bhoot

689,283/-

683,591/-

Note 2 & 3

16

Swastika Bhoot

294,177/-

294,177/-

17

Taradevi Bhoot

34,290/-

34,290/-

18

Ushadevi Bhoot

39,499/-

39,173/-

Note 2 & 3

19

Yog Bhoot

441,570/-

441,570/-

TOTAL AMOUNT

87,084,564/-

87,053,018/-

Notes:

1.

The claims are admitted on provisional basis and are subject to changes

2.

Interest is admitted up to date of commencement of CIRP i.e. 26th February, 2019

As per Regulation 12(2) of Code, 2016 Creditors may submit the claims on or before the expiry of 90 days of the commencement of CIRP i.e. 6th June, 2019, but Hon’ble NCLT, New Delhi Bench passed an order dated 20th May, 2019 in the matter of M/s. Twenty First Century Wire Roads Ltd. and “directed Resolution Professional not to reject claims on the ground of delay as the CIRP is still under progress and no Resolution Plan has been approved by CoC members.”

Claimsof Operational Creditors being Employees and Workmen:

A. List of Employees Claims:

Sr. No

Name                of

Employees

Amount Claimed

Amount Admitted

1

Patru Pise

64,185

64,185

2

Ramesh Naranje

125,820

125,820

3

Shaikh Vakil

54,300

54,300

4

Suchita

Meshram

33,000

33,000

5

Vijay Pendam

30,840

30,840

6

Vishal Bharti

39,165

39,165

Total

347,310

347,310

B. List of Workmen Claims:

Sr.

No

Name              of

Worker

Amount

Claimed

Amount Admitted

1

Asha Nagdive

26,730

26,730

2

Chitralekha

Pandit

46,050

46,050

3

Dharampal

Solanki

9,210

9,210

4

Diksha

Dongare

17,820

17,820

5

Dinesh

Khedkar

40,095

40,095

6

Karun      Vinod

Adakane

12,915

12,915

7

Kiran Meshram

21,525

21,525

8

Kiran Thul

31,185

31,185

9

Lala        Kumar

Jhapate

35,640

35,640

10

Madhu

Kalbhor

40,095

40,095

11

Manisha Sawai

34,440

34,440

12

Mukesh Kalbhor

41,445

41,445

13

Mukesh

Mesare

38,745

38,745

14

Nanda Vaidhya

36,840

36,840

15

Pramod Choudhari

40,095

40,095

16

Sagar Alaspure

31,185

31,185

17

Siddharth Ramteke

35,370

35,370

Claims of Operational Creditors other than Employees and Workmen:

Sr. No

Creditors

Amount Claimed

Amount Admitted

Amount Rejected

Remarks

1

AB      Carter      India Private Limited

122,452

122,452

-

2

AJ   Beltings   Private Limited

121,342

121,342

-

3

Ashwin Enterprises

54,516

54,516

-

4

Commissioner  of Customs NS II

8,300,872

8,300,872

-

5

DV Exports

54,975,657

53,563,230

1,412,427

Note 1

6

Franstek    Belts    Pvt Limited

27,639

27,167

472

Note 1

7

J.   Premramchandani & Co.

121,153

17,403

103,750

Note 1

and Note 2

8

Libra Agencies

44,016

44,016

-

9

Mangalam      Traders (Prop. Bipin

Rathi)

51,165

51,165

-

Note 4

10

Neeraj Enterprises

103,775

103,775

-

11

Nishant Bhoot

1,856,348

1,833,952

22,396

12

Prasham Enterprises

150,619

1,482

149,137

Note  1  and

Note 2

13

RA Enterprises

56,200

56,200

-

14

Satyam          Spinners Private Limited

28,850,582

28,850,582

-

15

Shreeji Polypack

87,224

87,224

-

16

Softcon          Controls Private Limited

178,233

178,233

-

17

Super Tex Industries

1,284,030

1,284,030

-

18

Shreyans    Packaging (Prop. Rajesh

Kochar)

391,438

387,420

4,018

Note 3

19

Commercial         Tax Officer (CST),

Bangalore

16,44,358

16,44,358

-

Note 4

Total

98,421,619

96,729,419

1,692,200

Notes:

1.

Amount admitted as per company's books of accounts as on 26th February, 2019;

2.

The payments made by the Corporate Debtor between 26th February, 2019 to 05th March, 2019 are also considered while admitting the claims.

3.

Interest charged on amount outstanding is not admitted.

4.

As per Regulation 12(2) of Code, 2016 Creditors may submit the claims on or before the expiry of 90 days of the commencement of CIRP i.e. 6th June, 2019, but Hon’ble NCLT, New Delhi Bench passed an order dated 20th May, 2019 in the matter of M/s. Twenty First Century Wire Roads Ltd. and “directed Resolution Professional not to reject claims on the ground of delay as the CIRP is still under progress and no Resolution Plan has been approved by CoC members.”

6.

The updated list of claims as on 10th October, 2019 is as under:

Sr.

No.

Particulars

Amount Claimed

Amount Admitted

Amount Rejected

%

Voting Right

A

Financial

Creditors

159,89,30,448

141,11,08,530

14,08,68,018

100%

IDBI          Bank

(Unsecured)

61,41,79,590

47,33,11,572

14,08,68,018

33.54%

Phoenix ARC

324,107,074

324,107,074

0

22.97%

Union  Bank  of

India

308,804,014

308,804,014

0

21.88%

Canara Bank

212,640,679

212,640,679

0

15.07%

Oriental     Bank

of Commerce

139,199,091

139,199,091

0

6.54%

B

Unsecured Financial Creditors

(Related Party)

8,70,84,564

8,70,53,018

31,546

NA

C

Operational

Creditors

8,84,76,389

8,67,84,189

16,92,200

NA

D

Statutory Dues

99,45,230

99,45,230

0

NA

E

Employee      &

Workmen

8,86,695

8,86,695

0

NA

Total   Amount of           Claims

(A+B+C+D)

178,53,23,326

164,27,31,562

14,25,91,764

7.

