High CourtsDivision Bench(2026) 10 BOM CK 6509

Mariyayi Machhimaar Sahkari Sanstha Maryadit vs Department of Fisheries, Maharashtra & Ors.

Bombay High Court · Decided on 16 October 2026

RESULT
Disposed Of
CASE NUMBER
Writ Petition No.2016 of 2021 With Interim Application No.757 of 2022 With Interim Application No.880 of 2022 With Interim Application No.19487 of 2022 With Writ Petition No.13834 of 2025
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Judgment

305 paragraphs · 16,924 words
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

(PER BHARATI DANGRE, J.)

1.

Mariyayi Machhimaar Sahkari Sanstha Maryadit, a registered society under the Maharashtra Co-Operative Societies Act, 1960, is comprised of members of traditional fisherfolk community known as ‘Koli’ from Koliwadas such as Vashigaon, Juhugaon, Koparkhairane, Ghansoli and Diva. It is the pleaded case of the society that its members are dependent upon fishing activity as their source of livelihood in and around Thane Creek and the society, being registered in the year 2001, claims to be actively engaged in raising welfare concerns of its members. The society is also involved in the business of selling and reselling of fish at fish markets across the State. It is the claim of the society that its members have been carrying out fishing activities with traditional fishing gears since generations.

2.

The Petitioner society, through its President, approached the Court in the wake of the proposed expansion of Thane Creek Bridge -III by construction of a new bridge (Vashi Bridge) on inter-tidal fishing areas with its impact on the mudflats and creeklets over Thane Creek. Pleading that the construction of this bridge would have large scale impact on tidal currents and turbidity levels, and hence an NOC was sought from the Fisheries Department, apart from the fact that it would lead to decrease in fish stock and impact livelihoods of traditional fisherfolk, the Petitioner society approached this Court by seeking the following reliefs :-

“(a)

That this Hon’ble Court be pleased to issue a writ of mandamus or any other appropriate writ, order or direction in the nature of mandamus directing the Respondent authorities to provide appropriate compensation to fisherfolk members of Petitioner belonging from Vashigaon, Juhugaon, Koparkhairane, Diva and Ghansoli fishing villages for loss of mangroves, mudflats and creeklets on account of the construction of Thane Creek Bridge-III.

b)

That this Hon’ble Court be pleased to issue a writ mandamus or any other appropriate writ, order or direction in the nature of mandamus directing the Respondent authorities to refrain Respondent No.8 from commencing construction of Thane Creek Bridge-III without obtaining NOC from Fisheries Department.

c)

That this Hon’ble Court be pleased to issue a writ of mandamus or any other appropriate writ, order or direction in the nature of mandamus directing the Respondent authorities to frame a compensation scheme to protect the socio-ecological interests of traditional fisherfolk members/communities in the State for depriving their means of livelihood on account of reclamation/damage/destruction of fishing areas, including mangroves, mudflats, creeklets, for infrastructure projects.”

3.

The Petition specifically pleaded thus :-

“4.

Thane creek is connected to the Mumbai harbour on its South and joins by a minor connection with the Ulhas river on its north near Thane city. The Creek is broader and deeper towards the sea. Extensive mudflats exist along the banks of the creek which are characterized by the growth of mangroves. Due to such large-scale availability of inter-tidal lands such as mudflats and mangroves, Thane creek provides excellent catch of commercial fish and crustaceans, which in the recent years has dwindled to a bare minimum. This decline in fishery was mainly attributed to heavy industrialization and urbanization that has taken place along both the banks of the creek. In view of ecosystem of Thane Creek providing huge ecosystem services by balancing the marine food chain and attracting huge biodiversity of marine & avifauna and breeding grounds for aquatic life, a large area of the Creek comprising of 794 ha. was declared as "Thane Creek Flamingo Sanctuary" under Wildlife Protection Act, 1972 vide Notification No. WLP-0315/CR-76/F-1 dated 06.08.2015. Annexed and marked hereto as EXHIBIT - B is a copy of the said notification of Thane Creek Flamingo Sanctuary dated 06.08.2015. The Project area falls within the Ecologically Sensitive Zone (ESZ) of the Thane Creek Flamingo Sanctuary.

5.

As on today, Thane Creek Bridge-I and II (also known as Vashi Bridge) connect Mumbai (Mankhurd) to Navi Mumbai (at Vashi) on Sion-Panvel Highway. For the purposes of expansion and catering to increase in traffic congestion at the Bridge, Respondent No.8 has commenced works to construct another bridge adjacent to the present one, known as Thane Creek Bridge-III.”

4.

The Petition in the wake of its pleadings and the reliefs sought came up for consideration before the Division Bench and Mr.Sharan Jagtiani, Senior Advocate came to be appointed as Amicus Curiae. Upon the pleadings being complete, a detailed Judgment came to be passed on 12/08/2021, issuing certain directions.

The Division Bench formulated the following Issues for consideration :-

“(i)

Whether the Petitioner can prove that the Project Affected Fishermen (as defined in paragraph 1) have a customary right to fish for a living in Thane Creek?

(ii)

Whether TCB III is likely to detrimentally impact the practice of such customary rights?

(iii)

Whether a state-wide policy for all categories of persons whose customary rights are affected by infrastructure projects is required? If yes, what is the framework for such a policy that can be recommended to the appropriate authorities?

(iv)

If the answer to Issue (i), Issue (ii) and Issue (iii) is yes, what should be the contours of a policy compensating those affected by TCB III?”

The Court considered each of the Issue separately and rendered its finding, by considering the submissions of Mr.Zaman Ali, the counsel for the Petitioner as well as considering the submissions advanced on behalf of the State and the learned Amicus.

The submissions advanced on behalf of the Amicus were tendered in a note of compilation and the Court appreciated the rival contentions and rendered its finding on each of the Issue, including the Issue as to whether fishing has ever been held by the Courts to be a customary right.

By referring to the general principles in recognising custom or usage as having force of law, it was concluded that the fishermen have a customary right to fishing for a living and reliance was placed upon the Judgments from other jurisdiction like the decision in case of Malibongwe Savid Gongqose & Ors. Vs. Ministry of Agriculture & Ors.1, where the Supreme Court of Appeal of South Africa had an occasion to consider the issue relating to customary rights of fishing for a livelihood, which placed reliance upon the decisions from Australia, Canada in arriving at a conclusion that there exists a customary right of fishing and then it reiterated the principle that “customary rights and conservation can co-exist”.

A decision of National Green Tribunal (NGT), Pune in the case Ramdas Janardan Koli Vs. Secretary, MoEF & Ors.2 was also taken note of, when the traditional fishermen from Koliwadas in the Raigad District of Maharashtra sought compensation for loss of livelihood caused by the project activities of the Respondents and while grating the relief, the NGT held that there are traditional fishing communities claiming customary rights to fish on certain public lands and the construction activity resulting into an infrastructure is likely to cause permanent and temporary damage to the marine ecosystem abutting the proposed project and likely to impact their livelihood adversely and, therefore, directed payment of compensation.

5.

With the aforesaid finding being rendered, the documents placed before the Court to establish their customary right to fish for living in Thane Creek were also taken into consideration to conclude thus :-

“a. The Project Affected Fishermen have inhabited Thane creek and practiced fishing as their main source of livelihood for at least the last 100 years, likely more. This qualifies as an activity being practiced since time immemorial;

b. Various documents, as demonstrated above, have recorded from time to time that the Project Affected Fishermen have inhabited Thane creek, and practiced fishing thereon. Therefore it is also regular and continuous;

c. The Project Affected Fishermen’s use of the creek has uniformly been for the purpose of fishing, thereby making the usage certain and not varied;

d. Finally, their use for the purposes of fishing has been for their own livelihood, and not on some industrial scale which makes the exploitation of their right unreasonable. It is not even the case of Respondent No. 8 or the Respondent Nos. 1 and 2 that the activity of fishing carried out by the fisherfolk is unreasonable.”

6.

The second Issue as to whether TCB III is likely to impact the Project Affected Fishermen’s customary right to fish for a living was also answered in the affirmative. The said finding is reached in the backdrop of certain facts, which were placed before the Court, including the fact that the Authorities were conscious that TCB III will affect the fishermen as MCZMA in one of its meeting indicated that it should be constructed in a manner which does not affect the navigational routes of the local fishermen. Apart from this, the Authorities of the State also recognized that the projects implemented in the maritime area or along the sea coast would impact the livelihood of local fishermen in the proximity of the project.

The Court expressed agreement with the Amicus curiae’s submission that the destruction of mangroves for TCB III will disturb the ecological balance in Thane Creek, as mangroves are responsible for maintaining ecological balance and sustaining biodiversity.

Holding that the Project Affected Persons’ customary rights are likely to be impacted, the Court was of the view that they are entitled to be compensated for their loss.

The difficulty, however, arose since there was no state-wide compensation policy in existence providing guidance as to how the compensation can be computed.

7.

While answering Issue No.3, which fell for consideration, the Court expressed that a state-wide compensation policy for communities affected by Government infrastructure projects needs to be framed as on occasions, the award of compensation has been achieved by legislation, policy and judicial orders. Reference was made to the policies enacted through the legislation like The Mahul Creek Extinguishment of Rights Act, 1972, The Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 and the MTHL Compensation Policy. Reference was made to the legislations like The Maharashtra Project Affected Persons Rehabilitation Act, 1996, The Right To Fair Compensation and Transparency in Land Acquisition and Rehabilitation and Resettlement Act, 2013. It is in this background, it was expressed that once a customary right to carry out an occupation for a means of livelihood is affected, the principles enshrined in Article 21 of the Constitution of India will be invoked and this would form the basis of the State’s duty to provide for compensation and, therefore, the Issue No.(iii) was answered in the affirmative, by ruling that a state-wide compensation policy is required not only for fishermen compensation, but for the compensation of any community whose customary rights to carry out an activity for their livelihood is impacted by Government infrastructure projects.

8.

It is with this background, the Division Bench proceeded to set out the factors and criteria for formulating a comprehensive compensation policy in identifying whether the customary rights of Project Affected persons are impacted and a Compensation Committee shall be constituted comprising of different elements, including the representative of the Project Affected Persons, representative of the District Collector, member from the implementing agency etc. The Committee was expected to address the questions that may arise in award of compensation to the Project Affected Persons including; (a) laying down the principles for identification of persons affected by a Public Project, (b) applying these principles to actually identify each family/person in the community of Affected Persons that needs to be compensated, (c) determining the types of vocation undertaken by the Affected Persons (for e.g., with respect to the fishermen community, the fishing activity could be practiced commercially, or for sustenance, or as artisanal fishing) and (d) categorizing the types of loss that has been suffered (direct/indirect, permanent/temporary, etc.), (e) laying down a mathematical formula for payment of compensation and attributing compensation figures to each type of loss, (f) determining total amount payable in accordance with the devised formula, (g) ensuring the each of the Affected Person are paid the compensation owed to them in a timely manner and (h) entertaining applications for compensation from those that claim to be affected by a project that has not been identified as a Public Project as defined above, i.e. a project which the State Government or implementing agency concludes is not a project affecting customary rights of a class of persons. This would include applications from parties seeking that a particular project should be classified as a Public Project as defined above. The guidelines were also issued for the Compensation Committee in determining the compensation like taking into consideration the direct/indirect impact of the Public Project on the exercise of customary rights and means of livelihood of the Affected Persons, whether the impact is permanent and substantial, the ability or the potential of such affected persons to be rehabilitated etc. The guidelines also included the manner in which the compensation shall be derived and distributed.

