Tribunals and CommissionsDivision Bench(2026) 09 NCDRC CK 7042

Oriental Insurance Co. Ltd. vs Vijay Kantilal Sanghvi

National Consumer Disputes Redressal Commission, New Delhi · Decided on 29 September 2026

HON’BLE JUDGES
A.P. Sahi, J · Bharatkumar Pandya, Member
RESULT
Allowed
CASE NUMBER
NC/FA/121/2022 WITH NC/IA/8455, 1421, 1420, 1419/2022

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

229 paragraphs · 6,470 words

A.P. SAHI, J., PRESIDENT

The Appeal arises out of an order passed on 24.09.2021 in Complaint Case No. 21 of 2012 by the State Consumer Disputes Redressal Commission, Gujarat (for short the State Commission) whereby the Complaint filed by the Respondent/Complainant has been allowed in respect of a loss caused to a vessel having sunk that was covered under a Marine Hull Policy of the Oriental Insurance Company Limited. The terms of the policy are not disputed which provides a trade warranty in respect of operation of the vessel at Karaikal Port, Pondicherry. The policy was taken at Jamnagar, Gujarat.

The condition prescribed with the said policy is that vessel has to proceed to and from any wet or dry docks, harbours, ways, cradles and pontoons within the limits specified in this insurance policy. It covers the perils of the sea and navigable waters and other hazards with limitations, the details whereof need no reference at this stage.

The status of the vessel and its description and the geographical limits within which the vessel was to operate as per the policy was Karaikal Port, Pondicherry and the learned Counsel for the Appellant/Insurance Company Mr. Gola has invited the attention of the Bench to the Marine Hull Proposal Form which also confirms the same against the column of Geographical Limits where the Respondent/Complainant had clearly described the policy to be made available for operation within the geographical limits of the Karaikal Port, Pondicherry.

The vessel is a Motor Tug named KB-1 of 195 BHP that was manufactured in 1999 and was registered with the Registrar of Shipping at Jamnagar, Gujarat.

According to the Appellant/Insurance Company, the vessel had obtained a towing permission on 16.10.2007 that mentions the journey of the vessel from Puducherry to Cuddalore for towing a Dumb Barge KB-V. The permission from the Puducherry Port Authority was also issued on a licence known as the Harbour Craft Licence issued for the said vessel.

The vessel departed from Jamnagar and the Certificate of Departure dated 17.10.2007 refers to the name of Master of the vessel as Mr. Abdul Shaikh. The work of tugging the barge was under a specific contract from the Design and Construction of Marine Terminal Facility at Cuddalore. The work order has also been placed on record. The vessel under the contract had to be tugged to Cuddalore from Karaikal under the terms and conditions of the contract.

The Certificate of Entry at Cuddalore Port has been filed on record which is dated 19.10.2007 where also the name of the Master of the vessel is mentioned as Mr. Abdul Shaikh.

While performing the said job the vessel sunk. The Insurance Company appointed M/s Admire Marine Services Pvt. Ltd. as the Preliminary Surveyors who tendered their report on 24.12.2007. The Final Survey Report was tendered on 19.08.2009.

When the matter was being processed, the Respondent/Complainant represented that one Mr. Musharaf S. Gazi was the Serang of the vessel as if the vessel was being navigated by Mr. Gazi. It is the Certificate of Service of Mr. Gazi that was utilized for raising the claim through the Surveyor. It may be pointed out that a Serang is also equivalent to the Master of a vessel as provided for in the definitions of vessels propelled by mechanical power under the Tamil Nadu Minor Ports Harbour Craft Rules 1953.

The Surveyor submitted a Final Survey Report on 19.08.2009 which records that the tug was allowed to be disposed of on 'as is where is' basis for calculating its salvage and the Final Survey Report recorded the statement of Mr. Musharaf S. Gazi as the Master of the vessel. However, the Final Survey Report indicated that no apparent breach of warranty was observed.

It also provides the qualifications of the Master or Serang with a special condition that he shall have served for not less than 5 years on a harbour craft vessel propelled by mechanical power. It has been urged by Mr. Gola that the Certificate dated 29.09.2008 of Mr. Gazi recites that he had worked only for 4 years, and even otherwise the Certificate was of 29.09.2008 that was issued long after the incident in which the vessel had sunk on 15.12.2007.

Mr. Gola urged that the vessel was not being navigated by a duly qualified Master of the vessel and even otherwise the vessel had been navigating beyond the territorial and geographical limits of Karaikal Port as defined under the policy.

Mr. Gola has then invited the attention of the Bench to the written arguments filed by him on 24.05.2024 vide diary no. 19586.

As noted above, no one has appeared on behalf of the Respondent/Complainant to contest the matter.

We have examined the submissions raised as also perused the documents on record. The Appeal was reported to be delayed by 109 days. A reply to the same had already been filed and, having perused the affidavits, we are satisfied that the delay has been sufficiently explained and accordingly the delay in the filing of the Appeal is condoned and the Appeal shall be treated to have been filed within time.