The Applicant states that about 9 CoC meetings have been held during CIRP period, as follows, copy of which have been hereto annexed as “Annexure 2 colly”:

Particulars

Date of COC Meeting

1st COC Meeting held on

03 April 2019

2nd COC Meeting held on

15 May 2019

3rd COC Meeting held on

26 June 2019

4th COC Meeting held on

30 July 2019

5th COC Meeting held on

05 September 2019

6th COC Meeting held on

30 July 2019

7th COC Meeting held on

01 November 2019

8th COC Meeting held on

24 October 2019

Adjourned 8th COC Meeting

held on

01 November 2019

9th COC meeting held on

16 November 2019

8.

Various matters have been discussed over CoC meetings and some of the crucial discussions under each of the meetings have been enumerated below which is as follows:

a. Fifth CoC meeting held on 05 September 2019:

(i) The RP informed COC members that the claim of Rs. 61,41,79,589.59 from IDBI Bank against the Corporate Guarantee given by M/s. Deegee Cotsyn Pvt Ltd. (Corporate Debtor) for M/s. Deegee Orchards Pvt Limited (Principal Borrower) under the Corporate Guarantee Agreement dated 22nd October, 2010 is received. The said Guarantee was invoked by IDBI Bank on 10th July, 2014. Further, IDBI Bank has filed suit in Debt Recovery Tribunal, Mumbai on 12th November, 2015 against M/s. Deegee Orchards Pvt Limited (Principal Borrower) and M/s. Deegee Cotsyn Pvt Ltd (Corporate Guarantor). RP put forth its views of the claim and sought approval of the COC members to seek legal opinion on the claim.

(ii) The RP informed CoC members that the Expression of Interest are received from the following seven Prospective Resolution Applicant namely as under:

a) Shree Siddhivinayak Cotspin Pvt Ltd

b) Manjeet Cottton Pvt Ltd.

c) Suraksha Asset Reconstruction Pvt Ltd

d) Gadodiya Oil Mill (Prop.Balkishan Gadodiya)

e) Nagreeka Exports Limited

f) Kedia Enterprises (Prop. Manoj Kedia)

g) Amar Dairy (Prop. Amarlal Khatri)

(iii) Further, the Chairperson informed the CoC members that the last date to submit the Resolution Plan for the Corporate Debtor was Saturday, 31st August, 2019. The Resolution Professional has received Resolution Plans from following Prospective Resolution Applicants till the last date in

SEALED ENVELOPE:

a) Manjeet Cottton Pvt Ltd.

b) Kedia Enterprises (Prop. Manoj Kedia)

c) Amar Dairy (Prop. Amarlal Khatri) and Gadodiya Oil Mill (Prop.Balkishan Gadodiya) (In Consortium)

(iv) Thereafter, the CoC members were of opinion that the bids shall be opened in the presence of the suspended directors, Resolution Applicants and their representatives and after the discussions in the CoC meeting only the financial portion of the bid will be declared in front of the CoC members and respective Resolution Applicants only invited for the purpose and at least one financial creditor of the CoC shall sign on the front page of the Resolution Plan along with the RP representative and the respective Resolution Applicant, if present.

(v) Accordingly, the bids were opened in front of RP and his team, CoC Members, Suspended Directors & all RAs’ however the commercials were not discussed at the time of opening the bid.

(vi) Forensic Report as ascertained from M/s. Pipara & Co. LLP was put forth before COC members for comments

(vii) Valuation Report from M/s. Adroit Valuation Services Private Limited and M/s. Rakesh Narula & Co. received in SEALED ENVELOPE was opened in the presence of CoC members.

b. Sixth CoC meeting held on 24 September 2019:

(i) The chairperson informed that in previous CoC meeting scheduled on 05th September, 2019, the Resolution Plan from following three Prospective Resolution Applicant were received in Sealed Envelope by Resolution

Professional and the same were opened in the said CoC meeting.

1.

Manjeet Cotton Pvt Ltd.

2.

Kedia Enterprises (Prop. Manoj Kedia)

3.

Amar Dairy (Prop. Amarlal Khatri) and Gadodiya Oil Mill (Prop. Balkishan Gadodiya) (In Consortium as M/s. Finkraft Textiles LLP)

(ii) Further, the said Resolution Plans were shared with advisors for the legal vetting of the Plans as per Insolvency and Bankruptcy Code, 2016. The Compliance report of the same was placed on table for the reference of CoC members.

(iii) Detailed discussions took place on the Resolutions Plans received as enumerated in the said minutes

(iv) Audited financial statements for the period ended 31 March 2019 were placed on record for signatures by suspended board of directors.

c. Seventh CoC meeting held on 01 November 2019:

(i) Claim of IDBI Bank to the tune of Rs. 47.33 crores was admitted by the Applicant RP and claim of Rs. 14.08 crores was rejected. On virtue of acceptance of this claim IDBI Bank became part of COC with 33.54% vote share.

(ii) Certain correspondences pertaining to Resolution Applicants between the suspended directors of Corporate Debtor and Applicant was placed on record

(iii) Further discussions took place over the Resolution Plans received.

d. Eighth CoC meeting held on 24 October 2019:

(i) COC members further deliberated and discussed on the Resolution Plans received.

i. Adjourned 8th CoC Meeting held on 01 November 2019;

(i) Discussions on Resolution Plans continued.

(ii) Due to non- cooperation by Suspended Directors and lack of information and details available, the Annual Reports and Financial Statements of Corporate Debtor as on 31st March, 2019 were not prepared and same could not be filed with Registrar of Companies in time. The Annual General Meeting for the financial year 2018-19 was to be conducted on or before 30th September, 2019 but same was not held.

(iii) The Resolution Professional informed that Miscellaneous Application have to be filed with this Tribunal for seeking condonation for conducting Annual General Meeting and for filing necessary return of the Corporate Debtor M/S Deegee Cotsyn Pvt Ltd and COC members took a note of the same.