9.

With the aforesaid direction being issued, the matter was adjourned for reporting compliance on i) Framing state-wide policy; ii) Determination of compensation by the TCB Compensation Committee to Project Affected Persons represented by the Petitioner.

10.

The Petition appeared before the Court once again on 16/02/2022 and the Court noted that no compensation was paid and rather it was informed that atleast a year would be required to finally decide the issue of compensation. Being not happy with the situation, as the Court expressed a view that the fishermen and their family members cannot be expected to starve until the concerned Authority determine the quantum of compensation, the Court directed the Central Marine Fisheries Research Institute (CMFRI) to submit an interim report to the Court and informed it about the quantum of interim compensation required to be paid to the fishermen at the earliest. Though the determination of interim compensation was indicated to be an ad-hoc exercise, the Court expected CMFRI to have due regard to the order dated 12/08/2021 which had laid down principles and guidelines in determining the interim compensation.

Awaiting the computation of actual compensation, by way of interim measure, it was recommended that the MSRDC shall make payment of Rs.One Lakh to every affected fisherman and it was directed that sum of Rs.Ten Crores shall be deposited in the Court towards interim compensation.

11.

In the wake of the deposit of compensation amount of Rs.Ten Crores, on 23/03/2022, on the suggestion of the learned Amicus, the question of disbursement of ad-hoc compensation was taken up by noting that despite passing of more than seven months of the order passed by the Court, there was no clarity as to how the fishermen should be compensated and as regards the direction to CMFRI to carry out a detailed study as to how TCB III would impact the fishermen, even it was taking considerable time for conclusion of the studies. It was also noted that CMFRI, by filing an affidavit, made it clear that it cannot render assistance for determining the compensation, but can only assist any agency or institute such as Tata Institute of Social Sciences, which may be entrusted with the responsibility of determining compensation.

With this background, with the emergent urgency of arranging livelihood for the fishermen, who were impacted, the Court directed the Registrar (Judical -I) to pay the sum of Rs.Ten Crores deposited by MSRDC to the Petitioner society, which was directed to distribute it to its members in the sum of Rs.One Lakh per family. It was also directed that if some amount was found to be in excess of the amount required for distribution amongst the members, the same shall be brought back to the Court.

12.

It is this order passed by the Division Bench, which was subjected to an Appeal before the Hon’ble Apex Court by MSRDC and the Court was informed that the state-wide compensation policy for the project affected fisherfolk, affected by the Government infrastructure projects was in the process of its formulation. Recording that since more than 7 to 8 projects were under progress, the State was directed to expedite the framing of compensation policy. As a follow-up thereof, the Government of Maharashtra through Agriculture, Dairy Development, Animal Husbandry and Fisheries Department formulated a state-wide compensation policy for the project affected fishermen and by the Government Resolution, a Committee under the Chairmanship of Commissioner (Fisheries) was constituted to compensate the fishermen affected by TCB III project and a Committee was also constituted under the Chairmanship of the Hon’ble Minister (Fisheries) to take decision on proposed draft of the State level compensation policy.

The objectives of the policy were set out as below :-

1)

Identification of (impact on livelihood) fishers;

2)

Type of fishing vessels and other information;

3)

Technical assessment and social impact assessment;

4)

Base Line Survey by Implementing Agencies;

5)

A Standard operating procedure;

6)

Compensation to the fishers;

7)

Grievance Redressal System

13.

The Petition then appeared before the Bench of Justice B.P. Colabawalla and Justice Firdosh P. Pooniwalla on 02/05/2025 and the note was taken of the previous orders passed by the earlier Division Bench, including the orders of payment of compensation as well as the dismissal of the Special Leave Petition, recording that the orders dated 12/08/2021, 25/02/2022 and 23/03/2022 had attained finality.

When the matter came up for consideration before the Division Bench, the Court had before it the interim report dated 12/05/2022 and the final report dated May 2023 of CMFRI.

The Petition was circulated by the Petitioner seeking appointment of Tata Institute of Social Sciences (TISS) to assess the extent of damage caused and to quantify such damage for the purposes of determining the quantum of compensation payable. It was specifically urged before the Court that the final report of CMFRI has failed to quantify the loss suffered and to assess the impact on the increase/decrease of fish catch and diversity due to the absence of baseline data of the original ecology for the period prior to the construction of TCB III and despite this, the final report concluded that TCB III has impacted gill net fishing, hook net fishing and crab trap fishing and noted that construction activity of TCB III has resulted in a change in turbidity of water. Alleging that the report was cryptic and did not attempt to indicate the quantum or extent of damage caused to the Project Affected Fishermen, the Petitioner suggested that an institute with the requisite knowledge and expertise, like TISS, be appointed to carry out this exercise.

14.

The prayer received strong opposition from MSRDC, which urged that there is no infirmity in the final report prepared by CMFRI and in fact, there was no damage that was caused to the Project-Affected Fishermen and this was so reflected in the final report of CMFRI. The Amicus Curiae, however, supported the request and agreed that the final report prepared by CMFRI to some degree allude to both, temporary and permanent damage, but it conclude that the exact extent and quantum of damage cannot be assessed because there is no ‘baseline data’ or in other words, there is no data or statistics prior to the commencement of construction of TCB III, which could be used for comparison.

15.

On hearing the submissions, and with reference to the earlier orders, the Court expressed its view that TCB III will have an impact on livelihood of Project Affected Fishermen and the purpose of CMFRI report or the report of any other expert agency was to determine the extent of loss.

Noting that the order of 23/03/2022 was confirmed by the Hon’ble Supreme Court and even the report of CMFRI has also recorded that to some extent there is temporary and permanent damage caused to the Project-Affected Fishermen as regards their customary right to fish for living, it was noted CMFRI was unable to quantify the extent of loss and consequent compensation payable and rather candidly admitted by an affidavit that it is not competent to render assistance for determining compensation, but is the only body like TISS which may be able to do so.

16.

Upon the attention of the Court being invited to a report prepared by TISS on the topic, “Compensation Policy and its Implementation Plan for Project-Affected Fisherfolk of Mumbai Coastal Road Project (South)” dated February 2023, the Court was persuaded to avail the services of TISS, as its services were earlier engaged to conduct a study after construction of the coastal road as well as under way and by applying an appropriate methodology, it could reasonably assess the damage and compensation and the Court expected TISS to undertake a similar effort.

17.

In light of the aforesaid, the Court passed the following order :-

“35.

In light of the above observations, we direct TISS to prepare a detailed report on the extent of damage and loss caused to the Project Affected Fishermen of TCB III and to recommend an amount towards the quantum of compensation payable to the said Project Affected Fishermen. Needless to add that TISS may recommend a range of compensation and the compensation may vary across different categories of Project Affected Fishermen as may be determined by TISS. It is clarified that TISS can interact with all/any of the persons involved to come to its findings. The costs which will be incurred by TISS are to be borne by Respondent No.8.”

However, in light of the Resolution passed by the Government of Maharashtra, declaring the state-wide compensation policy for Affected Fishermen, which was also subjected to challenge in a writ petition pending before the Bombay High Court, the Division Bench indicated thus :-

“TISS is at liberty to use the state-wide policy for guidance, but should ultimately apply its own mind to the impact caused by TCB III in the same way that it has done in its report pertaining to Costal Road (South).”

18.

In compliance of the said order, TISS has tendered its report captioned as, “Compensation Framework And Recommendations on the Extent and Quantum of Livelihood Loss Sustained By Project-Affected Fishermen Due To The Thane Creek Bridge (TCB)-III” dated 21/11/2025.

The report is placed on record and arguments advanced before us now revolve around the report of TISS.

At the outset, we should note that the report contained the background as well as it has highlighted the overview of Thane Bridge Creek III as well as its significance. It has examined the environmental and social dimensions of the construction of TCB III and also highlighted the historical perspective of the Petitioner society versus Department of Fisheries and others. It has set out the methodology, which was adopted for assessing the impact of TCB III project on the livelihood of fishermen and it states that it has used the mixed-method approach to examine the extent and magnitude of the loss and damage in the wake of the construction of TCB III. Chapter II set out that the research framework is grounded on the living wage and livelihood security framework , allowing for a multidimensional analysis of changes in livelihood assets, access to resources, emerging risks and the coping strategies employed by fishing households. The phases of the study alongwith Literature Review and Survey Design coupled with Primary Qualitative and Quantitative Data Collection, which was adopted alongwith the Stakeholders Consultation is specifically highlighted. The report also contain a profile of Project-Affected Fishing Families with reference to their access to basic amenities and entitlements, education, occupation etc. It also contained a review of Compensation Literature and policy for Project -Affected Fishermen in Indian Coastal States, including the compensation provided for JNPT-ONGC Project-Affected Fishermen, compensation for MTHL Project-Affected Fishermen, Compensation for the Coastal Road Project etc. In Chapter VII of the report, TEES has made recommendations, after devising a formula by which it assessed the category-wise compensation payable to different zones based on severity of impact, by setting them apart into six structured categories and ranging the loss from permanent loss of fishing area to loss from restricted movements, increased fuel cost, minor damage to net boats etc.

19.

In the backdrop of the earlier orders passed by this Court and since the Court was of the view that CMFRI report did not specifically determined the amount of compensation payable and, therefore, it assigned the task to TISS, who has submitted a report covering the compensation framework and has also made recommendations for dealing with the grievance set out in the Petition, we are called upon to examine its effect and whether the formula drawn for payment of compensation and the recommendations deserve an implementation, which will act towards redressal of the grievance of the members of the Petitioner society.

20.

We have before us the report of CMFRI of May 2023 and the subsequent report of TISS in terms of the directions issued by this Court, as CMFRI clearly expressed that it was unable to quantify the extent of loss and the consequent compensation payable to the Project Affected fishermen.