We have proceeded to hear the matter finally as well. To appreciate the arguments advanced by Mr. Gola and the findings recorded by the State Commission there is more than one reason as to why the impugned order dated 24.09.2021 cannot be sustained and deserves to be set aside. The Complaint has been allowed by the State Commission with a direction to pay the amount of indemnification as claimed together with Rs.25,000/- as compensation and Rs.5,000/- as costs.

The Insurance policy is a Marine Hull Policy with a trade warranty that it shall be governed according to the Port conditions of Karaikal, Pondicherry. The vessel had to proceed to and from the navigation points as specified in terms of the Insurance policy. It is evident that the contract was obtained by the Respondent/Complainant for towing of a Dumb Barge from Puducherry to Chennai by the Ministry of Shipping, Road Transport and Highways Department on 16.10.2007. The possession of a Port Licence is essential that was issued under the Pondicherry Port Harbour Craft Rules, 1970 to the Respondent/Complainant, mentioning the name of Mr. Musraf Gazi for operating at Pondicherry subject to the Pondicherry Port Harbour Craft Rules, 1970. However, when the vessel actually negotiated the waters, according to Mr. Gola, it had travelled beyond its territorial jurisdiction to Cuddalore with one Mr. Abdul Shaikh as the Master of the vessel. The Certificate of Departure dated 17.10.2007 is already on record as Annexure P-5. The Certificate of Entry at Cuddalore Port dated 19.10.2007 is also filed as Annexure P-8 which records the arrival at Cuddalore Port with Mr. Abdul Shaikh as the name of the Master. It is while arriving in the Cuddalore Harbour area that the vessel sank between 12.00 and 12.30 p.m. on 15.12.2007. Intimation was given to the Appellant/Insurance Company and M/s Admire Marine Services Pvt. Ltd. were appointed to conduct a Preliminary Survey. The Preliminary Survey Report dated 24.12.2007 is extracted hereunder:

Annexure-R11

Admire Marine Services Pvt. Ltd.

GOVT. APPROVED INSURANCE SURVEYORS / LOSS ASSESSORS & ANALYSERS

Head Office : 106, Madhuban Complex, Oslo Road, Gandhidiham - 370 201.

Ph. : ++ 91 2836 324284, 228576 • Fax : ++ 91 2836 228555 • E-mail : [email protected] • Lic No. S.L.A. 72428/05-10

Ref. :

Date :

PRELIMINARY SURVEY REPORT

SURVEY REPORT NO: ADM/JAM/INS_082

DATE: 24.12.2007

Pursuant to instructions received from Sr. Divisional Manager The Oriental Insurance Co. Ltd., Jamnagar, our representative, did, attend along shore-line, near Vill Chitrapete near jetty construction site of Messrs. Sanmar Chemplaat Ltd., (T.N). on 18.12.2007 & subsequently in order to survey & report upon upon Motor Tug 'KB - I', which had sunk around 12:00 Hrs. - 12:30 Hours on 15.12.2007, whilst plying in Kadur harbour area. We now report as under:-

I. INSURANCE PARTICULARS:

INSURERS

The Oriental Insurance Co. Ltd., Divisional Office, "Swagat", 3rd Floor, Opp. Hotel Regency, P. N. Marg. Jamnagar - 361 008

INSUREDS

Shri Vijay K. Sanghaw & other partners of M/s. K. B. Shipping & Co., Jamnagar.

TYPE OF POLICY

MARINE HULL POLICY

POLICY NO.

143700/308/4732/22/60016/2007

PERIOD OF INSURANCE

From: 05.01.2007 To: 04.01.2008.

II. OTHER RELEVANT DETAILS:

TIME & DATE OF LOSS / DAMAGE

Around 12:00 - 12:30 Hours on 15.12.2007.

DATE OF SURVEY

18.12.2007 & Subsequently.

PLACE OF SURVEY

Along shoreline, near Vill. Chitrapete near jetty construction site of Messrs. Sanmar Chemplaat Ltd., (T.N).

This report is issued subject to the conditions that it is understood and agreed that neither firm nor any of its surveyors is under any circumstances whatsoever to hold responsible for any report or certificate issued by this firm or its surveyor or for any error of judgment, default, or negligence of its surveyor or agent.

Admire Marine Services Pvt. Ltd. SURVEY REPORT NO: ADM/JAM/INS 052

DATE: 24.12.2007 Continuation sheet No. 3

VIII. REVIEWING OF DOCUMENTS

Vide our letter bearing ref. No. ADM/JAM/LTR_078 dated 18.12.2007, we had raised our preliminary requirement of documents to the insured, which were not yet received by us. - Copy of the letter is attached herewith.