(iv) The Resolution Plan received from M/s. Manjeet Cotton Pvt Ltd was declared as H1 and put for E-voting. The E-voting portal was kept open for a period of more than 24 hours, i.e. from Monday on, 04th November, 2019, 04:00 p.m. to till Friday, 08th November, 2019, 4.00 p.m. through the e-voting portal of E-voting.

e. 9th CoC meeting held on 16 November 2019;

(i) The RP informed that CoC members has approved the Resolution Plan submitted by Resolution Applicant Manjeet Cotton Private Limited with 67.54% voting share and the E- voting result for the same was circulated to all the CoC members on Friday, 08th November, 2019.

(ii) The Final Voting result is as under:

Sr.

No.

Name of Creditor

Voting Share (%)

Voting    for    Resolution Plan        (Voted        for/ Dissented / Abstained)

1.

Phoenix ARC

22.23%

In favour

2.

Union Bank of India

21.18%

In favour

3.

Canara Bank

14.58%

In favour

4.

Oriental Bank of

Commerce

9.55%

In favour

5.

IDBI Bank

32.46%

Against

TOTAL

100%

(iii) The Applicant RP has informed CoC members that Resolution Professional has received Miscellaneous Application filed by IDBI Bank with Hon’ble NCLT, Mumbai Bench on 05th November, 2019. The said Miscellaneous Application seeks to direct Resolution Professional for admission of the claim amount for Rs. 61.42 Crores as per Form C dated 12th September, 2019 and to update the Committee of Creditors voting share ratio after admitting the said amount. The said Miscellaneous Application was heard in Hon’ble NCLT, Mumbai Bench on 08th November, 2019 and said matter is adjourned till 20th November, 2019. Status of the said application s on the date of filing the application is that the same will be listed for hearing on 11 December 2019.

(iv) Discussions took place upon the Regulation 39B, 39C and 39D of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process For Corporate Persons)Regulations, 2016 as enumerated in the said minutes.

9.

The Applicant RP outlines the various compliances envisaged within the Code and the CIRP Regulations in respect of a Resolution Plan received, considered and approved by the CoC. The compliances envisaged in the Code are to be carried out by the RP and the same are provided hereunder. Copy of the Resolution Plan is hereto annexed and marked as “Annexure 6”:

I.                    Submission of Resolution Plan in terms of sub-section (2) of Section 30 of the Code (as amended vide Amendment dated 16 August 2019):

Sub- clause of S. 30(2)

Requirement

How dealt with in the PlanPara no. and Page

no.

(a)

Plan    must    provide     for payment  of  CIRP  cost  in priority   to   repayment   of other  debts  of  CD  in  the manner  specified   by   the

Board

NIL  CIRP  Costs  since completely  paid  of  out ofinternal resources Section 3 Para 3.2 Application of

FundsPage – 43

(b)

(i)  Plan  must  provide  for repayment  of  debts  of OCs in  such  manner  as may  be specified  by  the Board  which   shall   not be less than the amount payable  to  them  in  the event of liquidation u/s 53; or

(ii)  Plan  must  provide  for repayment  of  debts  of OCs in  such  manner  as may  be specified  by  the Board  which   shall  not be not lessthan amount that   would   have   been paid  to  such  creditors, if   the   amount   to   be distributed    under    the resolution     plan     had been     distributed      in accordance    with     the order of priority in sub- section   (1)   of   Section 53, whichever  is  higher and        provides        for payment    of    debts    of financial  creditors  who do  not  vote  in   favour of  the  esolution plan, in such manner as may be specified by the Board.

Section–3

Page –43 & 46

Rs. In Lakhs

O.C                     9.04

Employees         5.40

Workmen           3.47

Statutory Dues  2.39

20.30

(c)

Management  of  the affairs  ofthe  CD  after approval  of  the

resolution plan

Para 3.8.3

Page – 51 to 53

(d)

Implementation

and Supervision

Under Para 3.8.3 Implementation &Monitoring Page – 51

(e)

Plan does not contravene anyof the provisions of the law for

the time being in force.

Page – 62 & 63 Statement  under Section29A.

(f)

Conforms  to    such

other requirements  as    may   be

specified by the Board

II.                  Measures required for implementation of the Resolution Plan in terms of Regulation 37 of CIRP Regulations:

Particulars

Relevant     Page     of     the Revised   Resolution    Plan dealing                  aforesaid compliance with

Regulation

A   resolution   plan   shall   provide   for   the   measures,   as   may   be necessary,  for   insolvency  resolution   of   the   corporate   debtor   for maximization of value  of its assets, including but not limited to the

following:-

(a) transfer  of all  or  part of  the  assets of  the  Corporate  Debtor  to  one  or More persons;

Operational   Business   Plan Oil  refinery – Hive  off/sale Thermal     Power     Captive Plant – Sale, Page - 40

(b)  sale  of  all  or  part  of  the  assets whether    subject    to    any    security interest or not;

I  the  substantial  acquisition  of  shares of the corporate debtor, or the merger or    consolidation    of    the    corporate debtor with one or more persons;

Para    3.9    –    None    RA proposes  to  cancel  Existing share Page – 54

(ca)  cancellation  or  delisting  of  any shares   of   the   corporate   debtor,   if applicable;

Para    3.9    –    None    RA propose  to  cancel  Existing share  Page  –  54  However bring   in   1300   Lakhs   as Equity share capital Para – 3.7, Page 48 & Para 3.9.2,

Page – 55

(d) satisfaction or modification of any security interest;

Refer  Para  3.9.5,  Page  –

55

(e) curing or waiving of any breach of the  terms  of  any  debt  due  from  the corporate debtor;

Refer  Para  3.9.10  Pages  –

57 to 62

(f)  reduction  in  the  amount  payable to  thecreditors;

No.  But  in  fact  it  provides for payment Rs.1066 Lakhs out  of future  operations  to S.F.C.

