High CourtsSingle Bench(2026) 09 DEL CK 7981

National Highways Authority Of India vs M/S Sangam (India) Ltd

Delhi High Court · Decided on 14 September 2026

HON’BLE JUDGES
Om Prakash Shukla, J
CASE NUMBER
O.M.P. 463/2015
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Judgment

137 paragraphs · 8,612 words
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

The case is being listed today as 11.09.2026 was declared a Holiday vide Notification No. 86/G-4/Genl.-I/DHC dated 08.09.2026.

1.

The present petition has been filed under Section 34 of the Arbitration and Conciliation Act, 19961, challenging the Arbitral Award dated 03.05.20152 passed by the learned Sole Arbitrator, Shri D.R. Meena, in Arbitration Case No.1 of 2013.

2.

The impugned award arose out of disputes concerning the contract for collection of user fee at the Usaka/Chamari Toll Plaza at Km3 229.913 covering specified stretches of National Highway Nos. 25 and 2 in the State of Uttar Pradesh.

3.

Aggrieved by the termination of the contract and blacklisting for two years, the Respondent invoked arbitration in terms of Clause 27 of the said contract alleging misrepresentation/fraud and breaches committed by the Petitioner.

4.

By the impugned award, the learned Arbitrator substantially accepted the case of the Respondent and directed restitution of certain amounts with interest. It was inter alia held as follows:

(i)

The contract was void for uncertainty. The contract was voidable on account of misrepresentation and conscious omission attributable to the Petitioner. The Petitioner had committed breach of its statutory duty and of the contract in relation to the condition of the highway and the incomplete Kalpi stretch;

(ii)

The termination and debarment orders issued by the Petitioner were arbitrary;

(iii)

The forfeiture and appropriation of the performance security and bank guarantee amounting to Rs. 10.35 crores was illegal. Accordingly, the Petitioner was directed to refund Rs. 10.35 crores with simple interest @ 14.55% p.a. from 24.10.2013 till such refund.

(iv)

Petitioner was also directed to pay Rs. 332.05 lakhs towards excess payment received over and above the actual toll collection with simple interest @ 14.55% p.a. from 24.10.2013 till such refund.

5.

The relevant background may be noticed in some detail hereinafter.

FACTUAL BACKGROUND

6.

The Petitioner is a statutory authority constituted under the National Highways Authority of India Act, 1988. Amongst its statutory functions are the development, maintenance and management of national highways entrusted to it. The Respondent is a company duly incorporated under the laws of India.

7.

The dispute between the parties arises from a tender process initiated by the Petitioner on 18.10.2012 for collection of toll/user fee at the toll plaza situated at Km 229.913 near Usaka, District Jalaun, Uttar Pradesh for two years. The notified stretches comprised Km 220.000 to Km 260.713 on NH-25 and Km 421.200 to Km 449.000 on NH-2, aggregating approximately 68.513 Km. The Annual Potential Collection4 was declared as Rs. 47.09 crores.

8.

The Respondent participated in the tender process and submitted a financial bid of Rs. 62.10 crores.

9.

The Respondent’s bid was accepted by the Petitioner and a Letter of Acceptance5 was issued on 22.01.2013. Pursuant thereto, the Respondent furnished a bank guarantee of Rs. 5,17,50,000/- on 07.02.2013 and deposited a further sum of Rs. 5,17,50,000/- towards performance security on 13.02.2013. As per the record, the formal contract was thereafter executed on 07.03.2013 for a period of two years commencing from 09.03.2013.

10.

Out of the total 68.513 Km, the 1.7 Km stretch at Kalpi is central to the dispute.

11.

On 26.02.2013, before execution of the formal contract, the Central Government issued Notification No. SO.465(E) dated 26.02.20136, whereby a fee was levied for use of the four lanes and the Petitioner was authorised to collect this fee as per the rates mentioned therein. The Notification contemplated two different lengths for which user fee was payable at the toll plaza; before completion of the stretch at Kalpi, the Petitioner was authorised to collect fee for the notified length of 66.813 Km, whereas after completion of that stretch, the notified length was 68.513 Km. This Notification permitted the Petitioner to reduce the weekly remittance, for deposit on pro-rata basis due to this incomplete stretch. The said Notification was incorporated into Clause 3 of the contract.

12.

The Respondent began collecting toll on 09.03.2013. Thereafter, by letter dated 16.04.2013, the Respondent requested the Petitioner to complete the work at Kalpi and exclude this period from the contract. Vide its response dated 20.05.2013, the Petitioner directed the Respondent to calculate remittance for 66.813 Km on pro-rata basis.

13.

Purportedly, the Respondent failed to remit the stipulated amount to the Petitioner.

14.

Accordingly, on 09.07.2013, the Petitioner issued a termination notice and blacklisted the Respondent, debarring it from participating in future projects for two years. The Petitioner also forfeited the bank guarantee and performance security. It is also made out from the record that the toll plaza was handed over to the Petitioner on 27.10.2013.

15.

Aggrieved, the Respondent invoked arbitration in 2013. The learned Arbitrator entered upon the reference on 17.07.2013. Around the same period, the Petitioner initiated action on account of alleged defaults in remittance and issued a Show Cause Notice dated 09.07.2013. It is the case of the Petitioner that no satisfactory reply was received.

16.

Before the learned Arbitrator, the Respondent primarily sought a declaration that the contract was null and void on the ground that the Petitioner had failed to provide the complete 68.513 Km stretch. The Respondent also claimed damages, refund of amounts allegedly paid in excess of actual toll collections, expenditure incurred in relation to the toll plaza, loss of profits, interest and other reliefs.

17.