Issued without prejudice and subject to the terms and conditions of the relevant policy of insurance, reserving the right to alter/amend any unintentional error/omission, if any

For Admire Marine Services Pvt. Ltd.

A Final Survey was also conducted and the Report dated 19.08.2009 is extracted hereunder:

ANNEXURE A13

Admire Marine Services Pvt. Ltd.

GOVT. APPROVED INSURANCE SURVEYORS / LOSS ASSESSORS & ANALYSERS

Head Office : 108, Madhuban Complex, Odo Road, Gandhidiham - 370 201.

Ph. : ++ 01 2836 324384, 228578 • Fax : ++ 01 2836 228595 • E-mail : [email protected] • Lic No. S.L.A. 72428/05-10

Ref. :

Date :

FINAL SURVEY REPORT

SURVEY REPORT NO: ADM/JAM/INS_0432

DATE: 19.08.2009

Pursuant to instructions received from Regional Office, The oriental Insurance Co. Ltd., Ahmedabad R. O., Ahmedabad through Jamnagar D.O., our representative, did, attend in connection with ill-fated tug "KB-I" Reg. No.: PY-367 along shore-line, near Vill. Chitrapeta near jetty construction site of Messrs. Sanmar Chempast Ltd., (T.N), on 18.12.2007 and on subsequent dates during salvage operation, in order to survey & report upon Motor Tug "KB - I", which had sunk around 12:00 Hrs. ~ 12:30 Hours on 15.12.2007, whilst plying at Cuddiore harbour area. We now report as under

I. INSURANCE PARTICULARS:

INSUREDS

Shri Vijaykumar K. Sanghavi & others, Partners of Messrs. K. B. Shipping & Co., 11, Bardanwala Road, Grain Market, Jamnagar.

INSURERS

The Oriental Insurance Co. Ltd., Division Office, "Swagat", 3rd floor, P. N. Marg, Jamnagar.

MATINE HULL INSURANCE POLICY NO. PERIOD OF INSURANCE NAME OF VESSEL INTEREST INSURED SUM INSURED SPECIAL CONDITIONS & WARRANTIES CLAUSE &/OR ENDORSEMENT ATTACHED AGREED BANK CLAUSE DEDUCTIBLE EXCESS

143700/308/4732/22/90016/2007. From: 05.01.2007 To: 04.01.2008. M.T. "KII-I" Hull and machinery Rs. 25,00,000.00 As per schedule attached. ITC hull port risk, TL/CTL/SC/S & L Charges P & I Cover, Wreck Removal. Nil 1.5% OF Sum Insured or Say Rs. 37,500.00

II. PARTICULARS OF THE TUG:

OWNERS

Shri Vijay K. Sanghavi & other partners of M/s. K. B. Shipping & Co., Jamnagar.

NAME OF VESSEL

Motor Tug "KB-I"

REG. NO.

PY-367

YEAR & PLACE OF BUILT

Kalvan (Thane), 1999.

TYPE OF VESSEL

Motor Tug

LENGTH OVERALL

14.00

Mtrs.

BREAKTH

04.50

Mtrs.

DEPTH

02.20

Mtrs.

GROSS TONNAGE

27

NET REGISTERED TONNAGE

08

This report is issued subject to the conditions that it is understood and agreed that neither firm nor any of its surveyor is under any circumstances whatsoever to hold responsible for any report or certificate issued by this firm or its surveyor or for any error of judgment, default, or negligence of its surveyor or agent.

III. BRIEF DESCRIPTION OF THE MOTOR TUG:

All steel, carvel built, single screw tug. Tug is having flush forecastle & poop deck. The hull is provided with forward & aft peak tanks, engine room, side buoyancy tanks on port & starboard side of cargo hold, accommodation & wheel house.

IV. MAIN PROPULSION MACHINERY:

MAIN ENGINE : Second-hand: Make: Cummins; 6 Cylinders; BHP: 195@1800 RPM; 6 Cylinders; Model No.: NP - 743; Sr. No. 25243238; Fuel: Diesel; Water cooled.

GEAR BOX : Second-hand Make: M/s. Krioskar Pneumatic Company; Model: MG-512; Sr. No.: Obliterated; Ratio: 4.15:1

PROPELLER : 1 No. fixed pitch, Mn. Br. Propeller.

STEERING GEARS : The tug is provided with steering helm & chain with associated fittings.

V. OTHER RELEVANT DETAILS:

TIME, DATE & PLACE OF INCIDENT OF DAMAGE : Around 12:00 Hrs. ~ 12:30 Hours on 15.12.2007, whilst plying at Cuddore harbour area.

DATE & PLACE OF SURVEY : On 18.12.2007 along shore-line, near Vill. Chitrapete near jetty construction site of Messrs. Sanmar Chemplast Ltd., (T.N) and on subsequent dates during salvage operation.