Page – 43 and Page 75/76

(g)  extension  of  a  maturity  date  or  a changein interest rate or other terms of  a  debt  due  from  the  corporate debtor;

None

(h)    amendment  of    the constitutional

documents of the corporate debtor;

Refer – Para – 4.4,  Page –

74

(i)    issuance    of    securities    of    the corporate debtor, for cash, property, securities, or in exchange for claims or   interests,   or   other   appropriate purpose;

Infusion  of  fresh  Capital of Rs.1300 Lakhs (E.S.C.) Para – 3.9.2 Page 55 Corporate  Debtor  shall   be

100% subsidiary of RA.

(j)   change   in   portfolio   of   goods   or services  produced   or   rendered  by the corporate debtor;

No.

However Refer Section

– 3Page 42 for sales & Raw

material.

(k)  change  in  technology  used  by  the corporate debtor; and

No. However Refer para –

3.1Pages – 40 - 41

(l) obtaining necessary approvals from theCentral  and  State  Governments and other authorities.

Para – 4.5

Page – 75

III.               Mandatory contents of Resolution Plan in terms of Regulation 38 of CIRP Regulations:

Reference to relevant

Regulation

Requirement

How dealt with in the Plan Para no. and Page no.

38(1)

The  amount  due  to  the operational         creditors under  a  resolution  plan shall be given priority in payment   over   financial creditors.

Nothing specific.

However  payment  of Rs.9.04Lakhs is provided Page – 46 - 47 - 48

38(1A)

A  resolution  plan  shall include a statement as to how it has dealt with the interests  of  all stakeholders,    including financial   creditors   and operational  creditors,  of the corporate debtor.

Not Specific

38(1B)

A  resolution  plan  shall include      a      statement giving    details     if     the resolution   applicant    or any  of  its  related  parties has  failed  to  implement or    contributed    to    the failure of implementation of any          other resolution  plan approved  by   the Adjudicating    Authority at any time in the past.

Not   specifically  stated but otherwise

compliant

38(2)

A   resolution  plan   shall provide:

(a) the  term  of  the planand its implementation schedule;

Time line – Para 3.8Page – 48 – 49

(b)   the    management and  control  of  the business      of      the corporate       debtor during its term; and

Para 3.8.3 (II) (a)

Page – 51 – 52 - 53 - 54

(c) adequate means for supervising          its implementation.

Para 3.8.3 (II)

(b)Page – 51 - 52

38(3)

A   resolution  plan   shall demonstrate that –

(a) it    addresses     the cause of default;

(b) it   is   feasible   and viable;

(c) it has provisions for its                effective implementation;

(d) it has provisions for approvals    required and the timeline for the same; and

(e) the  resolution applicant    has    the capability  to

(f)  implement  the resolution plan.

Section  -  3

Para 3.1 – B

(V)

Page – 41

IV.                Meeting Liquidation Cost under Regulation 39B of CIRP Regulations:

Particulars

Relevant Page of the Revised Resolution      Plan      dealing aforesaid compliance with

Regulation

(1)    While  approving  a  resolution  plan under  sub-section (4)   of   section   30   or deciding to liquidate the corporate debtor under  sub-section  (2)  of  section  33,  the committee  may  make  a  best  estimate  of the  amount  required  to  meet  liquidation costs, in  consultation  with  the  resolution professional,  in  the  event  an  order  for liquidation is passed under section 33.

(2)    Where   the   estimated  value   of   the liquid  assets  under  sub-regulation  (2)  is less  than  the  estimated  liquidation  costs under  sub-regulation  (1),  the  committee shall    approve    a    plan    providing    for contribution  for   meeting  the   difference between   the   two.   (4)   The   resolution professional     shall     submit     the     plan

approved under sub-regulation

Not Proposed

(2)   The   committee   shall   make   a   best estimate of the value of the liquid assets available to meet the liquidation costs, as estimated in sub-regulation (1).

Not Proposed

(3)   Where   the   estimated   value   of   the liquidassets under sub-regulation (2) is less   than   the   estimated   liquidation costs   under   sub-regulation   (1),   the committee    shall     approve     a     plan providing for contribution for meeting the difference between the two.

Not Proposed

(4)     The    resolution    professional    shall submit the  plan  approved  under  sub- regulation (3)   to   the    Adjudicating   Authority while filing the approval or decision of the committee under section 30 or 33, as the case may be.

Explanation.- For the purposes of this regulation,    ‘liquidation    costs’    shall have the  same  meaning  as assigned to it in clause (ea) of sub-regulation (1) of regulation  (2)  of  the  Insolvency  and Bankruptcy        Board        of        India (Liquidation     Process)     Regulations, 2016. (5)

Not Proposed

V.                  Assessment of sale as a going concern under Regulation 39C of CIRP Regulations:

Particulars

Relevant Page  of the  Revised Resolution      Plan      dealing aforesaid compliance with

Regulation

(1)  While  approving  a  resolution plan    under    section    30    or deciding     to     liquidate     the corporate debtor under section 33,      the      committee      may recommend that the liquidator may  first  explore  sale  of  the corporate   debtor   as   a   going concern   under   clause   (e)   of regulation        32        of        the Insolvency    and    Bankruptcy Board of India      (Liquidation Process)  Regulations,  2016  or sale   of   the   business   of   the corporate   debtor   as   a   going concern     under     clause     (f) thereof,     if     an     order     for liquidation   is   passed   under section 33.

Not Proposed

(2)  Where         the         committee

recommends  sale   as  a   going concern,  it  shall  identify and group the assets and liabilities, which      according      to      its commercial       considerations, ought  to  be  sold  as  a  going concern   under   clause   (e)   or clause  (f)  of  regulation  32  of the  Insolvency  and Bankruptcy    Board    of   India (Liquidation Process) Regulations, 2016.

Not Proposed

(3)  The    resolution    professional shall               submit the recommendation        of       the committee  under   sub- regulations  (1)  and  (2)  to  the Adjudicating  Authority  while filing the  approval or  decision of     the   committee     under section  30  or  33,  as  the  case maybe.”.

