High CourtsSingle Bench(2026) 11 SHI CK 2835

M/s Rikhi Resorts Private Limited vs State Of Himachal Pradesh

High Court Of Himachal Pradesh, Shimla · Decided on 16 November 2026

HON’BLE JUDGES
Sandeep Sharma, J
RESULT
Disposed Of
CASE NUMBER
CWP No.10130 of 2026
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Judgment

33 paragraphs · 3,860 words
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Sandeep Sharma, J. (Oral)

Being aggrieved and dissatisfied with order dated 2.4.2026 passed by learned Financial Commissioner (Appeals), Himachal Pradesh, in Revision Petition No. 152 of 2018 titled as State of Himachal Pradesh through District Collector, Solan versus M/s Rikhi Resorts Private Limited, whereby order dated 29.8.2017 passed by learned Divisional Commissioner, Shimla Division, Shimla, H.P. in Case No. 262 of 2015, upholding order dated 25.7.2014 passed by learned District Collector, Solan in Case No. 23/13 of 2009, came to be reversed, petitioner has approached this Court in the instant proceedings filed under Article 226 of the Constitution of India, praying therein for following main relief:

“(a)

Setting aside impugned Order dated 02.04.2026 (Annexure P-12) passed in Revision Petition No. 152 of 2018 by Learned Financial Commissioner (Appeals), Himachal Pradesh and consequently to restore the Order dated 25.07.2014 (Annexure P-8) passed by Learned Collector Solan, District Solan (HP) whereby the proceedings under Section 118 of the H.P. Tenancy and Land Reforms Act have been ordered to be dropped.”

2.

Quintessential facts of the case, as emerge from the pleadings as well as material adduced on record by respective parties are that petitioner herein was granted permission by respondent-State under Section 118 of the H.P. Tenancy and Land Reforms Act, 1972 (hereinafter referred to as 'the Act') to purchase land comprising Khasra Nos. 162, 163, 166 and 167, Kita 4, measuring 05-10 bighas, situate at Village Sakori, Tehsil Kandaghat, District Solan (hereinafter referred to as 'suit land') vide letter No. Rev:2F(10)-167/93 dated 24.1.1994 for construction of hotel/resort (Annexure P-2).

3.

Since petitioner allegedly failed to start construction and put the land in use within a period of two years, District Collector, Solan initiated proceedings against it in the year 2009 for vestment, however, afore Authority, after having heard the parties and perused record dropped the proceedings vide order dated 25.7.2014 passed in Case No. 23/13 of 2009 (Annexure P-8).

4.

Being aggrieved and dissatisfied with aforesaid order passed by learned Collector, respondent-State filed Appeal No. 262 of 2015 in the Court of learned Divisional Commissioner, Shimla, which also came to be dismissed vide order dated 29.8.2017 (Annexure P-10). In the aforesaid background, respondent-State filed Revision Petition bearing No. 152 of 2018 in the Court of learned Financial Commissioner (Appeals), Himachal Pradesh, against order dated 29.8.2017 passed by Divisional Commissioner, Shimla, which came to be allowed vide order dated 2.4.2026 (Annexure P-12). Being aggrieved and dissatisfied with aforesaid order passed by learned Financial Commissioner, petitioner has approached this Court in the instant proceedings, praying therein for relief as has been reproduced hereinabove.

5.

Precisely, case of the petitioner as has been highlighted in the petition and further canvassed by Mr. Bhupinder Gupta, learned Senior Advocate duly assisted by Mr. Janesh Gupta, Advocate representing the petitioner, is that learned Financial Commissioner (Appeals), while passing impugned order, has fallen in grave error inasmuch as setting aside concurrent findings of fact and law recorded by two Courts below. While making this Court peruse communication dated 24th January, 1994 (Annexure P-2), whereby petitioner was accorded permission under Section 118 of the Act to purchase land, Mr. Gupta states that at no point of time condition, if any, with regard to putting up the land in question to use within a period of two years ever came to be communicated to the petitioner and as such, there was no occasion, if any, for learned Financial Commissioner to set aside the well reasoned orders passed by the Courts subordinate to it. Mr. Gupta further states that order passed by learned Collector as well as Divisional Commissioner clearly reveals that the petitioner successfully proved on record that land permitted to be purchased under Section 118 of the Act was put to use within a period of two years from the date of grant of permission. He submits that petitioner started the construction of hotel by constructing 350-400 meter road length as well as some labour huts, but on account of adverse circumstances and death of Managing Director of the project, work could not proceed further. He states that since with the construction of road as well as laying of pillars, land was put to use within stipulated time of two years, there was no occasion for learned Financial Commissioner to pass order impugned in the instant proceedings. He contends that failure, if any, to commence the construction within stipulated time should be on account of conscious default, negligence or refusal on the part of person concerned, but where the non compliance was for the reason beyond the control of the person in whose favour permission was granted or due to the fact that it was incapable or impossible of performance due to other provisions of law in force, it is not permissible for respondent-State to order vestment and as such, there was no occasion, if any, for learned Financial Commissioner to order vestment in terms of provisions contained under Section 118(2) of the Act. In support of his aforesaid submission, Mr. Gupta placed reliance upon the judgment dated 22.8.2023 passed by this Court in CWP No. 5544 of 2020 titled as State of Himachal Pradesh versus M/s Barog Resorts Pvt. Limited and judgment dated 26.2.2026 passed by coordinate Bench of this Court in CWP No. 1182 of 2026 titled as State of Himachal Pradesh versus M/s Noble House Creation Pvt. Ltd.