The learned Arbitrator framed ten issues, including inter alia, whether the Petitioner had committed breach, whether the contract was voidable or void, whether the termination and debarment orders were valid, whether the forfeiture of the performance security was justified, whether the Respondent was entitled to refund and damages, and whether the Petitioner’s counterclaims were sustainable.

18.

Before the learned Arbitrator, the Respondent maintained that the LOA, in terms of which it was directed by the Petitioner to deposit Rs. 10.35 crores, explicitly mentioned the entire section of 68.513 Km. It was argued that the performance bank guarantee and security were also deposited under the impression that entire stretch is available. Only by the Notification dated 26.02.2013, it was indicated for the first time that a reduced stretch of 66.813 Km was available and therefore the contract was void ab initio. It was also argued that the contract was void for mistake of fact.

19.

The Respondent particularly relied upon an internal memo of the Petitioner organisation dated 21.01.2013 and contended that the Petitioner was internally aware that the Kalpi stretch was unlikely to be completed in the near future. It was argued that this internal knowledge was not disclosed before the Respondent committed itself to the financial bid and, therefore, the contract was void for uncertainty. The Respondent also asserted fraud, misrepresentation, concealment and inducement by suppression of material facts.

20.

The Respondent further placed reliance upon the statutory functions of the Petitioner and contended that the Petitioner was under an obligation to provide a properly maintained and motorable highway and that the right to collect user fee/toll was dependent upon the provision of corresponding highway services and that this statutory duty of the Petitioner could not be diluted by contractual conditions.

21.

After considering the material, the learned Arbitrator substantially accepted the Respondent’s case. The learned Arbitrator concluded that the contract was voidable on account of misrepresentations and conscious omissions on the part of the Petitioner. The learned Arbitrator further concluded that the contract was void for uncertainty. The learned Arbitrator held that the Petitioner had failed in its obligation relating to the handing over of the entire stretch of the highway and that the circumstances surrounding the incomplete stretch and traffic conditions rendered the Respondent’s toll collection activity substantially unviable.

22.

These findings were largely based upon the circumstances surrounding the incomplete Kalpi stretch, the alleged internal knowledge of the Petitioner, the condition of the highway and the resulting inability of the Respondent to achieve the anticipated toll collection. Accordingly, the learned Arbitrator held the termination and debarment orders to be arbitrary, quashed the Petitioner’s letter dated 24.10.2013 and the debarment order dated 30.10.2013, and declared the forfeiture and appropriation of the performance security and bank guarantee of Rs. 10.35 crores to be illegal.

23.

In relation to the monetary claims, the learned Arbitrator dealt separately with the Respondent’s claim of Rs. 7,24,66,000/-, which included a claim of Rs. 332.05 lakhs said to represent excess payments over actual toll collections and another component of Rs. 392.61 lakhs said to represent expenditure incurred in respect of toll plaza. The learned Arbitrator accepted the claim for restitution of Rs. 332.05 lakhs reasoning that once a contract is held to be void, the consequences in law shall follow. The claims for expenditure component were rejected for want of adequate corroboration. Further, the claim for loss of profits came to be rejected due to lack of evidence.

24.

The learned Arbitrator ultimately directed payment of interest at the rate of 14.55% per annum on Rs. 10.35 crores from 24.10.2013 until refund and similarly awarded interest upon the amount treated as excess remittance. It was further directed that if payment was not made within the prescribed period, interest would stand enhanced.

25.

Aggrieved thereby, the Petitioner assails the impugned award by way of the present petition.

SUBMISSIONS BY BOTH PARTIES

26.

Mr. Nishant Awana, learned Counsel for the Petitioner, submitted that once the Notification itself expressly recognised the incomplete Kalpi stretch and prescribed a reduced toll-able length of 66.813 Km pending completion, the Respondent could not reasonably contend that the existence of that stretch was concealed from it in a manner that rendered the contract void or voidable.

27.

Mr. Awana submitted that the finding of the learned Tribunal regarding misrepresentation and conscious omission by the Petitioner was erroneous in view of Section 19 of the Indian Contract Act, 18727 and Clause 9 of the contract between the parties. As per Clause 9(a), the Respondent was contractually obligated to survey the highway before submitting its bid. Further, Clauses 1.1.1 and 2.3 of the Request for Proposal8 provided that the Respondent ought to visit the site and conduct a survey and carry out its own assessment of the toll amount. Learned Counsel emphasised that the APC was merely an estimate and the RFP clarified that the Petitioner did not guarantee the extent of toll collected.

28.

It was further averred that a mere drive down the Kalpi stretch would have revealed that it was not complete and was likely to take some time. According to Mr. Awana, it is also evident from the spot visit by the learned Arbitrator that there was no active concealment and that the issue relating to the Kalpi stretch was public knowledge. Therefore, it was submitted that there was no active concealment by the Petitioner and that the Respondent ought to have acted prudently.

29.

It was contended that the Respondent was already aware about the Kalpi stretch when the Notification was issued on 26.02.2013 and could have refrained from proceeding with the contract, however, it chose to execute the contract on 07.03.2013.

30.

Mr. Awana submitted that the Respondent submitted its bid at Rs. 62.1 crores, which is approximately 31.88% above the APC and the second highest bid was for Rs. 50.04 crores, which is only 7.03% above the APC. Therefore, it was contended that the Respondent having overshot the bid on its own accord, is now seeking to benefit from its own wrong.

31.