VI. Assessment of sale as a going concern under Regulation 39D of CIRP Regulations:

Particulars

Relevant   Page   of   the Revised        Resolution Plan dealing aforesaid

compliance with Regulation

While   approving  a  resolution  plan  under   section  30   or   deciding  to liquidate  the  corporate  debtor  under  section  33,  the  committee  may,  in consultation  with  the  resolution  professional,  fix  the  fee  payable  to  the liquidator, if an order for liquidation is passed under

section 33, for –

a)  the  period,  if  any,  used  for  compromise or arrangement under section 230 of the CompaniesAct, 2013;

The CoC in 9th CoC meetingheld 16th November 2019, the fees of liquidator has been approved.

b)  the  period,  if  any,  used  for  sale  under clauses (e) and (f) of regulation 32 of the Insolvency   and  Bankruptcy   Board   of India (Liquidation Process)  Regulations,

2016; and

(c) the balance period of liquidation.

10.

Accordingly, the plan submitted by Resolution Applicant Manjeet Cotton Private Limited was approved with requisite majority. The Applicant states that the resolution plan stood approved by requisite majority in accordance with Section 30 (4) of the Code. A copy of the Revised Resolution Plan of Successful Resolution applicant dated 07 November 2019 along with relevant undertaking and Affidavit under the provisions of Section 29A of the Code is annexed herewith and marked as “Annexure 6”. Hence this Application.

11.

Further a Letter of Intent was issued by Applicant Resolution Professional to the successful Resolution Applicant and the same is annexed herewith and marked as “Annexure 7”

12.

The Applicant submitted that the Compliance Certificate in Form- H under Regulation 39(4) of the Regulations showing the compliances of the Plan as mandatorily required under the Code and Regulations and that the Plan had been approved by the CoC which is produced as hereunder: -

FORM H

COMPLIANCE CERTIFICATE

(Under Regulation 39(4) of the Insolvency and Bankruptcy Board of India (InsolvencyResolution Process for Corporate Persons) Regulations, 2016

1.

I, Hasti Mal Kachhara, an insolvency professional registered with the Board with registration number IP Registration. No.: IBBI/IPA-002/IP-N00342/2017-18/10992, am the Resolution Professional for the Corporate Insolvency Resolution Process (CIRP) of Deegee Cotsyn Private Limited.

2.

The details of the CIRP are as under:

Sr.

No.

Particulars

Description (Dates)

1

Name of the CD

Deegee Cotsyn Private Limited

2

Date of Initiation of CIRP (date of receipt of

Date of Order: 26th

certifiedcopy of order)

February,2019

(Order received on 5th March,

2019)

3

Date of Appointment of IRP (date of receipt of

certified copy of order)

26th February, 2019

4

Date of Publication of Public Announcement

08th March, 2019

5

Date of Constitution of CoC

29th March, 2019

6

Date of First Meeting of CoC

03rd April, 2019

7

Date of Appointment of RP

08th April, 2019

Change in RP

NA

8

Date of Appointment of Registered Valuers

First Valuer – M/s. Adroit Valuation Services Pvt LtdSecond Valuer – M/s. Rakesh Narula & Co.

13th April, 2019

03rd July, 2019

9

Date of Issue of Invitation for EoIFirst

Secon d Third

18th May, 2019 03rd June, 2019

The    last    date    to    submit Resolution  Plan was extended due to modification in Evaluation Matrix.

10

Date  of  Final  List  of  Eligible  Prospective Resolution

Applicants

03rd July, 2019

11

Date of Invitation of Resolution Plan

(as per third EOI published on 30.09.2019)

31st August, 2019

12

Last Date of Submission of Resolution Plan

(as per third EOI published on 30.09.2019)

31st August, 2019

13

Date of Approval of Resolution Plan by CoC

08th November, 2019

14

Date  of  Filing  of  Resolution  Plan  with Adjudicating

Authority

15

Date of Expiry of 180 days of CIRP

01st September, 2019

16

Date of Order extending the period of CIRP

23rd September, 2019

17

Date of Expiry of Extended Period of CIRP

23rd November, 2019

18

Fair Value (Average)

Rs. 5,102.06 Lacs

19

Liquidation value (Average)

Rs. 3,716.90 Lacs

20

Number of Meetings of CoC held

9 Meetings

3.

I have examined the Resolution Plan received from Resolution Applicant - Manjeet Cotton Private Limited and approved by Committee of Creditors (CoC) of Deegee Cotsyn Private Limited.

4.

I hereby certify that-

(i) the said Resolution Plan complies with all the provisions of the Insolvency and Bankruptcy Code 2016 (Code), the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 (CIRP Regulations) and does not contravene any of the provisions of the law for the time being in force.

(ii) the Resolution Applicant Manjeet Cotton Private Limited has submitted an affidavit pursuant to section 30(1) of the Code confirming its eligibility under section 29A of the Code to submit resolution plan. The contents of the said affidavit are in order.

(iii) the said Resolution Plan has been approved by the CoC in accordance with the provisions of the Code and the CIRP Regulations made thereunder. The Resolution Plan has been approved by 67.54% of voting share of financial creditors after considering its feasibility and viability and other requirements specified by the CIRP Regulations.

OR

I sought vote of members of the CoC by electronic voting system which was kept open at least for 24 hours as per the regulation 26. The said e-voting held between Monday, 04th November, 2019 4:00 pm and was open till Friday 08th November, 2019 4:00 pm [strike off the part that is not relevant]

5.

The list of financial creditors of the Deegee Cotsyn Private Limited being members of the CoC and distribution of voting share among them is as under:

Sr.

No.

Name of Creditor

Voting Share

(%)

Voting for Resolution Plan

(Voted for / Dissented /

Abstained)

1.

Phoenix ARC

22.23%

In favour

2.

Union Bank of India

21.18%

In favour

3.

Canara Bank

14.58%

In favour

4.

Oriental Bank of Commerce

9.55%

In favour

5.

IDBI Bank

32.46%

Against

TOTAL

100%

In favour

67.54%

Against

32.46%

6.

The Resolution Plan includes a statement under regulation 38(1A) of the CIRP Regulations as to how it has dealt with the interests of all stakeholders in compliance with the Code and regulations made thereunder.

7.

The amounts provided for the stakeholders under the Resolution Plan is as under:

Sr.

No.