6.

To the contrary, Mr. Rajan Kahol, learned Additional Advocate General, while supporting impugned order passed by learned Financial Commissioner, submits that since orders passed by the Collector as well as Divisional Commissioner were based upon wrong interpretation of statute as well as facts, no illegality can be said to have been committed by learned Financial Commissioner while setting aside the concurrent findings recorded by two Courts below. He states that though there was no specific stipulation made in the permission letter with regard to use of the land within a period of two years from the date of grant of permission, but once statute itself provides that land ordered to be purchased in terms of Section 118 shall be put to use within a period of two years or for a further such period not exceeding one year coupled with the fact that petitioner failed to put the land in use for two years, learned Financial Commissioner rightly ordered vestment of the land in question. He further states that omission, if any, on the part of the State to make stipulation in permission letter with regard to two years' time period is of no consequence because permission letter cannot override provisions of the Act, which clearly provide that land ordered to be purchased under Section 118 of the Act is required to be put to use within a period of two years from the grant of permission. Mr. Kahol further states that revenue authorities specifically reported that land in question was not put to use for two years after its purchase and mere construction of huts may not be sufficient to conclude commencement of construction.

7.

I have heard the learned counsel for the parties and gone through the records.

8.

Having heard learned counsel for the parties and perused the material available on record, this Court finds that vide communication dated 24th January, 1994 (Annexure P-2), permission was granted to the petitioner for purchase of land for establishment of a resort, but there is no condition contained in the aforesaid communication with regard to time period. Though aforesaid letter suggests that land permitted to be purchased under Section 118 shall be used for purpose for which permission is accorded, but it nowhere stipulates that same is to be put to use within a period of two years from the date of grant of permission.

9.

Though Mr. Rajan Kahol, learned Additional Advocate General, attempted to argue that since aforesaid permission was granted under Section 118 subsection (2) of the Act, omission, if any, on the part of authority responsible for issuing aforesaid letter to make specific mention with regard to time frame is of no relevance, but this Court is not persuaded to agree with him for the reason that the applicant, who had applied for permission to purchase land under Section 118, cannot be expected to go through the provisions of law under which permission is granted, rather, he or she is under obligation to abide by the terms and conditions contained in the permission letter. Once it was specifically mentioned in the permission letter that land shall be used for purpose for which permission is accorded, it is not understood that why specific condition with regard to time frame was not incorporated in the permission letter.

10.

Moreover, in the instant case, the District Collector, after having initiated proceedings for vestment, conducted inquiry through revenue agency and found that within a stipulated period of two years, petitioner had put the land to use by constructing 350-400 meter road length. Petitioner proved before aforesaid authority by leading cogent and convincing evidence that besides having constructed 350-400 meter road length, foundation of pillars of project was also laid, but further work could not proceed on account of death of the Managing Director of the project.

11.

Though learned Additional Advocate General, argued that as per provisions contained under Section 118(2) of the Act, land was not put to use for which permission was granted within stipulated time, because permission was granted for construction of resort and mere construction of road and huts for labour cannot be said to be commencement of work, rather entire construction of resort should have been completed within specified period of two years, however, this Court is not convinced with the aforesaid submission of learned Additional Advocate General for the reason that a resort cannot be constructed in one go, rather construction is to be carried out in a phased manner. Petitioner with a view to construct a resort, first of all, constructed road and thereafter constructed huts for labour. Apart from raising afore construction, it also laid foundation for pillars. All the aforesaid development activities were actually towards the construction of a resort because before undergoing aforesaid development activities, there was no possibility for the petitioner to complete the construction of the resort, for which the permission was granted.

12.