Mr. Awana vehemently submitted that after issuance of the Notification dated 26.02.2013, and recognizing that the Kalpi stretch remained incomplete, the Petitioner permitted the Respondent to remit the amount on pro-rata basis corresponding to 66.813 Km rather than the full 68.513 Km and therefore, the weekly amount was thereby reduced to Rs. 1,16,14,079/- instead of Rs. 1,19,09,589/-. Pertinently, this submission is not disputed by learned Counsel for the Respondent. It was therefore submitted that the Respondent was not compelled to remit an amount calculated for the full stretch while only 66.813 Km were presently toll-able. The arbitral record itself notes the distinction between the two lengths specified in the Notification.

32.

It was further contended that the learned Arbitrator failed to appreciate Recital H and Clause 3 of the Contract Agreement, by which the Respondent was obligated to make payment of weekly remittance of Rs. 1.19 crores per week irrespective of the actual toll collection. However, learned Counsel submitted that it is an admitted case that the Respondent remitted short weekly payments and never paid the entirety of the said amount.

33.

Mr. Awana further argued that the learned Arbitrator adjudicated on issues beyond the scope of arbitration. Clause 19 of the Contract Agreement explicitly provided that in case the requisite weekly fee was not remitted to the Petitioner by the Respondent, in addition to termination of the contract, the Petitioner would be entitled to penalty stipulated therein and that such penalty could be recovered from the performance bank guarantee. Learned Counsel further submitted that by virtue of Clause 26, the said aspect of penalty under Clause 19 was not arbitrable. Therefore, according to Mr. Awana, the impugned award is liable to be set aside due to overreach and clear misinterpretation of the contractual terms.

34.

Per contra, Ms. Ruchira Gupta, learned Counsel appearing for the Respondent, supported the reasoning adopted by the learned Arbitrator and submitted that the Notification did not cure the Petitioner’s concealment because the issue was not merely the existence of an incomplete stretch but the Petitioner’s prior internal knowledge that completion would not take place within currency of the Respondent’s contract period. It was further urged that such internal information could not have been discovered merely through a site inspection and that the survey could not have revealed that the Petitioner had no intention of completing the Kalpi stretch or the lack of maintenance of the completed stretches. It was thus submitted that these were important facts that ought to have been disclosed in the tender documents to enable the bidders to make an informed decision.

35.

Ms. Gupta submitted that the conditions of the highway such as the bridge closure, diversions and traffic disruptions were such that they went beyond ordinary commercial risk and hence, the expected traffic and toll collections could not materialise. It was further contended that the Petitioner having special knowledge of its own construction programme and administrative difficulties, was obliged to disclose the same.

36.

It was asserted that the RFP dated 18.10.2012 and the LOA dated 22.01.2013 categorically pertained to the entire stretch and in fact, the internal memo dated 21.01.2013, i.e., one day prior to the LOA recorded that the Kalpi stretch will not be completed. Therefore, it was submitted that the Petitioner was well aware that the Kalpi stretch would not be completed when it entered into the contract.

37.

Ms. Gupta submitted that the Respondent conducted its survey and submitted its bid under the impression that the Kalpi stretch would eventually be made available during the pendency of their contract. It was further submitted that the bank guarantee and performance security were also for the entire stretch and that even after the Notification, the Contract was issued for the entire stretch. It was therefore submitted that the learned Arbitrator correctly observed that the Petitioner throughout its documents demonstrated that the entire stretch of 68.513 Km was toll-able. It was submitted that Clause 9(a) of the contract dated 07.03.2013 did not come into play since the pre-bid survey was conducted on or before 20.11.2012 i.e., the date of submission of bid, which is much prior to the contract.

38.

Ms. Gupta submitted that the exception to Section 19 was not pleaded by the Petitioner before the learned Arbitrator or before this Court in its petition. In any case, it is well settled that exception to Section 19 of ICA is not applicable to cases of active concealment and fraudulent misrepresentation. Reliance was placed on Avitel Post Studioz Ltd. and Ors. v. HSBC PI Holdings (Mauritius) Ltd.9 and John Minas Apcar v. Louis Caird Malchus10. It was submitted that in any event there is no error in the impugned award going to the root of the matter to warrant inference by this Court under Section 34 of the Act. Ms. Gupta submitted that it is trite that mere erroneous application of law is not a ground to set aside an arbitral award11.

39.

In rebuttal, Mr. Awana contended that the reliance placed on Avitel Post Studioz Ltd. (supra) and John Minas Apcar (supra) by the Respondents was of no avail since these decisions were distinguishable on facts. In these decisions, the party proposing the contract was obligated to disclose correct information at the first instance and the other party had no means of knowing such information by ordinary diligence, which is not the present case herein, in view of specific provisions of Clause 9(a) of the contract read along with Clauses 1.1.1 and 2.3 of the RFP.

ANALYSIS AND REASONING

40.

The jurisdiction of this Court under Section 34 must necessarily be kept in view. This Court does not sit as a court of appeal over the decision of an Arbitral Tribunal and cannot ordinarily reappreciate evidence merely because another view may be possible. At the same time, an arbitral award cannot be sustained if the Tribunal has ignored contractual provisions which constitute the foundation of the parties’ rights and obligations, or has arrived at a conclusion contrary to the express terms of the contract, or has proceeded upon a legal basis which is fundamentally inconsistent with the governing agreement. The Court is, therefore, required to examine whether the findings which form the basis of the impugned relief are legally sustainable within the limited supervisory jurisdiction under Section 34.

41.

The present dispute pertains to the pre-2015 Amendment regime, whereby though “patent illegality” was not an explicit ground under Section 34 of the Act, it was however read into the said provision by various judicial decisions. In this light, the Supreme Court in ONGC Ltd. v. Saw Pipes Ltd.12, held as follows:

“31.