Category of Stakeholder*

Amount Claimed

Amount Admitted

Amount Provided under the Plan#

Amount Provided tothe Amount Claimed

(%)

1

Dissenting   Secured

Financial Creditors

0

0

0

0

2

Other            Secured

Financial Creditors

9847.50

9847.50

3100.00

31.50%

3

Dissenting

Unsecured FinancialCreditors

6141.79

4733.12

71.00

1.50%

4

Other Unsecured

Financial Creditors

870.85

870.53

8.71

1%

5

Operational

Creditors

884.70

867.80

8.68

1%

Government-

99.45

99.45

0.99

1%

Workmen

5.40

5.40

5.40

100%

Employees

3.47

3.47

3.47

100%

6

Other    Debts

andDues (Contingencies) **

237.69

2.39

1%

Total

17853.16

16427.27

3197.61

19.47%

*If there are sub-categories in a category, please add rows for each sub-category.

** Not incuded in the Total.

# Amount provided over time under the Resolution Plan and includes estimated value of non-cash components. It is not NPV.

8.

The interests of existing shareholders have been altered by the Resolution plan as under:

Sr. No

Category of

Share Holder

No. of Shares held before

CIRP

No. of Shares held after the

CIRP

Voting Share (%) held before

CIRP

Voting Share (%) held after CIRP

1

Equity

3,07,20,000

0

100%

0

2

Preference

-

-

-

-

9.

The compliance of the Resolution Plan is as under:

Section  of the  Code  / Regulation

No.

Requirement with respect to Resolution Plan

Clause of Resolution Plan

Compliance

(Yes / No)

Section 25(2)(h)

Whether   the   Resolution   Applicant   meets   the criteriaapproved by the CoC having regard to the complexity and scale of operations of business  of

the CD?

Yes

Yes

Section 29A

Whether   the  Resolution   Applicant  is   eligible to submit resolution plan as per final list of ResolutionProfessional  or  Order,  if  any,  of  the

Adjudicating Authority?

Yes

Yes

Section  of the  Code  / Regulation

No.

Requirement with respect to Resolution Plan

Clause of Resolution Plan

Compliance

(Yes / No)

Section 30(1)

Whether the Resolution Applicant has submitted anaffidavit stating that it is eligible?

Provided

Complied

Section 30(2)

Whether the Resolution Plan:

(a)    provides   for    the   payment   of insolvencyresolution process costs?

Page – 43

Complied

(b)   provides  for  the  payment  of  the  debts  of operational creditors?

Page – 43 to 66

Complied

(c) provides for the management of the affairs of theCorporate debtor?

Page – 51 to 53

Complied

(d) provides for the implementation and supervisionof the resolution plan?

Page – 51

Complied

(e) contravenes any of the provisions of the law forthe time being in force?

Page  62  to 63

Complied

Section 30(4)

Whether the Resolution Plan

(a) is feasible and viable, according to the CoC?

(b) has been approved by the CoC with 66% votingshare?

Page – 41

Yes      Approved      with 67.54% votes in favour

Section 31(1)

Whether  the  Resolution  Plan  has  provisions  for itseffective  implementation  plan,  according  to the CoC?

Complied

Regulation 35A

Where    the    resolution    profesional    made    a determination  if  the  corporate  debtor  has  been subjected to any transaction of the nature covered under  sections  43,  45,  50  or  66,  before  the  one hundred       and       fifteenth       day       of       the insolvency

This  Application  is  in  the process of filing

Section  of

Requirement with respect to Resolution Plan

Clause of

Compliance

the  Code  /

Resolution

(Yes / No)

Regulation

Plan

No.

commencement   date,   under   intimation   to   the Board?

Regulation 38 (1)

Whether  the  Resolution  Plan  identifies  specific sources of funds that will be used to pay the -

(a)  insolvency resolution process costs?

(b)  liquidation value due to operational creditors?

(c)  liquidation  value  due  to  dissenting  financial creditors?

Provides    and    complies with the regulation

Page - 43

Regulation 38(1A)

Whether the resolution plan includes a statement

asto  how  it  has  dealt  with  the  interests  of  all stakeholders?

Not

specifically stated

Otherwise Compliant

Regulation 38(1B)

(i)  Whether  the  Resolution  Applicant  or  any  of its  related  parties  has  failed  to  implement  or contributed to the failure of implementation of any resolution plan approved under the Code.

(ii) If   so,    whether    the    Resolution    Applicant

has  submitted   the   statement   giving   details of such non-implementation?

Not specifically stated

Otherwise Compliant

Regulation 38(2)

Whether the Resolution Plan provides:

(a)  the term of the plan and its implementation schedule?

Page – 48 –

49

Complied

(b) for the management and control of the businessof the corporate debtor during its term?

Page – 51 –

52 - 53 – 54

Complied

(c)      adequate     means     for      supervising     its implementation?

Page – 51 -52

Complied

38(3)

Whether the resolution plan demonstrates that –

(a) it addresses the cause of default?

(b) it is feasible and viable?

Page 41

Complied Complied

Section  of the  Code  / Regulation No.

Requirement with respect to Resolution Plan

Clause of Resolution Plan

Compliance

(Yes / No)

(c)     it     has     provisions     for      its      effective implementation?

(d) it has provisions for approvals required and thetimeline for the same?

(e)  the resolution applicant has the capability to

implement the resolution plan?

Complied

Complied Complied

39(2)

Whether the RP has filed applications in respect of transactions observed, found or determined by him?

This  Application  is  in  the process of finalisation

10.

The CIRP has been conducted as per the timeline indicated as under:

Section of the Code / Regulation No.

Description of Activity

Latest Timeline under regulation 40A

Actual Date

Section 16(1)

Commencement of CIRP and

Appointment of IRP

T

06th March, 2019

Regulation 6(1)

Publication of Public Announcement

T+3

8th March, 2019

Section 15(1)(c)

/Regulation 12 (1)

Submission of Claims

T+14

19th March, 2019

Regulation 13(1)

Verification of Claims

T+21

28th April, 2019

Section 26(6A) /

Regulation 15A

Application for Appointment of

Authorised Representative, if necessary

T+23

N.A.