We have briefly referred to the report submitted by TISS and we find that by reviewing the Compensation Literature and policy for the Project-Affected Fishermen in Indian Coastal States, which include the compensation payable to the fishermen in the wake of annual 61 day fishing ban in Tamil Nadu, the State had evolved monetary relief scheme and assistance was offered in the sum of Rs.5,000/- per family, which was distributed to about 1.79 lakh fishing households across 14 coastal Districts, with a total allocation of roughly Rs.89.5 Crore in the relevant year. This amount has been subsequently increased to Rs.8,000/- per registered fisherman (mechanised and non-mechanised) to reflect the inflationary and cost pressures. Apart from this, it is noted that Tamil Nadu offers Savings-cum-Relief Scheme for marine fisherwomen and the State’s Fisheries & Fishermen Welfare Policy describe the entitlements under the Tamil Nadu Fishermen and Labourers (Social Security and Welfare) Act, 2007, which explicitly covers allied activities such as net-mending or fish processing workers as eligible for social welfare benefits.

21.

Another citation is in respect of the compensation demand emerging from Kerala in the wake of ship sinking and fuel spill off its coast in May 2025. The spill disrupted marine ecosystem resulting into imposition of fishing restrictions over a 20-nautical-mile radius, and severely impacted coastal fishing communities. A suit was filed by the State Government against the company seeking compensation for ecological damage, livelihood loss and clean up and mitigation costs. The Kerala High Court ordered temporary relief and containment measures and entertained the petition from fisher associations demanding fair compensation. The Kerala High Court opined that the loss of harvested fish due to marine pollution constituted economic loss and the State’s attempt to detain another MSC vessel until compensation is secured, demonstrated the use of legal mechanism to enforce compensation claim.

In Goa and smaller States, it is noted that the relief is limited to State Fisheries Department grants, small scale aid for damaged vessels or gear, or subsidised inputs rather than structured compensation and such schemes are not well documented in public domain or academic studies.

In Union Territory of Puducherry, in the case case of 61-day fishing ban, it increased its assistance from Rs.6,500/- to Rs.8,000/- per family and the amounts were disbursed via electronic clearance system.

22.

The livelihood compensation framework for fishermen in Maharashtra was also scanned to note that no systematic record exists of reliable compensation or remediation in the areas like Konkan coast, including Ratnagiri, Sindhudurg and Raigad though activities like Port expansion, thermal power stations, coastal tourism development having progressively diminished, affecting non-mechanised and intermittent fishermen. It is found that the fishers have to often rely upon informal dialogues, negotiated settlements or sporadic corporate social responsibility initiatives from private entities. However, beyond the infrastructure projects, Maharashtra has a conservation-linked compensation scheme managed by the Mangrove Foundation and the fishers, who accidentally trap the protected marine species and release them are eligible for fix payments and in fiscal year 2020-21, an amount of Rs.20.4 lakh was distributed. However, it is noted that these payments are small and targeted to conservation actions.

23.

The report of TISS also relied upon the compensation policy for Project-Affected fishermen and it relied upon three representative cases; the first one in Ramdas Janardan Koli Vs. Ministry of Environment and Forests & Ors., which involved traditional fishing families from four Koliwadas in Uran Taluka of Raigad District, who alleged loss of livelihood stemming from Port expansion and projects undertaken by Jawaharlal Nehru Port Trust (JNPT).

It was urged that due to these projects, mangrove destruction and obstruction of tidal flows occurred, which impaired their access to fishing areas and stock. The National Green Tribunal recognised a total of 1,630 traditional fisher families as project-affected and entitled for compensation. The liability was apportioned between CIDCO, JNPT and ONGC reflecting their share of responsibility for damage. The Tribunal fixed the total compensation amount of Rs.95.19 crores, which was equally distributed amongst 1,630 families (yielding roughly Rs.5.84 lakh per family).

The second instance referred to was the compensation for Mumbrai Trans Harbour Link project, which was introduced to decongest the traffic of the island city by improving connectivity with Navi Mumbai covering approximately 21.8 km in length, the infrastructure project began in March 2018 and was completed in January 2024. The MMRDA constituted a Fishermen Compensation Committee comprising of the members from the fishing community, Department of Fisheries, Revenue, MMRDA, Police and it formulated compensation policy by categorising the losses of fishermen into six types and proposing compensation amount in each category. The compensation matrix for different types of losses was set out thus :-

“The Compensation Matrix for Different Types of Losses

Compensation CodeType of lossNature of lossCompensation
C1PermanentLoss of fishing and livelihood due to the removal of fishing stakes (sus’) and nets in the ROWOnetime payment of Rs. 5,84,000/- per unit as per the survey conducted under Clause No. 2.3 to 2.7
C2PermanentPermanent loss of revenue due to a decline in fish catches and changes in seawater currents.50% of the amount provided per Unit in Code C1
C3PermanentLoss due to the restricted movement of subsistence-level fisher-folks for hand picking of fishery organismsOne time payment of 50 % amount provided in Code C1
C4TemporaryLoss of fishing time and increased operating cost (fuel) to reach fishing grounds from their hamlets due to their MTHL during the construction phase.The compensation shall be based on average travel time as compared to the period before construction and as determined during construction survey at Rs. 500/ per hr. for Artisanal and Rs. 1000/- per hr. for commercial.
C5TemporaryLoss of fish due to increased turbidity during the construction phase.Equal to the loss of average catch as compared to the period before construction, and as determined during the construction survey.
C6IncidentalDamage of fishing boats and nets due to movements of barges, vessels, machinery, materials and men along the ROW, jetties, casting yards and labour sites during construction phase.The actual cost of damages to Boats, Gear, etc. and for the loss of time as evaluated by the Evaluation Committee with the Office of the Commissioner of Fisheries/ MMB

The third illustration borrowed was in respect of compensation for the Coastal Road Project, which has significantly affected local fishing communities by disrupting their livelihoods, damaging coastal ecosystem, resulting into decrease in fish catch. The disruption is alleged to have threatened their cultural identity and weaken the entire fishing value chain and for ascertaining its impact, the Corporation engaged TISS to formulate a compensation policy.

TISS recommended a compensation policy to support the fishermen focusing on protecting their livelihoods and coastal ecosystem and the study assessed impacts on different groups in the fishing value chain and designed a compensation matrix tailored to their specific losses.

The recommendation of TISS was dependent upon the boat type and the compensation estimate was thus computed:-

“Compensation Estimates for Fishermen of Worli Koliwada and Lotus Jettty

Boat/ PAF Type (I)Nature of Impact (II)Estimate per boat/fisherfolk per year (III)
HodiTRs 1,75,000.00
1 CylTRs 2,29,810.39
2 CylTRs. 2,99,795.11
3 CylTRs. 3,29,774.62
4 CylTRs. 4,15,366.99
6 CylTRs. 4,56,903.68
TandelsTRs. 1,50,000.00
KhalashisTRs. 1,20,000.00
Castnets*PRs. 96,600.00
Handpickers*PRs. 97,790.00
FishsellersTRs 1,11,527.41
Note

*The impact of the project on Handpickers and Castnets fishers is more or less permanent or will remain for longer duration. Hence they should be entitled for compensation for an additional 6 years beyond the completion of marine works leading to unhindered access to sea for fishing and allied activities.

*It is suggested that an interest as per government rules be applied on the accumulated total compensation for the last four years i.e. 2018 to 2022.

24.

TISS also referred to the report of CMFRI, which was commissioned by MSRDC to assess the impact of TCB III construction on biodiversity, fishing practices and the livelihoods of local fisherfolk.

The report of CMFRI indicated that the most water quality parameters were within acceptable limits, except low dissolved oxygen and high turbidity at certain sampling locations, but these anomalies were attributed to tidal flow, sewerage influx and monsoon runoff, rather than directly to bridge constructions, contradicting some of the local fishermen’s claim. However, TISS noted that the report identified specific ways in which the bridge could affect fishing activities and it was indicated that TCB III has localised impact, but it did not mention the extent or magnitude of the impact nor did it provide detailed guidance on compensatory measures or livelihood support to mitigate the effects on small scale fishermen in the region. TISS also made a reference to the Government Resolution dated 09/03/2023, when the Government of Maharashtra framed and passed a Resolution for state-wide compensation policy for the project-affected fishermen. However, the report of TISS recorded the following conclusion by comparing the available information as regards the compensation policy, including the one introduced by the State of Maharashtra used for offering compensation. The conclusions are thus recorded.

“SUMMARY

While Maharashtra's approach is among the most institutionalised in the country, the compensation framework of the state exposes a gap between principles on livelihood restoration and the practical implementation deficiencies in state policy Global frameworks, including the FAO's Voluntary Guidelines on Small-Scale Fisheries (VGSSF) and the 2019 FAO Manual on Damage and Loss in Fisheries, advocate for compensation systems that acknowledge (a) cumulative and indirect damages, (b) contributions from informal labour. (c) gender-differentiated impact trajectories, and (d) cultural-ecological connections to fishing territories

However, Maharashtra's methodology, evident in both specific projects like the Mumbai Trans Harbour Link (MTHL), and the Mumbai Coastal Road Project (CRP), broader policy formulation, has predominantly conceptualized compensation as a single financial disbursement, rather than a mechanism for sustaining livelihoods, rights, or environmental equilibrium. The State-Wide Compensation Policy (March 2023) establishes procedures for impact evaluation but imposes maximum payment thresholds and does not require participatory assessment approaches. Consequently, while it constitutes progress, it remains misaligned with the equitable transition frameworks advocated in international environmental policy.

Academic and policy literature has critiqued the narrowness of standard compensation regimes. Common points include the underestimation of non-market values (such as cultural, relational, and ecological), discounting future losses, and the exclusion of informal actors who lack titles or registration. Reviews (Vanclay, 2017) caution that simplistic "asset and output loss" methods often overlook power asymmetries in who is considered an "affected person" and the longer-term erosion of livelihoods.

Another important insight is that cumulative and incremental losses are often overlooked projects in fishing zones may cause ecological shifts or resource pressure that gradually reduce yields, an effect not captured by immediate pre- and post-comparison. Also, temporal variability and seasonality must be embedded, fishers' income is rarely steady throughout the year.”

25.

Since the terms of reference to TISS particularly indicated to formulate a compensation policy framework for the project affected fishermen in five villages impacted by TCB III project, according to TISS, two types of compensation are crucial, namely, (A) Direct Loss Compensation and (B) Livelihood Security Compensation. According to TISS, the first would cover the income loss from commencement of TCB III project construction period (2021-2022) to the current period i.e. 2024-2025 (four years) and this amount shall be one time lumpsum amount, whereas in the second category, the compensation according to TISS, shall provide the fishermen with the opportunity to adapt and mitigate the cumulative impact on their income due to project construction, recognising that the losses can persist into future and thereby offering fishermen a chance to diversify their income or choose an alternative livelihood. The total compensation payable was thus determined to be the total of both.

The report then addressed the issue of immediate and measurable loss of fishing income of the Project-Affected fishermen and it was conscious that for computing the loss, it would be necessary to find out as to what was the earlier catch or yield to the fishermen, so as to prove that there is reduction in fish catch in the region on account of construction of TCB III, but since there was no baseline for fishing activities and income before the construction of TCB III, TISS relied upon the ‘income reported by respondents during the socio-economic survey’.