In M/s Barog Resorts Pvt. Limited (supra), this Court had an occasion to deal with a similar situation and this Court, having taken note of judgment passed by Division Bench of this Court in case titled as Ravinder Chauhan and others v. State of Himachal Pradesh and others, AIR 1999 Himachal Pradesh 43, held that when the statute contemplated the failure on the part of a person who has been granted permission to purchase, as a condition precedent for bringing into force of the operation of vesting clause, the failure should be on account of conscious default, negligence or refusal on the part of person concerned and where the non compliance was for the reason beyond his control or due to the fact that it was incapable or impossible of performance due to other provisions of law in force, it is not permissible for respondent-State to order vestment in terms of provisions contained under Section 118(2) of the Act. Relevant para of the aforesaid judgment reads as under:

“19.

In the light of the above provisions of the Statute and the Rules in force, it becomes necessary for us to consider as to whether the plea raised on behalf of the petitioners that the vesting envisaged under the second proviso to Clause (i) of Sub-section (2) of Section 118 of the Act is automatic and instant on the expiry of the period or it will depend upon on further adjudication by any competent authority before such vesting could be said to have taken place in a particular case. Rule 38-B inserted as noticed above, with detailed provisions in this regard, which were found finally notified on 24-3-1993 was also earlier notified on 14-12-1992 vide notification No. 10-5/75-Rev-B-Vol. III dated 3-11-1992. The subsequent rules provide a guideline and assistance of the manner in which a penal provision of the nature engrafted under the second proviso to Clause (i) of Sub-section (2) of Section 118 of the Act has to be construed. That becomes obvious and necessary even de hors the Rule 38-B and in our view the said rule has been really inserted to make the provision in the Act more reasonable, to protect the main provision in the Act itself from being rendered vulnerable for a challenge under Article 14 of the Constitution of India. The conditions stipulated for being satisfied in the second proviso to bring into operation the vesting clause or the provisions of the rule itself provide ample basis and guidance as to how the said provision has to be construed. In our view, it is not that on the mere expiry of a period of two years, as may be granted by the State Government or a further period not exceeding one year that the vesting will automatically take place. The legislative intention apparently keeping in view of the drastic and penal nature and far reaching consequences of such vesting clause has been thoughtfully, carefully and meticulously expressed in engrafting a condition stipulating 'if he fails to do so', which in our view will operate as a condition precedent for actual vesting. The failure on the part of the person favoured with a permission under the provision, therefore, is the vital and pivotal fact which brings into operation the vesting clause and consequently it is but necessary and essential that some authority must place on record the failure on the part of the persons, who have been favoured with the permission after an objective consideration of the matter and such finding can be recorded only after complying with the principles of natural justice by giving an opportunity to the persons concerned before condemning them. What Rule 38-B has proposed to do is nothing but giving statutory recognition by means of prescription of a rule to the otherwise essential, vital and necessary procedure as a measure of safeguard to be observed in terms of the principles of natural justice, too, before visiting a citizen with such penal and far reaching consequences involving substantial property rights. In our view when the statute contemplated the failure on the part of the person, who has been granted with permission to purchase, as a condition precedent for bringing into the force of the operation of the vesting clause, the failure should be on account of the conscious default, negligence or refusal on the part of the person concerned and where the non-compliance was for reasons beyond his control or due to the fact that it was incapable or impossible of performance due to the operation of other provisions of law in force and that the authorities, who accorded the permission with such conditions, which are not capable of being complied with and performed and were equally at fault, it is not permissible for the respondents or for that matter any body from public including the petitioners to insist or assert that despite the obvious and for no fault of the 6th respondent, he should be condemned as having failed to comply with the conditions, that which otherwise he could have complied with, and thereby take over his property by enforcing the vesting clause engrafted in the second proviso.”

13.

As has been discussed hereinabove, petitioner had started the work of construction of resort well within stipulated period of two years, but it was unable to complete the same within two years on account of death of its Managing Director, which fact has otherwise not been disputed by respondent-State.

14.

Coordinate Bench of this Court in M/s Noble House Creation Pvt. Ltd (supra), while taking note of judgment passed by Division Bench of this Court in Ravinder Chauhan (supra), has held that vestment could not be automatic and due and proper inquiry is required to be carried out. It has further been held that words "shall put the land to use for which the permission has been granted" are not to be interpreted myopically, rather, intent of legislation behind Section 118(2) was to ensure that steps are taken to put the land to use for purpose for which permission is granted before the expiry of period prescribed in the statute. Relevant paras of the aforesaid judgment read as under:

“15.