Therefore, in our view, the phrase “public policy of India” used in Section 34 in context is required to be given a wider meaning. It can be stated that the concept of public policy connotes some matter which concerns public good and the public interest. What is for public good or in public interest or what would be injurious or harmful to the public good or public interest has varied from time to time. However, the award which is, on the face of it, patently in violation of statutory provisions cannot be said to be in public interest. Such award/judgment/decision is likely to adversely affect the administration of justice. Hence, in our view in addition to narrower meaning given to the term “public policy” in Renusagar case [1994 Supp (1) SCC 644] it is required to be held that the award could be set aside if it is patently illegal. The result would be — award could be set aside if it is contrary to:

(a)

fundamental policy of Indian law; or

(b)

the interest of India; or

(c)

justice or morality, or

(d)

in addition, if it is patently illegal.

Illegality must go to the root of the matter and if the illegality is of trivial nature it cannot be held that award is against the public policy. Award could also be set aside if it is so unfair and unreasonable that it shocks the conscience of the court. Such award is opposed to public policy and is required to be adjudged void.” (emphasis supplied)

42.

Therefore, it was held that the ground of “public policy of India” under Section 34 could be invoked to set aside arbitral awards which were, on the face of it, inconsistent with statutory provisions or “patently illegal”. It was cautioned that such patent illegality must go to the root of the matter and not be of trivial nature.

43.

Having traced the settled law and established the parameters within which this Court can exercise its jurisdiction under Section 34 of the Act, this Court shall now proceed to examine the merits of the case.

44.

In the considered opinion of this Court, the bone of contention is whether the Petitioner fraudulently or by misrepresentation induced the Respondent to enter into the contract dated 07.03.2013.

45.

The ICA defines “fraud” as follows:

“17.

“Fraud” defined.—“Fraud” means and includes any of the following acts committed by a party to a contract, or with his connivance, or by his agent, with intent to deceive another party thereto or his agent, or to induce him to enter into the contract—

(1)

the suggestion, as a fact, of that which is not true, by one who does not believe it to be true;

(2)

the active concealment of a fact by one having knowledge or belief of the fact;

(3)

a promise made without any intention of performing it;

(4)

any other act fitted to deceive;

(5)

any such act or omission as the law specially declares to be fraudulent.

Explanation.— Mere silence as to facts likely to affect the willingness of a person to enter into a contract is not fraud, unless the circumstances of the case are such that, regard being had to them, it is the duty of the person keeping silence to speak, or unless his silence is, in itself, equivalent to speech.”

46.

Therefore, actively concealing a fact which one believes or knows to be true in order to induce a person to enter into a contact amounts to fraud.

47.

The Supreme Court has held that in cases of active concealment, the explanation to Section 19 of ICA does not apply13. When fraudulent misrepresentation pertains to contents of a document, it is voidable14. On the other hand, it has also been clarified that the supply of inferior quality of product or short supply would amount to breach of contract and not fraud15.

48.

It is well settled that fraud must be pleaded and proved. It is equally settled that the level of proof is significantly high. The Supreme Court in Naresh Kumar Sinha v. State of Bihar16 held as follows:

“20.

In the case of Derry v. Peek, [1889] 14 A.C. 337, as well, the House of Lords observed that in case of fraud, actual fraud on part of person must be proved. It will be said to be proved when it is shown that any false representation has been made knowingly, or without belief in its truth, or recklessly, without caring about its truthfulness or falsity. In this regard, any false statement made carelessly and without reasonable ground for believing it to be true may be evidence of fraud. However, it does not mean that it would necessarily amount to fraud. Any statement made with honest belief in its truthfulness is not fraudulent and would not render the person liable for a fraudulent act.” (emphasis supplied)

49.

A Division Bench of this Court in Kohli Housing & Development (P) Ltd. v. Convenience Enterprises (P) Ltd.17, held as follows:

“9.

…It is trite to say that an allegation of fraud must be clear, definite and specific and general allegations unaccompanied by particulars are insufficient to amount to an averment of which judicial notice can be taken. We draw strength from the observations made by the Supreme Court in A.C. Ananthswamy v. Boraiah; (2004) 8 SCC 588 where in para 5, it was observed as under:

“To prove fraud, it must be proved that representation made was false to the knowledge of the party making such representation or that the party could have no reasonable belief that it was true. The level of proof required in such cases is extremely higher. An ambiguous statement cannot per se make the representor guilty of fraud. To prove a case of fraud, it must be proved that the representation made was false to the knowledge of the party making such representation. (See Pollock & Mulla: Indian Contract and Specific relief Acts (2001), 12th Edn., p.489)…” (emphasis supplied)

50.

In Mithoolal Nayak (supra), the Supreme Court held as follows:

“We may here dispose of the third question. Learned counsel for the appellant has argued before us that Mahajan Deolal was examined under the direction of the respondent company by as many as four doctors, namely, Dr. Desai, Dr. Kapadia, Dr. Belapurkar and Dr. Clarke. It is further pointed out that Mahajan Deolal had correctly disclosed that he had suffered previously from malaria, pneumonia and cholera. Dr. Kapadia, it is pointed out, was specifically asked to examine Mahajan Deolal in view of the conflicting reports which Dr. Desai had earlier submitted. On these facts, the argument has been that the respondent company had full knowledge of all facts relevant to the state of health of Mahajan Deolal and having knowledge of the full facts, it was not open to the respondent company to call the policy in question on the basis of the answers given by Mahajan Deolal in the proposal form and the personal statement, even though those answers were inaccurate. Learned counsel for the appellant has referred us to the Explanation to section 19 of the Indian Contract Act in support of his argument. We are unable to accept this argument as correct. It is indeed true that Mahajan Deolal was examined by as many as four doctors. It is also true that the respondent company had before it the conflicting reports of Dr. Desai and it specially asked Dr. Kapadia to examine Mahajan Deolal in view of the reports submitted by Dr. Desai. Yet, it must be pointed out that the respondent company had no means of knowing that Mahajan Deolal had been treated for the serious ailment of secondary anaemia followed by dilatation of heart, etc., in September-October, 1943, by Dr. Lakshmanan. Nor can it be said that if the respondent company had knowledge of those facts, they would not have made any difference. The principle underlying the explanation to section 19 of the Contract Act is that a false representation, whether fraudulent or innocent, is irrelevant if it has not induced the party to whom it is made to act upon it by entering into a contract. We do not think that principle applies in the present case. The terms of the policy make it clear that the averments made as to the state of health of the insured in the proposal form and the personal statement were the basis of the contract between the parties, and the circumstance that Mahajan Deolal had taken pains to falsify or conceal that he had been treated for a serious ailment by Dr. Lakshmanan only a few months before the policy was taken shows that the falsification or concealment had an important bearing in obtaining the other party's consent. A man who has so acted cannot afterwards turn round and say: “It could have made no difference if you had known the truth.” In our opinion, no question of waiver arises in the circumstances of this case, nor can the appellant take advantage of the Explanation to section 19 of the Indian Contract Act.” (emphasis supplied)

51.

Therefore, with respect to concealment, it is borne from the aforesaid excerpt that (i) the fact so concealed must pertain to a material matter (basis of the contract), (ii) there must be deliberate concealment of such fact (iii) the person concealing must have the knowledge/belief of falsity of such fact (iv) such falsification or concealment must have bearing on the other party’s consent.

52.

The ICA defines “misrepresentation” as follows:

“18.

“Misrepresentation” defined.—“Misrepresentation” means and includes—

(1)the positive assertion, in a manner not warranted by the information of the person making it, of that which is not true, though he believes it to be true;

(2)

any breach of duty which, without an intent to deceive, gains an advantage to the person committing it, or any one claiming under him, by misleading another to his prejudice, or to the prejudice of any one claiming under him;

(3)

causing, however innocently, a party to an agreement, to make a mistake as to the substance of the thing which is the subject of the agreement.”

53.

In Rengali Hydro Electric Project v. Giridhari Sahu18, the Supreme Court further delineated the nuances of Section 17 and distinguished it from misrepresentation in the following words:

“43.

A perusal of the definition of the word “fraud”, as defined in Section 17 of the Contract Act, would reveal that the concept of fraud is very wide. It includes any suggestion, as a fact, of that which is not true, by a person who does or does not believe it to be true. It may be contrasted with Section 18(1) of the Contract Act which, inter alia, defines “misrepresentation”. It provides that it is misrepresentation if a positive assertion is made by a person of that which is not true in a manner which is not warranted by the information which he has. This is despite the fact that he may believe it to be true. In other words, in fraud, the person who makes an untruthful suggestion, does not himself believe it to be true. He knows it to be not true, yet he makes a suggestion of the fact as if it were true. In misrepresentation, on the other hand, the person making misrepresentation believes it to be true. But the law declares it to be misrepresentation on the basis of information which he had and what he believed to be true was not true. Therefore, the representation made by him becomes a misrepresentation as it is a statement which is found to be untrue. Fraud is committed if a person actively conceals a fact, who either knows about the fact or believes in the existence of the fact. The concealment must be active. It is here that mere silence has been explained in the Exception which would affect the decision of a person who enters into a contract to be not fraud unless the circumstances are such that it becomes his duty to speak. His silence itself may amount to speech. A person may make a promise without having any intention to perform it. It is fraud. The law further declares that any other act fitted to deceive, is fraud. So also, any act or omission, which the law declares to be fraudulent, amounts to fraud. Running as a golden trend however and as a requirement of law through the various limbs of Section 17 of the Contract Act, is the element of deceit. A person who stands accused of fraud be it in a civil or criminal action, must entertain an intention to commit deception. Deception can embrace various forms and it is a matter to be judged on the facts of each case. It is, apparently, on account of these serious circumstances that fraud has on a legal relationship or a purported legal relationship that the particulars and details of fraud are required if pleaded in a civil suit or a proceeding to which the CPC applies.” (emphasis supplied)

54.

Therefore, in cases of misrepresentation, the person making such misrepresentation believes the information to be true under Section 18(1) of ICA. On the other hand, deliberate concealment of a fact, knowing or believing its existence, amounts to fraud under Section 17(2) of ICA. It requires active concealment, that is to say, one must undertake steps to conceal. Therefore, it must be borne in mind that every omission will not automatically constitute active concealment.

55.

Accordingly, this dispute ought to be examined in the aforesaid light whilst bearing in mind that the ambit of this Court under Section 34 is circumscribed.

56.

At this stage, before adverting to the facts of the case, it is apposite to refer to the reasoning adopted by the learned Arbitrator.

57.

The learned Arbitrator held that the Respondent came to know about the Kalpi stretch only when the Notification was issued. It was therefore held that since the LOA was issued prior thereto and even the bank guarantee and performance security were deposited prior to the Notification, the Respondent proceeded on the basis of the fact that the entire section of 68.513 Km was available for collection of toll. The learned Arbitrator observed that the stretch at Kalpi had major obstacles and even conducted a spot visit on 21.07.2014 and found that the contentions of the Respondent regarding the disputes over this stretch were true.

58.