Thus, in absence of any independent data, TISS relied upon the income which the fishermen enjoyed and the reduction in the income, which they perceived as the basis for identifying the income loss experienced by the fishermen belonging to different categories. It derived a formula, but as per the learned Amicus Curiae as well as Dr.Sathe, this ought not to have been the method of computing the data and the Researchers would have approached the Fisheries Department to ascertain what was the yield of the fishermen before construction of TCB III, during construction of TCB III and on completion of construction of TCB III. But, we are surprised to note that what is relied upon is the income reported by the fishermen during their socio-economic survey, which probably is not the correct yardstick to find out the income. Since component (A) represented an annual loss on income was estimated at the current level i.e. 2025, it applied a discounting factor of 5% to adjust the value and the total compensation for component (A) was computed as the sum of annual losses after adjusting for the discounting period from 2021-2022 to 2024-2025.

As far as component (B) is concerned, in which the Researcher worked out a framework for livelihood security compensation, once again it erred as it adopted the framework of Indian Council of Medical Research-National Institute of Nutrition (ICMR-NIN) Expert Committee (2024), to derive the cost of nutritious food for a family and using the ICMR-NIN, it accepted that intake of 2000 calories is considered the average value for a family and computing as to how much would be required to contribute it to this value, a formula was derived in valuing the cost of nutritious food, education, housing, health and contingency and the monthly living wage and earnings equivalent for a family was determined as Rs.20,000/-, summing upto Rs.2,40,000/- for initial year with an annual escalation to the retail inflation, it was enhanced.

26.

In addition, the report also estimate the cumulative impact of a series of construction activities and urbanization in Thane Creek, resulting into reduction in flow, siltation and plastic disposal thus resulting in a decrease in fish catch.

Once again, to determine the losses, it conducted a project-affected, fishermen-wise socio-economic survey to understand the extent of the decrease in fish catch and it was estimated that there is reduction to 40 to 65% in the daily fish catch and Vana fishing has reported the highest decrease in the fish catch. The status of daily fish catch reported by the villagers (in Kg) is tabulated in respect of the five villages with respect to category of fishing i.e. Dol, Gill, Handpicker and Vana, pre TCB III and the current period (2024-25). Based on similar survey collecting the information from the affected fishermen, the daily revenue from the fishing activities was also computed and divided into two parts, namely, before TCB III and at the current time to record that daily loss in revenue due to fishing activities ranges from 20% to 57% and Dolnet and Handpicker fishermen reported the highest decrease in revenue due to decline in fish catch.

The very basis of computing the revenue based on daily fish catch, pre TCB and current period itself, according to the learned Amicus as well as Dr.Sathe is doubtful, once it is noted that there is no data indicating what was the catch or the revenue earned therefrom pre TCB III and the report faces extreme criticism when it compute the direct loss compensation and the revenue loss in percentage for different fishermen categories. The report has divided the livelihood support compensation into two components; (a) living wage, which is set as Rs.2,40,000/- on the annual basis and inflated annually at 5% on account for the rise in cost of living and (b) income loss deflated annually at 17% to reflect the expected decline in fishing.

27.

The report then also provide for a compensation outlay and framework and has computed the compensation component in form of Direct Loss Compensation (DLC) for the year 2021-22 to 2024-25 and by way of Livelihood Security Compensation (LSC), it has computed the same from 2025-26 to 2030-31.

As far as the source of this data is concerned, the report itself state that the estimation is drawn from the TISS Socioeconomic survey and in respect of fishermen using Dol and Vana, it was noted that the factor is not applicable since the income exceeded the annual living wage security threshold of Rs.2,40,000/-. In conclusion, the report provided a total financial outlay with direct and livelihood support compensation and aggregated the total compensation for direct loss approximately Rs.94 crore. Considering the livelihood security compensation for six years, it computed the compensation to be paid to the project-affected fishermen approximately to Rs.141 crore. In the summary of Chapter VII, the report categorically state as below :-

“The above analysis and proposed compensation framework are based on the available database and information collected during the survey period from all the project-affected fishermen. While the Direct Loss Compensation framework is designed to cover income loss from the construction period of TCB-III to the current period, the Livelihood Security Compensation framework is based on living wage financial support studies. It is well recognised under Article 43 of the Indian Constitution. The livelihood security compensation is very crucial in the context of the current project, as the project-affected fishermen lack social, financial, and natural capital to adapt to the emerging distress caused by the impact of TCB-III on their livelihood. It was also found during the survey that employment opportunities for their current generation are inadequate, and they lack the basic skills to diversify their occupations. We hope the proposed livelihood security compensation amount will enable them to adapt to the current financial distress and explore other options for livelihood diversification.”

28.

The learned Advocate General Dr.Sathe representing MSRDC has contrasted the TISS report and its finding as against the CMFRI final report of May 2023, which according to him, did not find any substantial impact on the fishing activity. Since the report was candid, according to him, the Petitioner sought appointment of another agency and TISS was appointed to work out the extent of damage by the TCB III project. Dr.Sathe has placed before us a pictorial site plan reflecting the position of TCB I, TCB II and TCB III as below :

Exhibit reproduced from the original judgment

He would submit that as far as TCB I, a Four Lane Bridge is concerned, it is in existence since 1970 and has 48 pillars, the distance between each pillar being approximately 50 meters. In 1999, Three Lane Bridge (TCB-II) to cater to Vashi Bound Traffic came to be constructed.

From the plan depicting the construction of the bridges, Dr.Sathe would point out that TCB-III, which is a Three Lane Bridge, one of which catering to the Vashi Bound Traffic and another towards Mumbai Bound Traffic, is constructed in a way that the navigation channel between TCB-II and TCB-III is not changed. It is submitted that TCB-III North Bound is completed in April 2024 and South Bound is completed in April 2025. According to Dr.Sathe, for the first time a claim for compensation is raised by the fishermen, when TCB-III is constructed, whereas never ever the claim was raised before. According to him, CMFRI in its report, stated that study area was extended upto 3 km distance towards both sides from the proposed Thane Creek and nine stations were fixed to undertake detailed survey for observation of ongoing fishing activities in the Creek. The study period was for one year and the report record ongoing fishing activities during actual survey in Thane Creek.

Apart from this, the fishermen were interacted individually and the report included the details of the fishers involved in fishing operations recorded during sampling tours in Thane Creek. While reporting about the impact of pile driving on fishery resources, the CMFRI report, highlighted the position when the pile driving was ongoing as cement concrete piles constructed in the proposed bridge penetrate the bottom of the creek till solid bedrock. Pile construction involve drilling of bottom leading to radiation of sound and though para 4.5 of the said report noted that fish tend to move away from the source of sound and the pile driving sounds at relatively close range of a few kilometres, however was not the cause for free- ranging cod to leave an area, but they chose to move closer towards scour-bed and moved away from sound source location.

Apart from this, Dr.Sathe would submit that CMFRI also carried out testing of environmental water quality in situ and arrived at conclusions to the effect that on either side of the bridge Dol Net fishing operations were ongoing on all the seasons on the existing location and it also categorised that the fishing operations can be continued during the post construction phase except the area covered by the newly constructed pillars will not be available for fishing activity permanently.

Thus, according to Dr.Sathe, the decline in fishing was restricted only to the area of the pillars and though Dr.Sathe admit that when the construction activity was going on, there might have been some impact on fishing as the catch continued to drip apart, but now, with sufficient space being available between the pillars from which the boats can pass, there is no difficulty in fishing.

29.

It is the contention of Dr.Sathe that, contrary to CMFRI Report, TISS report indicates the methodology adopted to prepare the report and Dr.Sathe is extremely critical about the fact that the stakeholders involved were only the fishermen and the analysis was carried out on the basis of a comprehensive socio-economic and demographic profile of the fishing families and the report was based upon the socio-economic vulnerability of these communities despite the fact that now they are a part of urbanization. It is his specific contention that the Fishing Department is not at all consulted.

30.

In order to appreciate the submissions, we must reproduce and compare the relevant conclusions/observations in the two reports.

As far as CMFRI report is concerned, it was approached by MSRDC for conducting the impact examination of TCB III bridge construction on fishery and fishing activities and the objective of the study was assessing the impact of proposed Thane Creek Bridge (TCB-III) on the fish stock and fishing activities in the nearby areas of the project site, including the following terms for reference :-

(a)

Temporal analysis of fish diversity in the construction site of TCB-III and its adjoining areas;

(b)

Fish resources and fishery practices in the construction site on its adjoining areas;

(c)

Impact assessment of the construction of TCB-III on fishers.

We must note that MSRDC proposed the construction of the said bridge to avoid the bottleneck of the traffic between Navi Mumbai and Mumbai and the fishers from adjoining areas filed suit against MSRDC for not conducting fisheries impact assessment and, therefore, it approached CMFRI for doing the needful.

The report of CMFRI reveal that the study was undertaken for observation on marine fisheries diversity and to assess impact of construction of Thane Creek Bridge- III on marine fishing activities. Detailed marine fishery, water quality data was collected and data from primary as well as secondary sources on physical environment and marine fisheries was collected for accounting ecological conditions and impact of ongoing construction work of the bridge. Worth it to note that the study period was for one year covering all three seasons and during this period, the report state that ongoing fishing activities were recorded during actual survey and interviews were conducted with the fishermen and information was gathered about their activities. Similarly, fish samples were collected from different ongoing fishing practices in the creek and they were transported to laboratory for further analysis and their species were identified.

The study area indicated in the report covered an area upto 3 km from Thane Creek Bridge on either sides, which had the involvement of D-Dol net, G- Gill net and H-Hook fishing. The demography of Thane Creek is very importantly highlighted in CMFRI report, as it carried a study of several fishing villages and also gave the data of the families and population of fishermen and it is very important to take note of the following aspect :-

“4.2 Demography of Thane creek:

Thane creek lies between Mumbai to Thane separating Raigad, Navi Mumbai an parts of Thane districts from Mumbai and Thane city. It further connects to Vasai crook (Ulhas river) near Ghod-bunder. The creek mainly receives tidal waters from Arabian sea via Mumbai port area and fresh waters from adjoining urban area. Along Mumbai side of the creek fishers from Trombay, Mankhurd, Vikroli, while from Navi Mumbai side fishers from Vitawa, Airoli, Diva, Rabale, Ghansoli. Talavali, Kopar Khairane, Juhu gaon, Vashi gaon, Nerul, Sarsole, Karave, Diwate and Gharapuri comes for fishing in the creek. Details of fishers, their population and fishing crafts given in the Table 1 Throughout the study period, we had continuous interaction with the fishermen and fishermen leaders, of these villages at the project site, in the creek, in the Vashi jetty and at the time of their fishing operation covering dolnetters, gill netters, hook fishers, crab trap practicing fishers, hand pickers etc. Details of different types of fishing practices by the respective fishers from the above villages observed during the observation days are shown in Table 2.