VI. BACKGROUND & OCCURRENCE:

BACKGROUND:

Motor tug "KB-I" Reg. No.: PY-367 was built at Rosy Port in the year 1999. The tug was utilised for towing dumb barges, etc. between shore & anchorage point and for port operations. We further gathered from Insured that they had supplied their tug to Messrs. Sanmar Chemplast Ltd., (T.N) and was operating at their jetty construction site near Vill. Chitrapete.

PRE-ACCIDENT CONDITION OF THE TUG:

Whilst the M.T. "KB-I" Reg. No. PY-367 (Bedi Port Reg. No. B.P. 1137) was lying at Karaikal Port, Pondicherry, our representative had inspected the same on 02.01.2007 and our findings are inserted in our survey report No.: ADM/JAM/INS_001 dated 04.01.2007. At the time of our inspection, i.e. on 02.01.2007, the tug was found to be fit in all respect to withstand ordinary perils associated with inland waterways. -A copy of our aforesaid survey report is attached herewith as ANNEXURE-I.

In view of our inspection / survey as above and based on our queries to supervisor, master, engine driver, crew, etc., at the time our inspection, we consider pre-accident condition of the tug to be free from any defects and fit to withstand ordinary sea perils.

OCCURRENCE:

Our representative had discussions with master of the tug M.T. 'KB - I' and also with owners of the tug and we learnt that whilst she was plying in Cuddore harbour area near river mouth, master & crew of the tug noticed entry of sea water into under-deck accommodation compartment. Due to abrupt rise in water level they were unable to find the location of the leakage. Looking to the situation, master moved the tug towards shore line off Vill. Chitrapete. Master of the tug 'KB - I' succeeded in moving the tug abreast shore line off Vill. Chitrapete. The tug grounded whilst she was off the shoreline around 55 ~ 65 Mtrs. Master and crew members left the tug and reached to shore.

They informed the tug owners regarding the incident, who accordingly applied for survey.

VII. OUR INSPECTION/ SURVEY:

PRELIMINARY SURVEY:

Our representative attended along shoreline, near Vill. Chitrapete near jetty construction site of Messrs. Sanmar Chempast Ltd., (T.N), on 18.12.2007 & on subsequent dates and noted that the tug 'KB - I' had overturned, resting on her starboard-side in sandy sea bed around 55 ~ 65 Mtrs. away from shore line. During low tide hours port-side bulwark, shell and cabin becomes visible, remaining portion remains submerged in water.

All feasible option to salvage the tug were discussed and finally, a 75 ton capacity crane along with necessary tools, tackles, equipments and a team of experienced people was employed to lift the tug from location where she had grounded. While the operation was under progress, cyclonic weather was repeatedly being experienced in the area and, it was delayed. Later on, when weather permitted the operation was vigorously carried out. However, the operation could not be succeeded.

Fine sand & mud had entered into under deck compartments of the tug and instead of being lifted; the tug has slowly sunk into the sandy sea bed.

During our further discussions, it was suggested to call upon professional salvagers, consider their view and decide upon future course of action.

SALVAGE PROCEDURE:

We had detailed discussions with insured as well as underwriters Jamnagar D.O. regarding the situation and status of the ill-fated tug. We contacted various prospective salvages, who were willing to work at the site of sinking and asked them to forward us/insured their quotation in sealed cover. During our continuous contact with insured and prospective salvager, we understood that 3 Nos. quotes were received by the insured in sealed cover. We asked insured to submit the same to underwriters Jamnagar D.O.

Insured submitted the quotes to underwriters on 28.12.2007. We also remained present at underwriters office and the covers containing the quotes were opened up in presence of all the concerned and details of the quotes were as under:

1.

Shree Shakti Engineering, Jamnagar Rs. 11,71,000.00

2.

Messrs. Padhiar Hi-Tech Pvt. Ltd., Jamnagar Rs. 11,21,000.00

3.

Messrs. Dharmadi Srinu & Salvage Part, Kakinada Rs. 12,00,000.00

The photostat copy of above quotes, alongwith insured's letter are attached herewith as ANNEXURE-II.

As per the terms manpower, divers, tools, tackles & equipments, etc. required for salvage operation are to be supplied & utilised by the salvagers in their account. The terms and conditions were negotiated in detail with the salvagers as well as insured. Looking to the prevailing practice in the region same were considered fair and reasonable.

The rates quoted by Messrs. Padhlar Hi-Tech Pvt. Ltd., Jamnagar, Rs. 11,21,000.00, were the lowest. Further, after receiving above quotes, we negotiated with them in detail and also considered the situation of sunken tug and found to the rates quoted by Messrs. Padhlar Hi-Tech Pvt. Ltd., Jamnagar, at Rs. 11,21,000.00, on 'No cure no pay basis' as reasonable. Further, we noted that they are experienced in similar kind of jobs.