By relying on the National Highways Authority of India Act of 1988, the learned Arbitrator held that it was the duty of the Petitioner to ensure uninterrupted traffic flow and develop, maintain and repair the National Highways. It was reasoned that the power to collect toll-fee only arose when the “National Highway is complete in all respects”, otherwise user fee could not be levied. It was also reasoned that the Petitioner was under a statutory duty to act in a just, fair and transparent manner. The learned Arbitrator found that the Petitioner did not take any convincing steps to repair the Kalpi stretch which caused traffic jams for 16 to 18 hours a day. It was reasoned that the pre-bid survey was done on or before 20.11.2012 (i.e., when the bid was submitted), at a time where the Respondent had reasonable expectation that the stretch would be completed. However, the Petitioner informed the Respondent only on 16.04.2013 that the Kalpi stretch could not be completed.

59.

In my considered view, the reasoning adopted by the learned Arbitrator overlooks the terms of the RFP which are material in determining whether the circumstances relied upon by the Respondent amounted to misrepresentation or active concealment or instead fall within the commercial risks expressly undertaken by a contractor. Accordingly, the relevant provisions are as follows:

(i)

Clause 2.3 deals with site visit and verification of information. Clause 2.3.1 specifically provides that the bidders are encouraged to submit their bid after visiting the site and ascertaining for themselves the site conditions, traffic, locations, surroundings, climate, availability of power, applicable laws etc.

(ii)

Clause 2.3.2(c) stipulates that the bidders have accepted the risk of inadequacy, error, or mistake in the information provided in the bidding documents relating to any matters referred to in Clause 2.3.1.

(iii)

Clause 2.3.2(d) stipulates that the bidders are deemed to have satisfied themselves about matters concerning Clause 2.3.1 required for submitting an informed bid.

(iv)

Clause 2.3.2(e) provides that the bidders are deemed to have accepted that inter alia, inadequacy, lack of completeness, or incorrectness of the information provided in the bedding documents cannot be a basis for any claim for compensation, damages, loss of profits etc.

(v)

Clause 2.3.3 further clarifies that the Petitioner shall not be liable for any omissions, mistakes or errors in respect of any of the above matters arising out of the RFP.

(vi)

Clause 2.19 stipulated that the bidder should make an assessment of user-fee revenue actor and that the Petitioner did not guarantee the extent of revenue.

60.

Therefore, in essence, bidders were to conduct site visits, verify information about the site pertaining to inter alia the applicable laws, power supply, climate, traffic conditions. The bidders were deemed to have accepted the risk of error/mistakes in the information with respect to the matters mentioned therein and that the Petitioner was not responsible for the same. The Petitioner also did not guarantee the extent of revenue.

61.

Certain provisions of the contact executed between the parties herein are also material to the dispute. They are as follows:

(i)

Clause 3 stipulates the rate of user fee. This provision incorporates the Notification dated 26.02.2013.

(ii)

Clause 9 provided that the Contractor is to conduct survey of the site, its surrounding area including any access or diversions, and submit its bid after considering these factors. It further provides that the contractor undertakes that he shall not make any claim for decrease in traffic on the ground of diversion of traffic, even if such divergent did not exist at the time of submission of the bid.

(iii)

Clause 19 stipulated penalty @ 0.5% of the delayed amount per day for failure to pay weekly instalments by the contractor. The Petitioner is also entitled to terminate the contract without assigning any reasons and take possession of the toll plaza. It is stipulated that the penalty shall be recovered from the performance guarantee which shall be replenished by the contractor within 10 days from the date of such recovery, failing which the contract would be liable to be terminated.

(iv)

Clause 26 provides that disputes arising under Clauses 3, 7, 8, 14, 18 and 19 of the contract are not arbitrable. Instead, they shall be referred to the Petitioner’s Project Implementation Unit/Corridor Management Unit at Kanpur whose decision shall be final.

62.

Adverting to the present case, the first question is whether the contract was so uncertain that it was void. In my considered view, the answer must be in negative.

63.

The Notification issued by the Central Government is significant in this regard because it expressly contemplated the precise factual circumstance central to this dispute. It provided for toll collection for over 66.813 Km before completion of the Kalpi stretch and 68.513 Km thereafter.

64.

Notably, this Notification pre-dates the contract and was duly incorporated in Clause 3 of the said contract. Therefore, in my considered view, it cannot be said that the contract misled the Respondent to believe that the entire stretch was available. On the contrary, the Notification incorporated the incomplete stretch into the very framework governing the toll collection. Thus, the contractual terms were identified with sufficient precision. The toll plaza was identified, the highway stretches were identified, the contract period was specified, the weekly instalment mechanism was specified, and the Notification was also identified which stipulated the toll-able length before and after completion of the Kalpi stretch.

65.

There is therefore a distinction between uncertainty as to a future event, such as the exact date on which a construction activity might be completed, and uncertainty as to the essential terms of a concluded contract.

66.

Accordingly, the learned Arbitrator’s conclusion that the contract was void for uncertainty does not adequately address this aspect of the matter. The absence of a fixed date for completion of the Kalpi stretch may have been commercially relevant, but it did not leave the parties without a contractual mechanism for functioning during the interim period. The Notification provided an operative distinction between the two stages. The agreement consequently did not fail for want of an ascertainable subject matter or absence of an agreed mechanism.

67.

The second question concerns the finding of fraud, misrepresentation and concealment.

68.

In this regard, it is much relevant to note the oral submission made before this Court that the Respondent was aware of the Kalpi stretch, however, it was under the impression that the same would be made available to it during the currency of its contract. However, in the opinion of this Court, there is nothing in the tender or bidding documents or the contract to support this submission.

69.

It appears from a perusal of the record that the Respondent before the learned Arbitrator heavily relied upon the internal memo of the Petitioner organisation dated 21.01.2013 pertaining to the unlikely completion of the Kalpi stretch in near future. It is on the strength of this memo that the Respondent contends active concealment by the Petitioner.