Table 1. Demographic feature of Study area

Name of fishing villageFishermen familiesFishermen populationActive fishermenOther Fishing allied activitiesFishing Crafts
Full timePart timeMotorizedNon-motorized
Trombay160669143292345786
Vitawa82450700
Airoli2597232161612
Diva8733859452524
Rabale3721200
Ghansoli6023962151316
Talavali451704162908
Kopar Khairane9033282753313
Juhu gaon1204561320130518
Vashi gaon2851070281173364490
Nerul1400100
Karave143537105398286
Diwale52021293999541127228
Gharapuri1456140860

It is worth to note that the fishing activity is on the North side of TCB and the South side does not involve any fishing. The survey also included the detailed study of the fishing practices and the report specifically identified the fishermen, who were earning their livelihood by use of Dol net/Gill net/hook fishing, crab trap etc. It also studied the diversity and temporal variations in dolnet fishery catch season-wise i.e. pre-monsoon, monsoon, post-monsoon and winter and listed the species according to their abundance/similarity. Water quality parameters were also checked and it was recorded that there is no significant difference in the parameters’ values within the stations for the respective seasons irrespective of the distance. The impacts of pile driving on fishery resources was recorded to be of temporary nature as the drilling activity was being carried out.

Ultimately the conclusion of the report was recorded as below :-

“CONCLUSIONS

1.

Fishery practices observed during the study period was found to be 1. Dol Net Fishing, 2. Gill Net fishing, 3. Hook fishing, 4. Crab Trap fishing and 5. Hand picking of Bivalves. Through enquiry with fishermen following fishing practices were recorded as 1. Barrier net fishing and 2. Cast net fishing.

2.

With respect to Dol net fishing operation no sus were observed in the actual bridge construction site on either side up to 500 m, hence there is no dislocation/removal of dol net sus due to the on-going TCB-III bridge construction during the study period. Further, it was observed that on either side of the bridge, dol net fishing operation is going on all the seasons on the existing sus locations.

3.

Gill net fishing is not a stationery fishing practices unlike dol net fishing, therefore it can be operated anywhere in the creek according to the availability of fishes. But due to ongoing construction activities, gill net fishing operation within the vicinity of the construction site was not possible.

4.

Despite the on-going construction activities, Fishing by using Hooks and crab trap were observed in the pillar construction area, also under the old TCB-1, running TCB-2 bridges and also these fishing operations can be continued during the post construction phase. However, the area covered by the newly constructed pillars will not available for these fishing operations permanently.

5.

Navigation passage for the movement of fishing crafts (dol netters, gill netters, non-motorized canoes and hook fishers) during construction was not restricted, facilitating access to the fishermen to fishing ground on the both sides of the proposed bridge.

6.

Fish diversity recorded from the study area was found to be 66 species. Teleost is found to be 48 nos, Crustaceans 15 nos, Molluscs 2 nos, Sea snake 1 number. Fishing was observed throughout all the seasons in the study area. No baseline data prior to the TCB-III bridge construction is available to access the impact on the increase/decrease of fish catch and diversity due to the construction of the bridge on-going TCB-III project. Hence, this study report will form the baseline for the future comparative studies.

7.

Turbidity during the study period was recorded for all the seasons. Study revealed that long term elevated turbidity associate with decreased fish richness and diversity and higher abundance of benthic species. However high turbidity also provide beneficial predation refuge for crabs and other benthic organisms (Lunt & Smee, 2020). However values of turbidity cannot be attributed to the bridge construction only. Since there are many other factors influencing the turbidity such as domestic sewage run off; tidal influx, runoff during monsoon season. Moreover, current study's recorded turbidity range is from 16.10-105.7 NTU, which is coincide with the report of NPCB of 2018 (22.6-106.9 NTU) NIO, December 2018. This clearly shows that the turbidity recorded during the study period may not be attributed to TCB-III construction activities only.

8.

There is no observation of mass mortality of fish during the entire study period at the construction site and its adjoining areas.

9.

Underwater sound produced during the piling may result in temporary dispersal of fishes and invertebrates from sound source.”

31.

In comparison of this report, in light of the order passed by the Division Bench, as the report of CMFRI was not able to quantify the amount of loss and the damage caused on account of TCB-III project, and TISS had already assisted MSRDC in the Coastal Road Project and submitted a report as to how it affected the ecology and impacted the lives of those affected, TISS was chosen as an Agency for determining the compensation framework and to recommend the extent and quantum of livelihood loss sustained by the Project-Affected fishermen due to construction of TCB-III.

The report placed before us comprise of the policy framework as well as recommendations and TISS has also highlighted the methodology which it has adopted in drawing the said report.

The report has indicated that the construction of TCB was necessitated to enhance the regional mobility within the Mumbai Metropolitan Region and taking note of the present scenario, it indicated that both its arms are fully operational and the corridor is projected to carry approximately 100,000 vehicles per day, alleviation congestion on TCB-II and reducing travel time between Mumbai and Navi Mumbai by nearly 30%. It is also admitted that the bridge is also anticipated to stimulate economic growth by improving logistics connectivity between industrial clusters in Taloja, Panvel, and the forthcoming Navi Mumbai International Airport. The report acknowledge that since the project is situated within an ecologically sensitive creek zone, and the project has undergone extensive environmental scrutiny and around 1.3 hectares of mangrove forests were diverted under the Forest Conservation Act, with compensatory afforestation and ongoing monitoring obligations were incorporated into the project’s approval conditions. In addition, under the Environmental Impact Assessments (EIA), the hydrodynamic effects of the new piers, potential alterations to tidal flow and outlined measures for mangrove regeneration and ecological mitigation were evaluated.

32.

Chapter II of the report has set out the methodology to be adopted and this included a phase-wise study as indicated below :-

PhasesDuration
Phase 1 : Literature review and Survey DesignJune 2025
Phase 2 : Pilot Study and Community ConsultationJuly 2025
Phase 3 : Primary Qualitative and Quantitative Data CollectionAugust-September 2024
Phase 4 : Data Cleaning, Analysis and Report WritingOctober 2025
Phase 5 : Stakeholder Consultation and AnalysisNovember 2025
Phase 6 : Designing Compensation Framework and Submission of the ReportNovember 2025

In the second phase involving Community Consultation, the State focused on research within the lived realities of fishermen by carrying out preliminary visits to key fishing settlements and their associated jetties along Thane Creek to gain first-hand insights into how the construction has impacted the traditional fishing practices, access to fishing grounds and daily livelihood routines.

The interactions were conducted with the object of identifying the emerging concerns, pattern of disruption and varying vulnerabilities across different occupational groups.

33.

The next stage focused on collection of primary data from the fishermen households affected by the project across selected settlements in the Thane Creek and a structured interview schedule was adopted to gather detailed information on household demographics, fishing and allied livelihood activities, income and expenditure patterns, fishing assets and perceived livelihood impacts before and after the construction. As per the report, tool also addressed access to social protection, indebtedness, occupational shifts, and expectations regarding compensation and future livelihood support, providing a comprehensive, multidimensional assessment of the project’s impacts.

The questionnaire, which was circulated, included the questions regarding basic profile alongwith identification of the household amenities and assets/welfare entitlement as well as any income earned outside fisheries-based activities. It also collected data as regards the household finance and indebtedness. Worth it to note that majority of the households in the five villages were surveyed in the household survey and very few were missed out due to non-availability for several reasons.

This was followed by data cleaning, its analysis and report writing. In the phase of stakeholders consultation, it is mentioned that there was interactions with the officers from the Department of Fisheries and the MSRDC, so as to gather institutional insights and contextual information relevant to the study.

34.

While preparing the profile of the Project-Affected fishing families, it is to be noted that the entire data was the one which was collected from the fishermen i.e. the household survey of 937 families covering a total population of 3,345 individuals and the research focused upon their religion/social category, but Dr.Sathe would submit that there is no data collected by TISS from Navi Mumbai Municipal Corporation and in fact, since they are enjoying certain social benefits, the Corporation definitely must have maintained the data in regards to their earnings, as the surveyed households were in possession of ration cards and in fact, the report itself indicate that the majority of the surveyed households possess Orange Ration Card (BPL), 7% hold Antyodaya (Yellow Card), 13 households i.e. only 2% were above poverty line i.e. holding White Ration Card and 3 households did not possess any card. With this information being available, according to Dr.Sathe, necessary information ought to have been collected as regards their income from the Corporation or the Authorities which had maintained the record of ration cards, but no attempt is made to assess their income except the questionnaire i.e. circulated to the fishermen.

35.

We find that the report of TISS is entirely based on its survey in form of questionnaire covering the households and even as regards as to what type of fish is available or whether there is a change in navigation path, the analysis is based upon the information furnished by the fishermen. While concluding that there is a decline in the availability of various types of fish catch post TCB-III, which has impacted the income of fishermen, only statement of the fishermen that this quality of fish is not available has been accepted as gospel truth.

36.

It is for this reason, the report submitted by TISS, has received criticism not only from MSRDC, but also from the learned Amicus.

The TISS report is accompanied with a questionnaire, which the respondents (fishermen) was required to answer, which led to the basic profile of the family alongwith the information collected in regards the household details with different columns, namely, household members, basic amenities, sanitation, electricity, public distribution system, household assets details (presence of refrigerator, washing machine, car etc.), entitlements received under various schemes, including Ayushmann Bharat, Laadki Bahin, Right to Education etc.

One section of the analysis was dedicated to livelihood and income details for non-fishing activities i.e. whether any member of the family is in Government employment or self employed or engaged in private job/business and the earnings therefrom per month. Another part of the survey was dedicated to ascertaining the type of fishing related activities, in which the family is involved and whether there was a fishing licence, its validity, what type of boat was being put for use for fishing, what type of net is used for fishing etc. As far as impact on the changing pattern of fishing on account of TCB-III is concerned, a very perfunctory information was sought, which is as below :-

Exhibit reproduced from the original judgment
37.

Apart from this, a separate questionnaire attempted to assess impact on navigation by simply asking, ‘Did you change the navigation path for fishing after construction of TCB-III-Yes or No; reasons for path change; how much distance covered for fishing.”

In order to ascertain as to what was the assistance expected by the fishermen families, section ‘J’ of the questionnaire was dedicated to modality, seeking information whether any interim compensation was received and inquiring as to what shall be the mode of receiving the future compensation and the manner in which the financial compensation shall be paid i.e. whether it shall be a lumpsum amount or in installments etc.