In view of the above, we advised underwriters to issue salvage work-order in favour of Messrs. Padhlar Hi-Tech Pvt. Ltd., Jamnagar, for above work at the cost of Rs. 11,21,000.00, on 'NO CURE NO PAY BASIS'. Accordingly underwriters released the work order. - Photostat copy of underwriters work order dated 28.12.2007 is attached herewith as ANNEXURE-III.

We also asked salvagers and insured to convey us their schedule to move manpower and material to work site.

SALVAGE OPERATION:

We remained in continuous contact with insured and salvager and continuously stressed for commencement of the salvage material. The required material i.e. Winch, Wire ropes, pulley, D-shackle etc. were dispatched from Jamnagar on 04.01.2008.

Our representative did attend at Cuddore site on 17.01.2008 & 28.01.2008, when salvage operation was being carried out. Salvagers were making efforts by pulling the tug towards shore after making the seabed abreast tug smooth. However, they were not succeeding. Further, it was also not possible to turn the tug upright & make is afloat as she was lying in shallow water.

During the course of salvage operation our representatives remained posted at the site.

After prolonged discussion with the salvager & insured and mind-bearing the situation and condition of the seabed and water level at shoreline, the best alternative was to drift the tug from its current position towards shore or to make a road up to the tug and lift it through a crane. The second option was very costly and also whilst attempting it there were possibility of major damage to the hull of the tug, which would result in abrupt rise in repair cost of the tug after salvage operation.

After due consideration of all the options, salvager was allowed to continue salvage operation. Salvager made arrangement of one another winch and attempted to turn the tug and shift it from its current position. However, they did not succeed in salvaging the tug. The tug further sunk into muddy seabed.

We had a meeting with insured and salvager, and after prolonged discussion a plan to install heavy winches at site was made. It was decided to make attempt to free the tug from seabed by passing air below her and drag her towards shore was prepared.

Accordingly winch, compressor, pulleys, wire-ropes, d-shackles & other tools and tackles were dispatched from Jamnagar on 20.05.2008.

The salvager arranged the salvage operation at site as planned and made extreme efforts. However, they did not succeed in salvaging the ill-fated tug. During the operation, our representatives remained continuously posted at site.

STATUS OF THE TUG (POST SALVAGE OPERATION):

As the salvager, did not succeed in salvaging the tug and also we felt that they may not continue the operation. We asked insured to ask salvager to clarify the status.

Later on, vide their letter dated 25.08.2008, salvager Messrs. Padhlar Hi-tech Pvt. Ltd., Jamnagar had informed the insured that they are unable to salvage the tug and the salvage operation was not possible anymore and they were de-mobilising their man-power & tool-tackles from the site. Insured furnished us the copy of the salvagers' letter and apprised us regarding the status. - Photostat copy of salvager's letter dated 25.08.2008, is attached herewith as ANNEXURE-IV.

FURTHER ACTION:

When the salvager, Messrs. Pachlar Hi-tech Pvt. Ltd., Jamnagar completed their last efforts unsuccessfully, we as well as insured kept on approaching other prospective salvagers, apprise them the situation of the tug and request them to furnish with their quotes to us or insured. Insured received following two quotes for salvage operation on mail / fax from Chennai based salvagers:

1.

Messrs. Akshaya Marine Engineering, Chennai Rs. 17,22,000.00

2.

Messrs. Hindusathan Marine Engineering Works, Chennai Rs. 25,00,000.00

However, both of the quotes were for advance part payment and were not agreeing to terms 'NO CURE NO PAY BASIS' - Photostat copies of the quotes are attached herewith as ANNEXURE-V.

Looking to the situation, we asked Insured to release advertisement in any local daily for the salvage operation on an urgent priority and same was released in Chennai based Newspaper 'The Hindu' on 25.08.2008. - Photostat copy of the same is attached herewith as ANNEXURE-VI.

Vide their letter dated 23.09.2008, Insured apprised underwriters & us that till date they had not received any quote from any prospective salvager. -Copy of Insured's letter is attached herewith as ANNEXURE-VII.

OUR FURTHER INSPECTION / SURVEY:

As arranged with Insured, our representative, remained present at location of the sunken tug on 30.09.2008 and inspected the tug and surrounding situation and noted that the tug had further settled in sandy shore-line bed. The sand is fine and sticky in nature. The condition of the tug had further deteriorated.

On our discussion with Insured and other salvagers, and on our inspection / survey, we noted that the other method of salvaging the tug is making efforts by crane to lift the same. For that an approach for crane should be prepared. This will add upon a huge salvage cost. Further, lifting of the tug may result in severe damages to hull & superstructure of the tug. Further, after lifting the tug it is to be loaded onto a trailer and moved to nearby dry dock at Cuddiore port area.

If the tug is salvage by above method, the salvage cost shall reach to Rs. 16 ~ 20 Lacs and cost of repair to the tug after salvaging may reach to approx. Rs. 15 ~ 20 Lacs. If the tug will be allowed to be repaired & salvaged, the total cost would be approx. Rs. 31 ~ 40 Lacs, which would be above sum Insured Rs. 25,00,000.00.