70.

Even accepting at face value that the internal noting reflected an assessment by officers of the Petitioner that completion might take time; this, by itself, does not establish that a specific false representation was made to the Respondent, nor does it establish that a material fact known to the Petitioner was deliberately concealed so as to invalidate a negotiated commercial contract which expressly allocated site and traffic risks to the Contractor. There is nothing on record to show that the Petitioner actively undertook steps to conceal the issue of the Kalpi stretch. In fact, on the contrary, in the RFP, the Petitioner encouraged bidders to place their bids after inspecting the site and inspecting about issues such as site conditions, traffic, locations, surroundings, climate, availability of power, applicable laws etc. Significantly, the fact that the learned Arbitrator was able to ascertain the alleged problems at Kalpi upon spot enquires upon a single visit tilts the scale in favour of the Petitioner that there was no active concealment.

71.

This conclusion becomes stronger when the terms of the tender documents ands contractual provisions are read as a whole. At the cost of repetition, the explicit clauses of the RFP, particularly Clause 2.3.2, provides that the bidders are deemed to have accepted the risk of inadequacy, error or mistake in information in the bidding documents, satisfied itself regarding matters such as site conditions, traffic, climate, laws etc., and acknowledged that such an adequacy shall not be a basis for any claim for compensation or damages, etc. Clause 2.3.3 further provides that the Petitioner would not be liable for such omissions, mistakes or errors. Clause 2.19 explicitly provides that the Petitioner did not guarantee the extent of user fee revenue.

72.

Further, a distinction must be maintained between actual fraudulent inducement and failure to disclose every internal assessment, projection or administrative uncertainty within a large statutory organisation.

73.

Fraud must be clearly pleaded and proved. The standard of proof required is high. The representation made must be false and the party making the representation must have knowledge or belief of its falsity. In cases of concealment, such concealment must be deliberate. Such representation or concealment must have induced the other party to enter into the contract. Every omission does not amount to active concealment.

74.

The learned Arbitrator held that the Respondent did not know about the Kalpi stretch before the issuance of the said Notification. In this regard, it is noteworthy that the Respondent proceeded with the contract after the said Notification was issued. It was further held by the learned Arbitrator that reliance placed on Clause 9(a) of the contract by the Petitioner (which provided that the bidder ought to conduct site survey) was of no avail since the pre-bid survey was conducted on or before 20.11.2012. These findings, in the opinion of this Court, stand on murky waters.

75.

Even if it is accepted that the Notification and the contract came into existence after the Respondent placed its bid and deposited the bank guarantee and security, that is to say that essentially the contract was executed before the Notification was issued, this Court is unable to overlook the explicit terms of the RFP itself, which disclose a materially different allocation of risk as noted in the foregoing paragraphs.

76.

By applying for the tender, the Respondent undertook to assess the surrounding circumstances, diversions, traffic and road conditions and to formulate its financial bid after taking such matters into account. The Respondent also undertook to arrive at its own estimate of revenue. It further accepted that inadequacies, lack of completeness or incorrectness of information provided in the bidding documents would not constitute a basis for compensation. These provisions do not permit the Petitioner to commit fraud with impunity, but they are highly relevant in determining whether a particular circumstance was within the commercial risk undertaken by the Respondent.

77.

The same reasoning applies to the Respondent’s allegation that the condition of the highway rendered the contract commercially unattractive.

78.

A commercial contract may become less profitable than anticipated without thereby becoming fraudulent or void. The Respondent had submitted a bid substantially above the APC indicated by the Petitioner. This bid represented the Respondent’s own commercial assessment. The contract did not make actual toll collections the measure of the Respondent’s liability. Rather, the agreed remittance was payable according to the contractual schedule. The Respondent’s inability to realise its expected profits cannot, without more, be converted into a legal right to rewrite the bargain.

79.

The plea that the Petitioner was under a statutory duty to maintain the highway and that any deficiency in such maintenance automatically suspended the Respondent’s remittance obligation also cannot be accepted in the broad form in which as it has been advanced. The statutory functions of the Petitioner undoubtedly exist and remain binding. But it does not follow that every operational deficiency in a highway project automatically extinguishes the independent commercial obligations which a Contractor has undertaken under a user-fee collection contract. Whether a particular failure constitutes a contractual breach must be determined from the agreement, including the allocation of risk which the parties expressly adopted.

80.

The findings of the learned Arbitrator also fail to notice the significance of the Notification, which has been relied upon by both sides. The Notification itself contemplated that user fee could be collected upon the 66.813 Km length before completion of the Kalpi stretch. Thus, the finding in the impugned award that user fee could not lawfully be collected while the 1.7 Km stretch remained incomplete overlooks the express terms of the said Notification.

81.

The learned Arbitrator also did not give sufficient effect to the contractual provisions relating to remittance pending disputes. Clause 27 of the contract expressly provides that even during pendency of a dispute under arbitration, the Contractor was required to continue remitting the agreed instalments, even if the dispute concerned the amount to be remitted. This clearly demonstrates that the possibility of disputes regarding the amount and/or collection thereof was contemplated and that despite the same, the contract consciously stipulates continuity in the payment mechanism. The learned Arbitrator’s approach effectively displaced this agreed mechanism.

82.

The issue of the Petitioner’s right to terminate and appropriate the performance security must also be examined in light of the scheme of the contract and its terms. Clause 19 deals specifically with delayed remittance and provides for penalty and consequential action including termination and recovery from the performance security. Clause 26 further states that disputes concerning the matters enumerated therein, including Clause 19, are outside the scope of arbitration and are to be dealt in accordance with the mechanism prescribed thereunder. Clause 27 further mandates that even during pendency of a dispute in arbitration, remittance by the Contractor shall continue. The Petitioner’s case is that its action arose from default in remittance by the Respondent and therefore fell within a contractual field expressly excluded from arbitration.