It is merely on the basis of the data, which is collected through this questionnaire, the compensation has been computed in chapter VI and for Direct Loss Compensation (component A), a formula has been devised covering the income loss resulting from the reduction in fish catch in the region due to TCB-III and though there was no baseline for fishing activities before the construction of TCB-III, the income reported by the respondents (individual fisherman) during socio-economic survey was taken as the baseline. We find this method to be completely erroneous as what an individual fishermen has reflected about the fish catch and his income before the TCB-III construction began, definitely could not have been taken as a gospel truth. In determining the component B i.e. livelihood security compensation, we find that the framework of Indian Council of Medical Research-National Institute of Nutrition (ICMR-NIN) Expert Committee (2024) was adopted, without any basis and the monthly living wage and earning equivalent for a family was arrived at Rs.20,000/-equalizing it to Rs.2,40,000/- for the initial year with an annual accretion of 5% every year.

The component A and B were thus computed dependent upon the fishermen category, namely, Dol/ Gill/Handpicker/Vana. The livelihood security compensation was, thereafter, considered for five different villages; Dive, Ghansoli, Juhugaon, Kopar Khairane, Vashigaon and the fishing base for three categories of fishing was estimated at 240 days whereas for Vana, it was estimated as 50 days. The livelihood security compensation was then divided into two components; living wage being set at Rs.2,40,000/- on an annual basis and inflated annually by 5% and the income loss deflated annually at 17% to reflect the expected decline in fishing revenues.

Based upon the aforesaid factor, the direct loss compensation was worked out from 2021-22 to 2024-25 for the four categories of fishermen and the livelihood security compensation (LAC) was worked out for six years commencing from 2025-26. The compensation awarded was thus the component A+B and in aggregate for direct loss compensation for the four categories of fishermen was approximated at Rs.94 Crore and the livelihood security compensation for six years to be paid to the Project-Affected fishermen is approximated to Rs.141 Crore.

38.

During the course of hearing, we had the presence of Dr.Geetanjoy Sahu, Professor & Dean, Chairperson, Centre for Climate Change & Sustainability Studies, School of Habitat Studies, TISS, Mumbai, India and he has also furnished a note explaining the compensation framework and methodology. According to Prof.Sahu component A compensates for measurable loss of income already suffered, but that by itself does not restore affected families ability to maintain a sustainable livelihood. Component B provides traditional livelihood support to enable affected fishermen and their families to adapt to the changed circumstances, diversify their sources of income and achieve long-term economic stability. It is clarified that methodology for component B is based on the concept of a living wage, which represents the minimum income required for a family to maintain a decent standard of living and it would cover essential needs of a household, including adequate nutrition, housing, healthcare, education and other necessary day-to-day expenses.

The note also clarified that the current income of each affected fisherman was determined by the socio-economic survey and it was compared with the estimated annual living wage to note that the minimum income required for a dignified standard of living and the difference represented the livelihood support required under component B.

39.

The report of TISS, according to learned counsel Mr.Zaman Ali for the Petitioner, has adopted a rational methodology and he would submit that since CMFRI was unable to quantify the extent of loss and the consequent compensation payable, TISS was engaged as it had already developed a methodology to assess the compensation payable on construction of the Coastal Road. According to the learned counsel, there is no data available with the Fisheries Department regarding income of fisherfolk in the State and it is in this background, TISS chose to have review of the literature prevailing, including the CMFRI report and community consultation and it collected the data by physical verification of fish landing sites, gear repair areas, fish segregation and drying zones etc. It also interacted with the stakeholders, including the Department of Fisheries and MSRDC and, thereafter, reviewed the compensation literature and the policy prevailing for Project-Affected fishermen in Indian Coastal States before it computed the compensation payable for the Project-Affected fishermen due to TCB-III.

40.

The learned Amicus Mr.Jagtiani, in a note submitted by him, indicate that the study by TISS involved a mixed-method research design integrating quantitative and qualitative approaches to examine the extent and magnitude of loss and damage to the livelihoods of traditional fishermen and the crucial part of the report is, TISS discusses its method for primary ‘qualitative and quantitative data collection’ and this involved ‘a structured interview schedule’, which was placed at Annexure I.

The report then analysed the data collected and it also discus some illustrative examples of the case studies and the interviews conducted, but the analysis was largely based on the answers given by the Project-Affected fishermen. Thereafter, TISS recommended a compensation framework essentially entailing; ‘direct loss compensation’ and ‘livelihood security compensation’.

However, Mr.Jagtiani, who was appointed to assist the Court, specifically pointed out in his note that the report has suggested the direct loss compensation to be Rs.94 Crore and the livelihood security compensation computed for six year period, the amount of Rs.47 Crore is quoted. Very pertinently, the learned Amicus has pointed out that TISS has accepted

that, “since there was no baseline for fishing activities and income before the construction of TCB-III, we rely on the income reported by respondents during the socio-economic survey. Although the income reported by the fishermen before the construction of TCB-III is based on their recall, we used statistical measures to address the anomaly in reporting, as well as the median as a central tendency to identify the income loss experienced by fishermen belonging to different fishing categories.”

41.

In advancing his submissions on the aspect whether the TISS Report fulfill the mandate given by this Court by its orders dated 12/08/2021 and 02/05/2025, which expected an expert body to scientifically (i) assess the impact and damage of the construction of TCB III on the fishing activities of the Petitioner and (ii) based on the impact and damage, compensation to be determined, the note by the learned Amicus find flaw in the report, and according to him, no scientific tools were deployed to assess actual impact and damage and the problem appeared became more precarious, as there was no baseline data available to evaluate as to what was the fish catch and fish diversity prior to construction of TCB-III. The opinion of the learned Amicus is to be found worded as below :

“30.

Evidently, the tone and tenor of the extracted portions of the Orders is that an expert body would be required to scientifically (i) assess the impact and damage of the construction of TCB III on the fishing activities of the Petitioners; and (ii) based on the impact and damage, compensation must be determined.

31.

The TISS Report has made an attempt to quantify the damage and impact of TCB III but has done so by inviting from the project affected persons, self-declarations on the loss of fish catch and decrease in income.

32.

While the effort made by TISS is not in doubt, the question is whether inviting self-declarations from project affected persons would fulfill the mandate of the 2 May 2025 Order appointing TISS.

33.

It appears not. Self-declarations from project affected person are possibly one factor in quantifying impact and damage. But given the inherent risk of bias, there ought to have been some attempt made to corroborate the numbers with official statistics available with government bodies. Further, and more importantly, no scientific tools were deployed to assess actual impact and damage.

34.

The problem appears to be one of unavailability of baseline data, and difficulty in deploying tools to evaluate what the fish catch and fish diversity was prior to the construction of TCB III.

35.

The question is: what is the way forward for this Hon’ble Court? One option is to consider the approach taken in other infrastructure projects, and possibly apply one of those approaches to the present case.

42.

With this expression of opinion, according to the learned Amicus, it is necessary to examine the compensation framework for other infrastructure projects and this include the MTHL Policy, the Maharashtra State Policy and the Compensation Policy for Project-Affected fisherfolk for Mumbai Coastal Road Project (South) (‘Costal Road Policy’). It is pointed out to us that every policy has its own peculiarity.

43.

The learned Amicus has highlighted before us the salient features of different polices as under :-

(I) Mumbai Trans Harbour Link Fisher Folks Compensation Policy

As far as MTHL policy is concerned, he would submit that the environment impact assessment was conducted based on the previous baseline studies, as the policy identified the types of fisherfolk in the vicinity of the project as (i) commercial who reside in the villages, but do not fish in the creek area; (ii) Artisanal who are traditional fisherfolk and (iii) Subsistence fisherfolk who are daily fish catchers, who generally fish by hand picking.

The MTHL policy contemplate conducting a fishing survey in order to obtain a comprehensive socio-economic baseline that can be used to refine mitigation measures, so as to form the basis of the Fisherfolks Compensation Plan and the basis of social monitoring programme for the project.

The note submitted by the learned Amicus has summarised the MTHL policy and also set out as to how the figures for compensation were adopted from an NGT order and considered the period of three years to switch over to some other location to establish livelihood. We deem it appropriate to reproduce the summarisation of the MTHL policy, as undertaken by the learned Amicus.

“41.

The MTHL Policy identifies the specific heads of losses for which compensation is to be given (categorized from C-1 to C-6), the explanation for including such heads of losses and prescribes either a fixed quantum or a formula for calculating the quantum against each of these kinds of losses. These are summarized below:

(i)

C-1 is for loss on account of remove of fishing stakes and net. Fisher folk practicing ‘dol’ net fishing have permanent stakes (‘sus’) in the creek that are in the vicinity of the MTHL Piers which will have to be displaced permanently. Compensation is prescribed as a one time payment of Rs. 5,84,000/-

(ii)

C-2 is for loss due to decline in fish catch on account of changed seawater current. Dol-net fishing relies on tidal currents and operate efficiently at certain current velocities. The construction of the MTHL priers would impede the currents and slow them down in some places. (This finding is based on the technical study carried out by the Central Water & Power Research Station (CWPRS), Pune on the effect of proposed Mumbai Trans Harbour Link project on the flow conditions in Mumbai/Jawaharlal Nehru Harbour area from tidal hydrodynamic considerations.) The reduced velocity of the current would result in low efficiency of the dol-nets and therefore reduce the days of fishing and quantum of fish. Compensation is prescribed at 50% of the amount for C-1.

(iii)

C-3 is for loss due to restricted movement of subsistence fisherfolk for hand picking. Due to construction of the landward part of the MTHL, casting yards, labour camps and access roads for transport, these fisherfolk will be prevented from accessing their fishing grounds in the inshore or inter tidal zones. Compensation is prescribed at 50% of the amount for C-1. Compensation is prescribed at 50% of the amount for C-1.

(iv)

C-4 is for loss due to increased time and cost to travel to their fishing grounds and wharfs during the construction phase of MTHL. Compensation is to be based on average travel time as compared to the period before construction and as determined during construction survey at Rs. 500/ per hr. for Artisanal and Rs. 1000/- per hr. for commercial.

(v)

C-5 is for loss of fish due to increased turbidity during construction phase. Compensation to be paid is equal to the loss of average catch as compared to the period before construction and as determined in during construction survey.

(vi)

C-6 is for damage to fishing boats or nets during movement of barges and vessels during construction phase. Compensation is determined as the actual cost of damages to Boats, Gear, etc. and for the loss of time as evaluated by the Evaluation Committee with the Office of the Commissioner of Fisheries/MMB

42.

It is pertinent to note that figures for compensation (i.e. Rs. 5,84,000/-) was adopted from the an NGT Order (Order no. 19/2013) dated 27 February 2015. As the MTHL Policy explains: “the NGT has considered period of 3 years to switch over to some other vocation to establish livelihood. The impact on fisher-folks due to construction of MTHL also considered similarly. Hence, the compensation base used by NGT has been applied being most recent and most relevant.”

(II) Maharashtra State Policy

Recording that the compensation matrix indicated in the said policy is borrowed from the MTHL policy, six categories of loss have been identified, with the main object of the policy being identified to be; types of fishing vehicles, technical assessment and social impact assessment, baseline survey by implementing agency, standard operating procedure, compensation framework and grievance redressal mechanism.