Regulation 17(1)

Filing  of  Report  Certifying Constitution

of CoC

T+23

29th April, 2019

Section 22(1)

and regulation 17(2)

First Meeting of the CoC

T+30

03rd April, 2019

Regulation 35A

Determination of fraudulent and othertransactions

T+115

The   Application   is in   the    process    of being finalized.

Regulation 27

Appointment of two Registered Valuers

First Valuer – M/s. Adroit Valuation Services Pvt Ltd

T+47

§       13th April, 2019

Second Valuer – M/s. Rakesh Narula & Co.

§       03rd July, 2019

Regulation 36 (1)

Submission of Information Memorandum

to CoC

T+57

§     30 July 2019

Regulation 36A

Invitation of

EoIFirst Second

T+75

§   18th May, 2019

§     03rd June, 2019

Publication of Form GFirst Second Third

T+75

§   18th May, 2019

§   03rd June, 2019

§   The  last  date  to

submit Resolution  Plan was       extended due

to modification in

Evaluation  Matrix.

Provisional List of Resolution Applicants

T+100

28th July, 2019

Pvt Ltd

Final List of Resolution Applicants

T+115

03rd July, 2019

Section of the Code / Regulation No.

Description of Activity

Latest Timeline under

regulation 40A

Actual Date

Regulation 36

(1)

Submission of Information Memorandum

to CoC

T+57

·          30 July 2019

Regulation 36A

Invitation of

EoIFirst Second

T+75

§  18th May, 2019

§     03rd June, 2019

18th May, 2019

03rd June, 2019 The  last  date  to

submit Resolution  Plan was       extended due

to modification in

Evaluation Matrix.

Publication of Form GFirst Seco

nd Third

T+75

Provisional List of Resolution Applicants

T+100

28th July, 2019

Final List of Resolution Applicants

T+115

03rd July, 2019

11.

The time frame proposed for obtaining relevant approvals is as under:

Sr. No.

Nature of Approval

Name of applicable Law

Name of Authority whowill grant

Approval

When to be obtained

1

No time frame provided in Resolution plan

2

3

12.

The Resolution Plan is not subject to any contingency.

Or The Resolution Plan is subject to the following contingencies (Elaborate the contingencies):

i…………………………………………………………………

ii………………………………………………………………...

13.

Following are the deviations / non-compliances of the provisions of the Insolvency and Bankruptcy Code, 2016, regulations made or circulars issued thereunder (If any deviation/ non- compliances were observed, please state the details and reasons for the same):

Sr.

No.

Deviation/Non- compliance observed

Section of the Code

/

Regulation No. /

Circular No.

Reasons

Whether

rectifiedor not

1.

NIL

2.

3.

14.

The Resolution Plan is being filed on the last day (269th day) of the period of CIRP provided in section 12 of the Code.

15.

Provide details of section 66 or avoidance application filed / pending.

Sr.

No.

Type of Transaction

Date of Filingwith Adjudicating

Authority

Date of Orderof the Adjudicating

Authority

Brief of the Order

1

Preferential transactions under

section 43

The    Application is  in   the   process ofbeing finalized.

The  Application is  in  the  process of

bein

g finalized.

The Application  is in the process of

bein gfinalized.

2

Undervalued        transactions

under section 45

3

Extortionate                    credit

transactions under section 50

4

Fraudulent  transactions under

section 66

15A. The committee has approved a plan providing for contribution under regulation 39B as under: Not applicable as COC has approved for Resolution Plan.

(a) Estimated liquidation cost:

(b) Estimated liquid assets available:

(c) Contributions required to be made:

(d) Financial creditor wise contribution is as under:

Sr.

No.

Name of financial creditor

Amount to be contributed

(Rs.)

1.

--

--

2.

--

--

Total

--

15B. The committee has recommended under regulation 39C as under – Not applicable as COC has approved for Resolution Plan.

(a) Sale of corporate debtor as a going concern: Yes / No

(b) Sale of business of corporate debtor as a going concern: Yes / No

The details of recommendation are available with the resolution professional.

15C. The committee has fixed, in consultation with the resolution professional, the fee payable to the liquidator during the liquidation period under regulation 39D – The CoC has approved liquidator fees in the 9th CoC meeting held on 16th November 2019 with 57.99% votes.

16.

I, Hasti Mal Kachhara, hereby certify that the contents of this certificate are true and correct to the best of my knowledge and belief, and nothing material has been concealed therefrom.

(Signature)

Name of the Resolution Professional: Hasti Mal Kachhara

IP Registration No.: IBBI/IPA-002/IP-N00342/2017-18/10992

Address as registered with the Board:

A-602, Nirman Apartments, Pump House, Vikas Nagar, Andheri (East), Mumbai - 400093Maharashtra

Email id as registered with the Board: hastimal.kachhara@gmail.com

Date: 20.11.2019

Place: Mumbai

13.

The Resolution Applicant has agreed to infuse funds for payment of dues towards Resolution Process Costs/Financial Creditors/Operational Creditors/ Government dues etc. as indicated below:

Sr.

No.

Infusion of Fund

Amount Rs.

Lacs

1.

Upfront Cash Payment

Infusion of funds in the Corporate Debtor by way of subscription of  equity  share  capital  of  the  corporate Debtor  and balance  by  way  of  Quasi Capital  either

in form of Debt.

3200

2.

Upon  fulfilment  of  the  conditions  precedent,  the Resolution  Applicant  shall  arrange  for  additional funds  for  infusion  for  improving  operations  of  the Corporate Debtor as may be required, from time to time, including requirement towards operations and maintenance   of   the   business   of   the   Corporate Debtor,  etc.  as  may  be  deemed  fit  by  Resolution Applicant for improving the operations.

Fresh  infusion  of  need  based  working  capital  funds by  way  of  debt  in  the  Corporate  Debtor  by  the Resolution  Applicant  and/or  its  connected  persons and/or  pay  other  entity  related  to  the  Resolution

Applicant, for improving operations.