It is a matter of fact that the world faced great recession during the period between 2008 and 2013. This also got reflected in fall of Indian Stock Market thereby affecting the cash flow to the project. It is apparent from the communications discussed above that the developers made all out efforts to source funding both from the Financial Institutions as well as from the Stock Markets but due to recession, the funding was refused to the developers which is proved from the above communications. This fact has also been taken into consideration by the Ld. Collector at page-20 and has observed:

"His plea that he could not start the construction due to economic recession is too general and vague in the absence of specific documentary evidence. There is nothing specific on record that the respondent was prevented from starting the construction because of economic downturn."

It appears that at the stage of the case before the District Collector, the appellant could only produce the copies of reports of the Stock Market as well as communications on e-mail with the Stock Market to prove his point, however, he did not produce any communication from the banks refusing the grant of loan to him. He later obtained the copies of communications sent to him by the banks and submitted the same at the stage of arguments which go to prove that he not only approached the banks and Stock Market but did it well in time i.e. in the year 2009-10 immediately after getting approval from the State and within the specified period of two years. The refusal on the part of the financing agencies has clearly been on account of recession.

16.

It may also be appropriate to summarize as to what the appellant has done so far and what else he could have done.

What he had done:-

Signed M.O.Us for architectural designs and construction of the project;

Approached banks and Stock Market for loans and share capital;

Constructed 1.5 km. road;

What else could have been done:

Informing the Govt. and obtaining extension;

Obtaining necessary permissions under various law. (It has been pleaded that TCP permission was Annexure R-18).

Getting the land partitioned (though the process seems to have been initiated but was not taken to a logical end).”

In view of the concurrent findings of facts returned by the two revenue authorities below which do not call for any interference, it was justly concluded that the default on the part of the respondent could not be held to be conscious negligence so as to order vestment of the land in the State. Reliance upon Ravinder Chauhan and others versus State of H.P AIR 1999 HP 43 was justly placed for holding that merely because respondent could not start the actual construction of the resort within two years from the date of execution of the sale deed for which he was granted permission under Section 118 of the Act would not result in automatic vestment of the land in the State. Here it would also be pertinent to take note of M/s Springdale Resorts and Villas Pvt. Ltd. versus State High Court of Himachal Pradesh and Others (CWP No.3363/2025, decided on 26.09.2025) wherein while relying upon Ravinder Chauhan, it was observed that the words “shall put the land to such use for which the permission has been granted” are not to be interpreted myopically. Period of two years prescribed in the Statute cannot be construed in myopic manner so as to mean that everything with regard to the project has to be completed before the expiry of the period. The intent of legislation behind Section 118(2) was to ensure that steps are taken to put the land to use for the purpose for which the permission is granted before the expiry of the period prescribed in the Statute. The Court also took judicial notice of the fact that various permissions are granted under Section 118 of the Act for big and small projects by the State Government. For coming up of these projects, many further permissions/approvals/ sanction are required from several departments/ authorities. Various other formalities are also needed to be completed. The actual construction work can start only after all the permissions are in place in favour of the proponent. Therefore, if the words “shall put the land to such use for which permission has been granted” are given strict interpretation i.e. the entire project activities shall have to be completed from A to Z within the period mentioned in the second proviso to Section 118(2) of the Act, in such scenario majority of the projects would fall in the trap paving way for vestment of the land in State. Therefore, only meaningful interpretation can be given to these words. That beneficiary of the permission has to demonstrate taking cogent and meaningful steps for putting the land to use for the purpose for which the permission was granted and if this test is satisfied, the same has to be construed and read that the permission holder has put the land to such use for which the permission was granted. In the instant case, the respondent has taken steps for putting the land to use. It is not the case of the petitioner that respondent had diverted the land for any other use. The mechanical order passed by the District Collector ordering vesting of respondent’s land in the State on the ground of it having failed to construct resort within period of two years was rightly set-aside by the higher authorities. As observed earlier, two authorities below on the basis of facts have concurrently held that respondent cannot be held guilty of conscious default, negligence by correctly applying the principles laid down in Ravinder Chauhan. The impugned orders therefore do not call for any interference. Petition is dismissed. Pending miscellaneous application(s), if any, shall also stand disposed of.”

15.

During proceedings of the case, learned counsel representing the petitioner apprised this Court that substantial work has been already done on the site and entire work can be completed within a period of one and a half year.

16.

Consequently, in view of detailed discussion made hereinabove as well as law taken into consideration, this Court finds merit in the present petition and accordingly, same is allowed. Impugned order dated 2.4.2026 passed by learned Financial Commissioner (Appeals) is quashed and set aside and petitioner is permitted to complete the construction within a period of one and a half year from the date of passing instant order, failing which property otherwise ordered to be purchased in terms of Section 118(2) will vest in the State of Himachal Pradesh.

In the aforesaid terms, present petition is disposed of along with pending applications, if any.