In view of the above, we found it advisable to dispose off the tug in as it where is basis. Vide our letter bearing Ref. No.: ADM/JAM/LTR_0220 dated 10.11.2008, we requested underwriters to confirm if they find above on right track. - Copy of the letter is attached herewith as ANNEXURE-VIII.

We also apprise the Insured our stand vide our letter bearing Ref. No.: ADM/JAM/LTR_0219 dated 08.11.2008. - Copy of the letter is attached herewith as ANNEXURE-IX.

Vide their e-mail dated 30.12.2008, underwriters advised us to proceed in the matter. - Copy of the e-mail is attached herewith as ANNEXURE-X.

We apprise Insured the status and asked them to release advertisement in any local daily for disposal of the tug on 'AS IS WHERE IS BASIS' on an urgent priority and same was released in Chennai based Newspaper 'The Financial Express' of 05.01.2009. - Photostat copy of the same is attached herewith as ANNEXURE-XX

In response to the advertisement, one quote from Shree Swastik Engineering Works, Jamnagar for the tug on 'AS IT WHERE IS' basis for Rs. 1,65,000.00 and also they offer to remove the tug from its current position. - Photostat copy of the quote is attached herewith as ANNEXURE-XII.

We updated underwriters regarding the above, vide our letter bearing Ref. No.: ADM/JAM/LTR_0295 dated 05.03.2009 and requested to confirm us further action to be taken. - Copy of this letter is attached herewith as ANNEXURE - XIII.

Vide their e-mail dated 08.06.2009, underwriters advised us to proceed in the matter. - Copy of the e-mail is attached herewith as ANNEXURE-XIV.

Vide our letter bearing ref. No.: ADM/JAM/LTR_044 dated 08.06.2009, we asked insured to call upon the highest bidder Shree Swastik Engineering Works, Jamnagar and prepare a sale - agreement with them. In this letter we also described terms pertaining to wreck removal & any third party liability, which would be of the bidder. - Copy of the letter is attached herewith as ANNEXURE-XV.

Insured executed the sale-agreement with the salvage buyer on 09.07.2009. - Original copy of the agreement is attached herewith as ANNEXURE-XVI. The terms pertaining to the Wreck Removal & Third Party Liability are forming part of the agreement.

VIII. INVESTIGATION INTO CIRCUMSTANCES OF SINKING OF THE TUG:

We had interrogated the master and engine driver of the ill-fated tug "KB-I" Reg. No. PY-367 (Bedi Port Reg. No. B.P. 1137) the summarised versions of these statements are as under:

1. STATEMENT OF SHRI MUSARAF GAZI, MASTER OF TUG "KB-I"

He is of age: about 35 and resident of Bihar, state under oath as under:

Since last 15 ~ 20 years he is attached with the shipping trade. He worked on different barges and tugs. For last some duration, he was working on tug "KB-I" as Master.

The tug "KB-I" was being operated at Cuddore Site and was operating properly. There was no problem with the tug. On 15.12.2007, the tug was assisting dredging operation being carried out at Cuddore harbour area and work was progressing without any problem as per routine. The condition was the tug was alright, and engine and other machineries of the tug were operating properly. After 11:00 Hours the weather started changing. Around 12:00 Hours they heard a noise of dashing of a floating object with the bottom of the tug. At that time weather condition was also bad and tug was rolling & pitching.

On listening noise they checked engine room & accommodation compartment and noticed ingress of water in the compartments. They immediately initiated the pumps and to avoid sinking of the tug in deep water he turned the tug towards shore. They continued their efforts; however, seawater level within tug compartments was continuously rising. They continued pumping of water. They also attempted to search the hole in tug-bottom, however, as same was covered within structure; they were unable to search & plug it. At that time due to wind & swell tug was also rolling & pitching.

Due to our continuous efforts, we succeeded in reaching shallow water along the shore-line. During that duration due to rise in water level in engine room & accommodation, engine stopped and the tug grounded. Thereafter, the tug slowly started slanting on its side. Understanding the situation, master along-with his crew members boarded off the tug and reached to the shore and informed their office regarding the incident. Thereafter, they worked as per instruction of their office.

My above statement is true and delivered without any kind of pressure.

- Master's above statement, as recorded before us is attached herewith as ANNEXURE-XVI.

2. STATEMENT OF SHRI S. K. GULAM HABIB, ENGINE DRIVER OF TUG "KB-I"

His Certificate of Competency No. is 6665, state under oath as under:

Since last 10 ~ 12 years he is attached with the shipping trade. He worked on different barges and tugs. For last some duration, he was working on tug "KB-I" as Engine Driver.

The tug "KB-I" was being operated at Cuddlore Site and was operating properly. There was no problem with the tug.