1600

Sub-Total

4800

3.

The  fund  generated  from  business  cashflow/sale  of other assets of the Corporate Debtor over a period of 1  years  shall  be  utilized  for  payment  to  Secured Financial Creditors in the proportion of their Voting Shares. (The amount mentioned is not NPV)

0

Total

4800

14.

The resolution applicant has also provided breakup of CIRP Cost as follows:

Particulars

From

26.02.19 to 09.08.21

From

10.08.21 to 30.11.21

Total From

26.02.19 to 30.11.21

(A)  CIRP Process related costs:

IRP/RP Fees & OPE

126.93

13.35

140.28

IPE Fees & OPE

105.79

10.80

116.59

Public  Announcement  (Form  A  &

From G)

2.52

-

2.52

CoC Meeting Expenses

1.68

-

1.68

Valuer Fees & OPE

3.55

-

3.55

Fees of Legal Advisors

14.42

0.90

15.32

Security Services Charges

Transaction Auditor Fees & OPE

7.36

-

7.36

Total (A)

273.48

25.92

299.40

Operation Cost for running CD as a

Going Concern (B)

21,688.91

3585.46

25274.37

Total (A+B)

21,962.39

3611.38

25573.76

Total (A+B) (Rs in Crores)

219.62

36.11

255.74

15.

On perusal of the Resolution Plan, it is observed that the Resolution Plan provides for the following:

a) Payment of CIRP Cost as specified u/s 30(2)(a) of the Code.

b) Repayment of Debts of Operational Creditors as specified u/s 30(2)(b) of the Code.

c) For management of the affairs of the Corporate Debtor, after the approval of Resolution Plan, as specified U/s 30(2)(c) of the Code.

d) The implementation and supervision of Resolution Plan by the RP and the CoC as specified u/s 30(2)(d) of the Code.

16.

The RP has complied with the requirement of the Code in terms of Section 30(2)(a) to 30(2)(f) and Regulations 38(1), 38(1)(a), 38(2)(a), 38(2)(b), 38(2)(c) & 38(3) of the Regulations.

17.

The RP has filed Compliance Certificate in Form-H along with the Plan. On perusal the same is found to be in order. The Resolution Plan includes a statement under regulation 38 (1A) of The Regulations as to how it has dealt with the interest of the stakeholders in compliance with the Code and the Regulations.

18.

The Resolution Plan has been approved by the CoC in the 8th meeting held on 08.11.2019 with 67.54% (Sixty-Seven point Fifty-Four percent).

19.

In K Sashidhar v. Indian Overseas Bank & Others (in Civil Appeal No.10673/2018 decided on 05.02.2019) the Hon’ble Apex Court held that if the CoC had approved the Resolution Plan by requisite percent of voting share, then as per section 30(6) of the Code, it is imperative for the Resolution Professional to submit the same to the Adjudicating Authority (NCLT). On receipt of such a proposal, the Adjudicating Authority is required to satisfy itself that the Resolution Plan as approved by CoC meets the requirements specified in Section 30(2). The Hon’ble Court observed that the role of the NCLT is ‘no more and no less’. The Hon’ble Court further held that the discretion of the Adjudicating Authority is circumscribed by Section 31 and is limited to scrutiny of the Resolution Plan “as approved” by the requisite percent of voting share of financial creditors. Even in that enquiry, the grounds on which the Adjudicating Authority can reject the Resolution Plan is in reference to matters specified in Section 30(2) when the Resolution Plan does not conform to the stated requirements.

20.

In CoC of Essar Steel (Civil Appeal No. 8766-67 of 2019 decided on 15.11.2019) the Hon’ble Apex Court clearly laid down that the Adjudicating Authority would not have power to modify the Resolution Plan which the CoC in their commercial wisdom have approved. In para 42 Hon’ble Court observed as under:

“Thus, it is clear that the limited judicial review available, which can in no circumstance trespass upon a business decision of the majority of the Committee of Creditors, has to be within the four corners of section 30(2) of the Code, insofar as the Adjudicating Authority is concerned, and section 32 read with section 61(3) of the Code, insofar as the Appellate Tribunal is concerned, the parameters of such review having been clearly laid down in K. Sashidhar(supra).”

21.

In view of the discussions and the law thus settled, the instant Resolution Plan meets the requirements of Section 30(2) of the Code and Regulations 37, 38, 38 (1A) and 39 (4) of the Regulations. The Resolution Plan is not in contravention of any of the provisions of Section 29A of the Code and is in accordance with law. The same needs to be approved. Hence ordered.

ORDER

The Application IA No. 3760 of 2019 in CP 2285 of 2018 be and the same is allowed. The Resolution Plan annexed to the Application is hereby approved. It shall become effective from this date and shall form part of this order.

i. It shall be binding on the Corporate Debtor, its employees, members, creditors, including the Central Government, any State Government or any local authority to whom a debt in respect of the payment of dues arising under any law for the time being in force is due, guarantors and other stakeholders involved in the Resolution Plan.

ii. The approval  of the Resolution Plan  shall not be construed as waiver of any statutory obligations/liabilities of the Corporate Debtor and shall be dealt by the appropriate Authorities in accordance with law. Any waiver sought in the Resolution Plan, shall be subject to approval by the Authorities concerned.

iii. The Memorandum of Association (MoA) and Articles of Association (AoA) shall accordingly be amended and filed with the Registrar of Companies (RoC), Mumbai, Maharashtra for information and record. The Resolution Applicant, for effective implementation of the Plan, shall obtain all necessary approvals, under any law for the time

being in force, within such period as may be prescribed.

iv. The moratorium under Section 14 of the Code shall cease to have effect from this date.

v. The Applicant shall supervise the implementation of the Resolution Plan and file status of its implementation before this Authority from time to time, preferably every quarter.

vi. The Applicant shall forward all records relating to the conduct of the CIRP and the Resolution Plan to the IBBI along with copy of this Order for information.

vii. The Applicant shall forthwith send a certified copy of this Order to the CoC and the Resolution Applicant, respectively for necessary compliance.