The key features of the policy can be highlighted thus :-

“51.

Under the Maharashtra State policy Compensation for the various heads of losses are set out as fixed one time payments. This is different from the MTHL policy when respect of certain heads of losses (C-4 and C5) compensation is calculated by comparing the pre-construction position versus the position during the course of construction. This is explained above. Therefore, under Maharashtra State Policy once any of the heads of losses is established, the prescribed amount is to be paid.

52.

Moreover, a key feature of both these policies is that all studies and surveys are to be carried out prior to the start of construction of the project. The reasons would appear obvious – it allows for establishing of a base line against which the impact of the construction can be compared. “

(III) Mumbai Coastal Road Policy

It is TISS, which was appointed to prepare compensation policy for the Project-Affected fisherfolk on account of Coastal Road Project. The objective of the study being to identify the impact and arrive at a compensation package.

As per the note of the learned Amicus, the said policy identified the impact of the project on the fisherfolk as (i) loss of fishing area; (ii) loss of navigation; (iii) impact on navigation and (iv) impact of incomes and livelihood. The policy applied the following methodology :-

“63.

A statistical assessment of the project affected fishfolk in conducted using quantitative research methods. The data collected during the surveys was analyzed to obtain the following insights:

i.

Classification of the fisherfolk across roles in the value chain on the basis of their standard of living into low, medium and high.

ii.

The average monthly household expenses.

iii.

Occupational assets of the fisherfolk based on their role in the value chain.

iv.

Fish catch related details before and after the Coastal Road project commencement. This is used to determine the impact on the income from fishing activities of the various identified players across the value chain.

v.

The Compensation Framework is based on three layers :

(i)

Stochastic Impact: This is compensation based on professional assets and livelihood expenses rather than income from fishing activities. Compensation is paid towards damage to fishing and professional assets. This is subject to verification and will vary case-to-case.

(ii)

Idiosyncratic Impact:

(a)

This compensation based on impact on livelihood.

(b)

The following steps are taken into account in order to calculate compensation: (1) indicators for season wise income expenses reported for fishing activities prior after commencement of the coastal Road; (2) estimation of discounting rate for expenses to arrive at discounting cost; (3) estimation of idiosyncratic cost by subtracting a discounted cost from income (prior to the Mumbai coastal Road project); (4) calculation of adjustment for current income; (5) estimation of per boat compensation by dividing idiosyncratic cost with a number of boats or number of Fisherfolk.

(c)

The Mumbai Coastal Road Policy sets out a table (No. 6.4) where the compensation estimates are provided based on the type of boat and role in the value chain.

“TABLE 6.4 : COMPENSATION ESTIMATES FOR FISHERFOLK OF WORLI KOLIWADA AND LOTUS JETTY

Boat/ PAF Type (I)Nature of Impact (II)Estimate per boat/fisherfolk per year (III)
HodiTRs 1,75,000.00
1 CylTRs 2,29,810.39
2 CylTRs. 2,99,795.11
3 CylTRs. 3,29,774.62
4 CylTRs. 4,15,366.99
6 CylTRs. 4,56,903.68
TandelsTRs. 1,50,000.00
KhalashisTRs. 1,20,000.00
Castnets*PRs. 96,600.00
Handpickers*PRs. 97,790.00
FishsellersTRs 1,11,527.41
Note *The impact of the project on Handpickers and Castnets fishers is more or less permanent or will remain for longer duration. Hence they should be entitled for compensation for an additional 6 years beyond the completion of marine works leading to unhindered access to sea for fishing and allied activities. *It is suggested that an interest as per government rules be applied on the accumulated total compensation for the last four years i.e. 2018 to 2022.
(iii)

Livelihood enabling compensation: composition here is towards the risks to reduction in income, employment, employability, skilling and development of community assets.

vi.

The period for which compensation is recommended across the various players is set out :

(i)

Distribution to boat owners is determined based on when the boat was purchased. For eg. If the boat was purchased in 2019 or before then compensation is for four year plus the period till completion of marine works leading to unhindered access to sea for fishing activities. For boats purchased in 2020 compensation for a three years + the period till completion of marine works. This is because as indicated above construction on the project had begun in October 2018.

(ii)

Distribution two Khalashi, Tandel and fish sellers shall be given as lump sum amount for the last four years until completion of Marine works.

(iii)

Since Handpickers and Castnets suffer permanent loss on account of reclamation, compensation to these persons is for four years plus completion of the project plus six additional years.”

44.

In the backdrop of the pros and cons of the policies, which are available for award of compensation, the learned Amicus proceed on a footing that there is no baseline study providing data prior to construction of TCB, though MTHL policy and Maharashtra State Compensation Policy required and was based on studies and surveys to be carried out prior to the start of construction of the project, but at this stage, it is not possible to have this data, and according to the learned Amicus, absence of the baseline study before start of the construction is a big setback in adopting the comparison method and computing the compensation in turn.

As per the learned Amicus, the report of TISS attempting to overcome this issue by collating the information from the Project-Affected persons themselves in form of self declaration on the loss of fish catch and decrease in income may not be accepted as a reliable basis to compute compensation, as self declarations from Project-Affected persons may be one factor in quantifying impact and damage, giving the inherent risk of bias and, therefore, there is a need to corroborate the numbers against other sources.

45.

It is in this background, the learned Amicus has offered the following recommendations :-

“Recommendation No. 3:

72.

Another way may be to simply adopt an ad-hoc discounting factor which the court may find reasonable. For example, the Court may consider that the self-declaration of income taken at 1/2 or 1/3 or 1/4 as more reasonably reflecting the correct compensation amount.

73.

In the Written Submissions submitted by R-8 (MSRDC), it has suggested that data maintained by R-1 (Fisheries Dept.) may be considered to assimilate and analyse historical income patterns for the project affected fisherfolk.

74.

The record is unclear on what the data collection and maintenance responsibility of Respondent No. 1 is under statute or otherwise. The question of whether this data could be used to arrive at an appropriate discounting factor would depend on the type of data, if any, Respondent No. 1 is required to maintain.

75.

Further, in previous projects such data ostensibly available with the Fisheries Department does not appear to have been adopted as the sole basis for compensation either. It is pertinent to note that in respect of previous projects such as the MTHL, the MTHL Policy mandated an actual baseline study to the impact. Even the Maharashtra State Policy contemplates such a baseline study. This has been discussed in detail in a previous section of the Note.

Recommendation No. 4:

76.

Respondent No.1 may be called upon to furnish the necessary details about the kind of data its maintains pertaining to livelihood of fisherfolk and the circumstances and purpose under statute or otherwise under which such data is collected.

Recommendation No. 5:

77.

Assuming the Court is inclined to factor in the above data and considers appointing any committee to analyze such data in order to determine an appropriate discounting rate, it may consider appointing TISS on such committee along with the concerned government authorities. Given that TISS has conducted a detailed data collection exercise on the income of the project affected fisherfolk, it may be equipped to contribute in the exercise to be carried out by such committee.”

46.

Responding to the recommendations by the learned Amicus, and in specifically submitting that suitably discounting factor may be adopted to reduce the figure of Rs.94 Crore to reflect the reasonable amount, Mr.Ali has submitted that TISS has already applied the discounting factor by deflating the income loss annually at 17%

47.

MSRDC, represented by Dr.Sathe, would submit that the report of TISS for which the core quantification tool is household questionnaire and it continued to being the sole source of primary information, which is not capable of bringing about the true data. According to Dr.Sathe, the TISS report reveals a fundamental inherent inconsistency between the socio-economic profile of the Project-Affected fishermen as presented for purposes of establishing vulnerability and the income figures attributed to the very same individual for the purposes of computing compensation. According to him, TISS report that the 91% of the surveyed households hold BPL cards. Yet the case study documented by TISS in the report assign pre-project annual income to the BPL households, which are several multiples of any recognised poverty threshold, and to cite an illustration, Dr.Sathe would point out case study 1 featuring Dhananjay Motiram Mukadam, a Dol Net fisherman of Kopar Khairane to whom TISS attributed pre-TCB III income of Rs.26,40,000/- much over the BPL ceiling. Similarly case study 2 featured Shatrugan Baburao Bhagat, another Dol Net fisherman from Juhugaon, whose pre-TCB III annual income is recorded as Rs.18,48,000/-, also over the BPL ceiling.

Thus, according to MSRDC, TISS report itself record that annual household fishing input expenditure is approximately Rs.4.80 lakh for hand pickers, Rs.3.00 lakh for dol fishers, Rs.60,000/- for Gill fishers and Rs.26.50 lakh for vana fishers (as per table 6.3 of TISS report). The report also record that 856 out of 939 surveyed households (91%) possess BPL ration card, but the Press Information Bureau by the Government of India in its publication-India Poverty Story Transformed dated 07/06/2025 record that the World Bank has revised the International Poverty Line to $ 3 per person per day i.e. $1095 annually and that India’s poverty rate at that benchmark stood at 5.25% in 2022-2023. The same publication records average annual per-capita expenditure of approximately Rs.49,500/- in rural areas and Rs.84,000/- in urban areas. As against these benchmarks, 91% of the BPL claimants out of 953 persons, according to MSRDC, cannot possibly have annual fishing-input expenditure as Rs.3 lakh, Rs.4.80 lakh and Rs.26.50 lakh, indicating that the claimed incomes of these persons is fictitious and imaginary.

48.

According to Dr.Sathe, these contradictions goes to the root of the credibility and reliability of the self-reported income figures and the TISS report is entirely based upon this data. He is extremely critical about the fact that a household cannot be a BPL household for the purpose of establishing economic vulnerability on one hand, but an household earning of Rs.18-26 lakhs per annum, when it comes to claiming compensation and the criticism of Dr.Sathe is that TISS made no attempt to reconcile or explain this discrepancy and in absence of any corroboration from landing registers, auction records, or Fisheries Department data, the pre-project income figures must be treated as unreliable and incapable of forming the basis for a compensation award of approximately of Rs.141 crore.

49.

We have given our thoughtful consideration to the report of CMFRI as well as TISS and we agree with the learned Amicus and Dr.Sathe that the report of TISS lack a clear scientific model or objective criteria, as it has collected the information from fishermen and applied the said criteria in arriving at the loss caused to them and derived a formula for computation of compensation. How fishermen or villagers are actually impacted by TCB-III is not at all demonstrated.

The report is accompanied with the questionnaire form and we find that the information is collected in Yes/No form and surprisingly, when the information is filled in, TISS did not ask for submission of any document, when a statement is made as regards the income that was earned and how TCB-III impacted it. The findings in the report of TISS are contrary to CMFRI’s conclusion on localised impacts, acceptable water-quality ranges and continued fishing on both sides of TCB-III. TISS has constructed a narrative of sustained ‘cumulative impact’, route curtailment and long-term decline in catch and income, purely on the basis of the self reported claims of the beneficiaries of compensation, which it is determined.