After 11:00 Hours on 15.12.2007, the weather started changing. The tug was at Cuddlore Harbour area. Around 12:00 Hours they heard a noise of dashing of a floating hard object with the bottom of the tug. At that time weather condition was also bad and tug was rolling & pitching.

On checking engine room & accommodation compartment and he noticed ingress of water in the compartments. He immediately informed the master and as per master's instruction he kept engine and pumps working.

In order to save the tug master turned the tug towards shallow shore line. During that duration seawater ingress in engine room and accommodation compartments continued.

The vigorous attempts were on. Around 12:30 ours, engine of the tug stopped due to submerging in water and tug started grounding near the shore. Thereafter, tug slowly started slanting towards it side. As per instruction of master, he along-with crew members off-boarded the tug and reached to shore.

Thereafter, he worked as per instruction of the master of the tug.

My above statement is true and delivered without any kind of pressure.

- Engine Driver's above statement, as recorded before us is attached herewith as ANNEXURE-XVIII.

IX. VERIFICATION OF DOCUMENTS:

At the time of our attendance, Insured had shown us documents pertaining to tug "KB-I". We had verified the same and retain photocopies of the same. The documents are enumerated item-wise with comments - where necessary, as under:-

1. CERTIFICATE OF REGISTRY:

On scrutiny of same, we noted that the tug is registered as Motor Tug with Registrar of Shipping, Mercantile Marine Department, Jamnagar District, Jamnagar on 04.06.1999, under Act XIX of 1838. The tug was built at Rozi Port in the year 1999. - A Photostat copy of the same is attached herewith as ANNEXURE-XIX.

2. HARBOUR CRAFT LICENCE:

Harbour Craft Licence, issued by Director, Port Department, Pondicherry. The licence is renewed upto 31.12.2007. - A Photostat copy of the same is attached herewith as ANNEXURE-XX.

X. CAUSE OF LOSS / DAMAGE:

On our investigation / survey and scrutiny / verification of documents as narrated above, we opine that probable cause of sinking of the tug could be due to ingress of sea-water due to hole as a result of dashing of tug with some hard object floating at the construction site, whilst the tug was under operation.

XI. VALUATION & ADEQUACY OF SUM INSURED:

As per our inspection / valuation report No.: ADM/JAM/INS_001 dated 04.01.2007, gross market value of the tug on date of our inspection was worked out to be at Rs. 25,00,000.00 and same is considered as fair & reasonable looking to the market conditions / trends on date of loss. Therefore, insured's tug was considered as adequately covered.

XII. ASSESSMENT OF LOSS:

A. SUE & LABOUR CHARGES:

We have supervised the salvage operation as narrated above, however, same did not succeed and work was awarded on 'NO CURE NO PAY BASIS' and as such no sue & labour charges are payable.

B. ASSESSMENT ON TOTAL LOSS BASIS:

As the cost of salvaging and consequent repairing the tug, as narrated elsewhere in this report, are considered more than sum insured under the policy, the loss is considered on total loss basis - (less) salvage value of the sunken tug in AS IS WHERE IS BASIS' condition, as under:-

Market value of the tug 'KB-I' ... Rs. 25,00,000.00 Add: Sue & Labour Charges (As narrated under sub-heading 'A' under same heading) NIL Rs. 25,00,000.00 Less: Salvage value of the sunken tug in 'AS IS WHERE IS BASIS' condition as per sale purchase agreement attached to this report ... Rs. 1,65,000.00 ∴ GROSS ASSESSED LOSS ... Rs. 23,35,000.00 Less: Deductible excess as per policy terms & conditions √Rs. 37,500.00 ∴ NET ASSESSED LOSS Rs. 22,97,500.00

XIII. POLICY CONDITIONS/WARRANTIES:

Policy conditions observed complied with.

No apparent breach of warranties observed.

XIV. INSURER'S LIABILITY:

Insured's claim is allowable & payable, as above as the loss & damage to the tug has occurred due to sea perils and same is covered under relevant policy of insurance.

XV. PHOTOGRAPHS:

4 Sets of coloured photographs taken by us during our attendance on various dates, are attached herewith.

Issued Without Prejudice subject to terms, condition & amount of policy of insurance, reserving the right to alter / amend any unintentional error / omission, if any.

On submission of the said Report of the Surveyor, the claim was rejected on 04.02.2011 by the Appellant/Insurance Company and aggrieved Complaint Case No. 21/2012 was filed before the State Commission claiming indemnification. The repudiation letter is extracted hereunder:

THE ORIENTAL INSURANCE COMPANY LIMITED DIVISIONAL OFFICE, "SWAGAT", PANDIT NEHRU MARG, 3RD FLOOR, JAMNAGAR-361008. Phone No : 2676606; 2550367. FAX NO. 2675333

Date: 04/02/2011

WITHOUT PREJUDICE

By Regd AD

To, M/S Vijaykumar K Sanghvi & Others K B Shipping & Company 11-Bardanwala Road, Grain Market Jamnagar - 361001

Dear Sir,

Re : Marine Hull Claim Claim No : 143700/22/2008/003 Policy No : 143700/22/POL/2007/MIG/90016 Vessel : MOTOR TUG - KB (I) PY-367

With reference to the above claim, the competent authority has repudiated the claim on the following grounds, based on the findings of investigation report:

1.