83.

The learned Arbitrator nevertheless proceeded to examine the termination and the forfeiture substantially on the basis that the underlying contract had been rendered voidable for misrepresentation and conscious omission and void for uncertainty, and that the Respondent had been wronged by the Petitioner’s conduct.

84.

However, once the foundational finding of fraud, uncertainty and fundamental contractual breach cannot be sustained, the consequential findings regarding the termination and forfeiture also lose their validity.

85.

It must also be emphasised that the mere existence of a contractual right to terminate does not by itself make every exercise of that right immune from judicial review. The Court must examine whether the contractual pre-requisites were met.

86.

In the present matter, the Petitioner’s case was that the Respondent had defaulted in remitting the agreed instalments and that the contractual machinery under Clause 19 had therefore been invoked. In light of the contractual terms, in my considered view, the impugned award wrongly finds that the Petitioner could be deprived of its right to receive remittance merely because the Respondent contended that its collections were inadequate.

87.

The same considerations affect the award of restitution. The learned Arbitrator awarded Rs. 10.35 crores on the basis that the forfeiture and appropriation of the performance security and bank guarantee were illegal. This conclusion necessarily depended upon the prior findings that the contract was void/voidable, the termination was arbitrary and that the Petitioner had acted in breach. If those foundational findings fail, the consequential order for refund cannot stand.

88.

This Court reiterates that it is conscious of the limited scope of interference with arbitral awards and that restraint must be exercised whilst reappreciating evidence. Those principles are not in dispute.

89.

The present case, however, is not one where the Court is substituting one plausible view for another. It is the learned Arbitrator’s treatment of the contractual documents which undoubtedly warrants interference as it goes to the root of the matter.

90.

The RFP (which pre-dates the internal memo, the LOA, the bank guarantee and performance security, the Notification and the contract itself) expressly put onus on the bidders to inspect the site before making their bids and provided that the Petitioner did not guarantee the extent of revenue. The Notification expressly contemplated an incomplete Kalpi stretch, the contract was executed subsequent to this Notification and it incorporated this Notification; the contract also expressly allocated site, traffic and diversion risks to the Contractor/Respondent. The weekly remittance was contractually fixed and was not made contingent upon actual toll collections, and the contract contained specific provisions concerning default, termination and the consequence of disputes. These are not peripheral pieces of evidence but the legal framework within which the parties chose to conduct their transaction.

91.

This Court is unable to accept the proposition that the entire contractual risk allocation can be displaced merely by describing the highway conditions as commercially adverse. A party cannot ordinarily accept a detailed commercial allocation of risk, formulate its own financial bid after being required to inspect the site and then, after the anticipated revenue does not materialise, retrospectively characterise the commercial outcome as uncertain or fraud without establishing the necessary legal ingredients.

92.

It follows that the findings of the learned Arbitrator that the contract was void and voidable cannot be sustained. The consequential findings that the Petitioner’s termination was arbitrary, the debarment was liable to be quashed and that the forfeiture of the performance security and bank guarantee was illegal are also unsustainable to the extent they rest on those foundational conclusions.

93.

This Court accordingly finds that the impugned award suffers from infirmity going to the root of the dispute in its interpretation and application of the contract, the RFP and the Notification. The learned Arbitrator was entitled to determine disputes placed before it, but it was not entitled to disregard or effectively rewrite the bargain which the parties had consciously executed, particularly when the relevant contractual terms directly addressed the very contingencies on which the claims were founded.

94.

For the foregoing reasons, the present petition is allowed.

95.

The arbitral award dated 03.05.2015 passed by the learned Sole Arbitrator in Arbitration Case No.1 of 2013 is set aside to the extent it declares the contract dated 07.03.2013 void and voidable, holds the Petitioner guilty of the contractual breaches forming the basis of such declarations, sets aside the Petitioner’s termination and debarment orders, directs refund of the performance security and bank guarantee amount of Rs. 10.35 crores, awards restitution of Rs. 332.05 lakhs, and grants consequential interest upon those amounts.

96.

In the facts and circumstances of the case, there shall be no order as to costs. Pending applications, if any, stand disposed of.

Footnotes

  1. 1.“Act” hereinafter
  2. 2.“award” or “impugned award” alternatively
  3. 3.Kilometers
  4. 4.“APC” hereinafter
  5. 5.“LOA” hereinafter
  6. 6.“Notification” hereinafter
  7. 7.“ICA” hereinafter
  8. 8.“RFP” hereinafter
  9. 9.(2021) 4 SCC 713
  10. 10.1 Cal ILR 389; AIR 1939 Cal 473
  11. 11.Associate Builders v. DDA, (2015) 3 SCC 49; Ssangyong Engg. & Construction Co. Ltd. v. NHAI, (2019) 15 SCC 131; Delhi Airport Metro Express (P) Ltd. v. DMRC Ltd., (2022) 1 SCC 131; MMTC Ltd. v. Vedanta Ltd., (2019) 4 SCC 163
  12. 12.(2003) 5 SCC 705
  13. 13.Mithoolal Nayak v. Life Insurance Corporation of India, AIR 1962 SC 814; Avitel Post (supra)
  14. 14.Prem Singh v. Birbal, (2006) 5 SCC 353
  15. 15.Reliance Salt Ltd. v. Cosmos Enterprises, (2006) 13 SCC 599
  16. 16.2025 SCC OnLine SC 2339
  17. 17.2009 SCC OnLine Del 1136
  18. 18.(2019) 10 SCC 695