50.

To the contrary, the study by CMFRI was carried out consistently for a period of one year, covering all three seasons and the study area covered a distance of 3 km from both sides of Thane Bridge Creek site. Nine stations were fixed to undertake detailed survey for observation of the ongoing fishing activities in Thane Creek, collection of fish samples for diversity study alongwith collection of water samples. Three stations each were selected towards East and West directions from the proposed site of bridge construction, which were located along the proposed bridge length. The ongoing fishing activities and diversity was specifically noted in the report of CMFRI and very importantly, at the relevant time when the pile driving was ongoing, the report analysed its impact and noted that pile driving sounds at relatively close range of few kilometres did not cause free-ranging cod to leave an area, but they merely moved closer to scour-bed away from the sound source location.

The CMFIR report carried out a detailed analysis of community diversity to discern the species status during the different seasons to note that the highest value of Margalef richness was found in monsoon and lowest during winter, indicating that monsoon season is having high species diversity with abundances. Among the seasons, the taxonomic distinctness was found to be lowest in post-monsoon and highest in winter. The detailed report of CMFIR also contain a Cluster analysis of species assemblage from dol net fishery catch and SIMPER analysis was also carried out to identify the species that contributed to the similarity or dissimilarity between seasons, as it helped in supporting the reasons obtained in the hierarchical cluster analysis. By applying SIMPER analysis, it prepared a report showing descending order of dissimilarity in species composition in dol net fishing, by comparing it with other modes of fishing.

The conclusion of CMFRI clearly record that there is no dislocation/removal of dol net sus due to the ongoing TCB-III bridge construction during the study period and on either side of the bridge, dol net fishing operation was carried out at all seasons on existing sus locations.. Even the analysis reported that fishing by using hooks and crab trap was ongoing in the pillar construction area, which was also going on under the old TCB-I and TCB-II bridges though areas covered by the newly constructed pillars was not available for the fishing operations. As Dr.Sathe has placed before us an image depicting the three bridges over the creek, with the distance between the pillars, and from the photographs placed before us, it can be easily seen that fishing is not completely prohibited or do not become an impossibility as the shipping boats can pass between the pillars. However, in the report of TISS, we do not find the practical examination of the site, but the loss is estimated merely on the basis of the questionnaire, which is filled in by a class of fishermen to whom the compensation is to be paid.

The compensation derived by TISS is based on unverified self reported income and the methodology adopted by TISS was to collect information from the survey as to what was the income of the family/fisherman prior to construction of TCB-III and after its construction. However, it did not bother to collect any information maintained with the Fisheries Department or the Corporation and as the report record that the data was drawn from the income figures ‘reported by respondents during socio-economic survey’, which was derived solely from the affected fishermen even to the extent of fish catch and what was sold resulting into income. Neither the auction register or sale records are verified for determining the income as the catch is sold in the market under the supervision of Fisheries Department and it would have been possible to collect some data from the said Department.

We are also of the view that the mandate of TISS was to recommend compensation for fishermen affected by TCB-III, during construction and post completion, but TISS has travelled beyond its mandate and has also included livelihood security/support compensation and that too for a period of six years and this factor being determined without assessment of any impact on the livelihood or rehabilitation or pre-settlement in its true sense. We are surprised to note that TISS report has recommended a compensation of approximately Rs.141 crore, whereas the total cost of the project is Rs.500 crore, which is definitely disproportionate to the cost incurred in construction of TCB-III. Apart from this, MTHL is a 18.2 km sea bridge involving large-scale coastal reclamation and permanent alteration of near-shore fishing habitat across previously unencumbered fishing grounds. The Coastal Road project similarly involved permanent land reclamation into the sea, irreversibly extinguishing near-shore fishing access. TCB-III, by contrast, is a 1.83 km pier-supported bridge addition, constructed parallel to existing structures in a corridor that has borne three bridges since 1973, with no reclamation, no coastline alteration, and (as also recorded in CMFRI Report) continued fishing on both sides throughout construction.

Despite this categorical difference in project character, TISS has imported MTHL parameters into TCB-III without any reasoned calibration. The MTHL Project compensation reportedly amounted to a highest per capita compensation of approximately Rs. 5.80 lakhs per Project Affected Fishermen (per family), a project of 9.9 times the scale of the TCB-III. The computation as suggested by the TISS Report amounts to approximately 16 Lakhs per Project Affected Fishermen (per family).

Dr.Sathe would submit that, this computation ought to be outrightly rejected.

In fact when TCB-I and TCB-II alongwith the railway bridge were constructed, no compensation was ever claimed. In any case, by no means, we intent to suggest that the fishermen, who are impacted by the project, are not entitled for compensation, but the compensation to be awarded must be based on identification of actually affected families and it shall be computed on the basis of evidence based assessment of impact. Dr.Sathe, representing MSRDC, has submitted before us that it is not averse to paying compensation, provided by applying an appropriate mechanism and by calculating the actual extent of loss, the compensation shall be paid. He would submit that MSRDC has already deposited a sum of Rs.Ten crore, as directed by this Court towards interim compensation and the amount has been disbursed in coordination with the Fisheries Department, subject to the understanding that such ad-hoc compensation is subject to final orders and does not constitute an admission of extent of loss.

51.

In light of this, since we have noted that it is very much necessary to have the involvement of the Fisheries Department, as it is definitely in possession of some data to arrive at the income pattern of the Project-Affected fishermen. Similarly, we also desire to have examined the issue of lack of alteration of navigation, as Dr.Sathe has demonstrated before us that the spans of period of TCB-III, when juxtaposed with navigational spans of TCB-II and the railway bridge, do not impact the fishing activity at all.

In addition, we must also note a subsequent positive development that the State Government pursuant to the directions issued by this Court, has also come up with a policy through a Resolution of 09/03/2023 and the policy was formulated pursuant to constitution of Committee under the Chairmanship of Commissioner (Fisheries) as well as a Committee being constituted under the Chairmanship of Principal Secretary (Agri. and ADF Dept.) so as to formulate the state-wide compensation policy.

With a constitution of another Committee under the Chairmanship of Hon’ble Minister (Fisheries) to take decision on the proposed draft of State Level Compensation Policy, an overall assessment was carried out and the Cabinet has approved the state-wide compensation policy.

This policy focuses its attention on (1) Identification of (impact on livelihood) fishers; (2) Type of fishing vessels and other information; (3) Technical assessment and social impact assessment; (4) Base Line Survey by Implementing Agencies; (5) A Standard operating procedure; (6) Compensation to the fishers and (7) Grievance Redressal System.

52.

To achieve the aforesaid objectives, the Government Resolution also has set out the procedure to be followed and it contemplated securing a No-Objection Certificate from MCZMA, CRZ and Mangrove Cell while executing constructions projects and now it is also directed that it shall be mandatory to carry out a social impact assessment through a Government approved agency and a technical evaluation through National Accreditation Board for Education and Training (NABET).

The standard operating procedure is also set out, which must be carried out before implementing the project and it contemplate the following :-

“* Seeking advice through competent technical institutions like CMFRI, FSI, NIO so that the construction of the project does not affect the nearby fishing.

* To give necessary prior notice for the movement and safety of fishing vessels.

* Avoid construction activity during the breeding season and near the breeding area.

* To provide alternate means of livelihood.

* To constitute a separate grievance redressal mechanism regarding the project by implementing agency.

* To arrange CCTVs for transperancy at the project site as well as to make the project information available on the website in an online format.”

Dealing with the aspect of the compensation to the fishers, six categories have been identified dependent upon the impact of intensity and it also contemplate revision in the amount of compensation from time to time on the basis of Consumer Prince Index, considering 2021 as the base year.

The six categories set out in the Government Resolution are culled out thus :-

ScaleMatterCompensation Amount (Rs.)
C1Permanent Loss of fishing areaRs.6,00,000
C2The area within a radius of 500 mts from the projectRs.4,00,000
C3Loss due to restricted movement of subsistence level fisher folk for handpickingRs.2,00,000
C4Loss of fishing time and increased operating cost (fuel) to reach fishing grounds due to ongoing constructionRs.1,00,000
C5Loss of fish due to increased turbidity during construction. This is a temporary impact, causing temporary lossRs.50,000
C6Damage to fishing boats and nets due to movement of bargesRs.25,000
53.

Through the Government Resolution dated 09/03/2023, we find that the State Government itself has now formulated state-wide compensation policy for the Project-Affected fishermen, which promises to pay compensation ranging from Rs.6,00,000/- to Rs.25,000/- dependent upon the impact of intensity and in case of permanent loss of fishing area, a lumpsum compensation of Rs.6,00,000/- is declared whereas the area within the radius of 500 mts from the project fetch a compensation of Rs.4,00,000/-

With this progress that had occurred during the pendency of the Petitions, instituted in the year 2021 and now the State itself having evolved policy for payment of compensation for the Project-Affected fishermen due to construction of TCB-III and when MSRDC, the project proponent, has already paid a compensation of Rs.Ten crores by way of interim measure, we deem it appropriate to constitute a Task Force under the Chairmanship of Principal Secretary, Agriculture, Dairy Development, Animal Husbandry and Fisheries Department, with the Commissioner of Fisheries being the Secretary of the Task Force. Since we have two reports before us prepared by Central Marine Fisheries Research Institute (CMFRI) as well as Tata Institute of Social Sciences (TISS), the Task Force shall comprise of two members to be nominated by CMFRI and TISS respectively, as we are of the view that the report of both the Agencies, with whatever shortcomings we have noted, will definitely give assistance in determining the actual compensation payable.

The Task Force shall also include the Commissioner of Navi Mumbai Municipal Corporation.

We permit the Committee, which shall work as a Task Force, to arrive at an amount of compensation payable by taking into consideration the fact finding reports of CMFRI and TISS, which shall provide guidance to the said Committee, but we direct the Committee to have an assessment of the factual situation on site before it arrive at a figure of compensation that is payable. The identification of the families, which are impacted, shall be undertaken with the assistance of the Fisheries Department and for ascertaining the income loss, which definitely would involve a herculean task, the necessary data from Fisheries Department as well as the information available as regards to these families and the Corporation is also permitted to be called for by the Committee.

In addition, we permit the Secretary of the Committee to include and have the involvement of any authority/agency, which it deem appropriate. Needless to state that the MSRDC, which is the project proponent, shall be an integral part of the Committee.

We expect the Committee to determine the amount of compensation and expect it to be in tune with the policy formulated by the State Government.

This exercise is expected to be completed as expeditiously as possible within a period of six months from today, as we are of the view that fishermen community, which definitely is impacted to some extent by construction of TCB-III, cannot be made to wait too long.

With these directions, we dispose of the Petitions alongwith all the pending Interim Application(s).