The tug was plying at Cuddalore Port without any statutory permissions.

2.

The Master was not having requisite License to operate Inland Mechanically propelled vessels on the date of casualty.

3.

The Tug on the date and time of casualty was not within the Geographical Limits of Karaikal Port.

We regret for inconvenience caused to you if any.

Yours faithfully, Sr Divisional Manager.

The Appellant/Insurance Company observed that there was no statutory permission for plying at Cuddalore Port nor did its Master have the requisite licence to operate Inland Mechanically Propelled Vessel on the date of the casualty. The tug was not within the geographical limits of Karaikal Port.

Mr. Gola has urged that all these grounds are sustainable, inasmuch as on the date of the incident the tug was not within the geographical limits of Karaikal Port. This was a condition attached to the policy and the vessel was subject to the operational limits. He then urges that no statutory permissions existed as per the Tamil Nadu Minor Ports Harbour Craft Rules 1953 read with the Pondicherry Port Harbour Craft Rules, 1970. The third contention is that the name of the Captain of the vessel in the licence/permission was mentioned as Mr. Gazi whereas the vessel was actually being plied by Mr. Abdul Shaikh as Master of the vessel. Mr. Abdul Shaikh did not have the requisite licence to operate the vessel and that the Certificate dated 29.09.2008 of Mr. Gazi was inadequate as he had only 4 years of experience. Otherwise also, the said Certificate is dated 29.09.2008 that was obtained after almost 9 months of the incident and therefore would not be applicable. Apart from this, on the said date also Mr. Gazi had only 4 years of experience whereas Rule 32 of the Rules applicable categorically requires that the applicant for a Certificate of Competency should have served for 5 years in a vessel propelled by engines similar to those of such vessels in respect of which the certificate is required. Mr. Gola has referred to Rule 32(b) of the said Rules to urge that the Certificate of Competency of Mr. Gazi dated 29.09.2008 only refers to 4 years of experience and therefore the Certificate by itself proves the incompetence of the Master of the Vessel. Nonetheless, it is not proved that it was Mr. Gazi who was piloting the vessel as Master and in fact it was Mr. Shaikh who has no licence. Even assuming that Mr. Gazi was the Master, he was unqualified and his certificate was of no consequence as explained above.

We have also perused the written submissions that have been filed on behalf of the Respondent/Complainant and we find that all the three grounds of repudiation are clearly established on record. The vessel was operating outside the territorial limits of Karaikal which is a pre-condition for the purpose of coverage under the policy. It is also evident that requisite orders from the competent authority do not seem to be available and the vessel was being manned by Mr. Shaikh who was not possessed of the requisite qualified experience of 5 years. The Certificate dated 29.09.2008 that was relied on which is after almost 9 months of the incident did not suffice as the experience of Mr. Gazi on that date was only 4 years. The name of the Master of the vessel in the licence/permission was that of Mr. Gazi but an altogether different person Mr. Shaikh had been negotiating the vessel who was not possessed of the qualification. The licence of Mr. Gazi in no way comes to the aid of the Respondent/Complainant and consequently the findings recorded by the State Commission cannot be sustained.

We therefore find that the repudiation by the Appellant/Insurance Company rests on valid grounds as the material policy conditions have been breached.

On the other hand, the State Commission has proceeded to record findings that does not conform to the records. In the instant case, the Certificates of Exit and Entry coupled with the Work Order that was issued to the Respondent/Complainant indicate that the work had commenced by the Respondent/Complainant and therefore the finding to that effect is perverse. The finding recorded that the work had never commenced is incorrect because the tug had arrived for the said work. While recording the fact with regard to the name of the Master of the vessel, the name of Mr. Gazi had been mentioned who was not mastering the vessel and his Certificate was also for 4 years and 5 months.

The State Commission has further examined the matter in the light of the provisions of Inland Vessels Act, 1917. We may point out that even though the letter of repudiation does not mention anything about the engine power of the vessel, yet the proposal form mentions that the vessel was powered with a 195 BHP engine. This has completely escaped the notice of the State Commission while relying on the said Rule which is applicable to less than 100 nominal horse-power vessels. Given the power of the engine of the present vessel, the provisions of the said Act were not at all attracted, yet the same has been made the basis to record a finding and as such cannot be sustained. Consequently, the order passed by the State Commission dated 24.09.2021 cannot be sustained.

Accordingly, the impugned order is set aside and the Appeal is allowed. The Complaint stands dismissed.