Ludhiana Sangrur Infra Road Private Limited vs DCIT

Income Tax Appellate Tribunal, Delhi · Decided on 30 July 2026

HON’BLE JUDGES
S. Rifaur Rahman, Accountant Member · Vimal Kumar, Judicial Member
RESULT
Allowed
CASE NUMBER
ITA No.1421/DEL/2022

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

CourtKutchehry membership

More clarity. Every judgment.

Download court copies, explore connected cases and make more of every research session.

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

Judgment

98 paragraphs · 6,170 words

O R D E R

PER S.RIFAURRAHMAN,AM:

1.

This appeal filed by the assessee is directed against the assessment order dated 28.04.2022 passed by the DCIT, Central Circle, Faridabad-1 under section 143(3) read with section 144(C)(13) of the Income-tax Act, 1961 (for short ‘the Act”) for Assessment Year 2017-18 pursuant to the directions of the Dispute Resolution Panel u/s 144C (5) of the Act raising the following grounds of appeal :-

“1 That the Assessment order dated 28.04.2022 passed u/s 143(3) r.w.s. 144C(13) of the Income-Tax Act, 1961 (hereinafter called "the Act") by the Ld. Deputy Commissioner/Assistant Commissioner of Income Tax, Central Circle, Faridabad-1, New is against the law and facts on the file in as much as he has gravely erred in computing total Income of Rs. 9,05,66,367/- as against returned income of Rs. Nil.

2 That the order dated 21-03-2022 passed by Ld. Dispute Resolution Panel - 1, New Delhi is against law and facts on the file in as much as it has gravely erred in issuing directions u/s 144C(5) of the Act by ignoring the facts of the case and position of law.

3 That the orders dated 06.01.2021 passed by the Ld. Transfer Pricing Officer u/s 92CA(3) of the Act and that dated 21-03-2022 passed by Ld. Dispute Resolution Panel - 1, New Delhi are against law and facts on the file as both the Ld Transfer Pricing Officer and Dispute Resolution Panel-1, New Delhi have:-

(i)

failed to understand and appreciate the nature of business of the Appellant Company which led them to apply a wrong set of filters and comparables, in turn, leading to wrong and misleading conclusions;

(ii)

misconstrued the nature of business of the Appellant Company as "construction and maintenance of broadways, roads, bridges" as against "operating and maintaining of the toll highway" which is its main and exclusive business activity.

4.

That the order dated 06.01.2021 passed by the Ld. Transfer Pricing Officer is against law and facts on the file in as much as he was not justified:-

(i)

in arbitrarily holding at -

(a)

Para 5.4 of his order that 'development', or 'maintenance and operation' or 'development, maintenance and operation' is the core business of the assessee for which it is claiming deduction u/s 80-IA and not toll collection", without appreciating the fact that the assessee is specifically eligible for deduction under sub-clause (ii) of clause (i) of Section 80-IA(4), i.e., "operating and maintaining" and not under sub-clause (iii) of clause (i) of Section 80-IA(4), which is, "developing, operating and maintaining";

(b)

Para 5.7 of his order that the Appellant Company has been granted a project to "construct the highway" by ignoring the fact that it had only been granted a project to "operate and maintain the project highway" in accordance with the provisions of the Concession Agreement;

(ii)

while applying the Transactional Net Margin Method (TNMM), to arbitrarily select the companies engaged in "construction and maintenance of roadways" and "construction of roads, bridges" by ignoring the fact that the Appellant Company is only engaged in the business of "operation & maintenance of project highway and toll collection" and is eligible for deduction under sub-clause (ii) of clause (i) of Section 80-IA(4), i.e., "operating and maintaining" and not under sub-clause (iii) of clause (i) of Section 80-IA(4), i.e., "developing, operating and maintaining" and by arbitrarily ignoring the submissions made on behalf of the Appellant Company and rejecting its plea to shift the search base from construction and maintenance of roads, bridges, etc. to ‘toll revenue’.

5.

That the orders dated 06.01.2021 passed by the Ld. Transfer Pricing Officer u/s 92CA(3) of the Act and that dated 21-03-2022 passed by Ld. Dispute Resolution Panel - 1, New Delhi are against law and facts on the file as both the Ld Transfer Pricing Officer and Dispute Resolution Panel-l, New Delhi were not justified:-

(i)

in arbitrarily and unjustifiedly holding that the distribution of profits between the Appellant Company and its Associated Enterprise (AE) based upon the "Common Schedule of Rates" {CSR} published by "Punjab Roads and Bridges Development Board" {PRBDB} is, allegedly, not distributing income and profits from the project at arm's length.

(ii)

to propose an adjustment of Rs.9,05,66,367/- to the business income of the Appellant Company on account of Transfer Pricing adjustment u/s 92CA(3) of the Act by rejecting the "Other method as prescribed by Rule 10AB of the Income Tax Rules, 1962" for determining the Arms's Length Price (ALP) as adopted by the Appellant Company and applying the Transactional Net Margin Method {TNMM} with the Appellant Company as tested party and Operating Profit/Operation Revenue{OP/OR} as Profit Level Indicator (PLI).

(iii)

arbitrarily rejecting the CSR prescribed by the PRBDB and mentioned in the "Concession Agreement for Operation, maintenance and Transfer" awarded by PRBDB to the Appellant Company and holding that CSR is not acceptable as a, method for determination of "Arm's Length Price" (ALP).

6 That the order dated 06.01.2021 passed by the Ld. Transfer Pricing Officer is against law and facts on the file in as much as he was not justified in holding that the Assessee has also failed to file provided following details which could prove that it paid its 'AE' at CSR rates whereas the fact of the matter is that complete details were duly filed during the proceedings :-

(a)

Rates charged by 'AE', quantity, total amount charged by AE and their comparison with CSR published by PRBDB';

(b)

Rates charged by non-AE, quantity, total amount charged by AE and their comparison with CSR published by PRBDB;

(c)

Copies of relevant extract of CSR whereas the fact of the matter is that complete details were duly filed published by PRBDB.

7 That the Transfer Pricing order dated 06.01.2021 passed by the Ld. Transfer Pricing Officer is against law and facts on the file in as much as he was not justified to arbitrarily state in Paragraph 6 that it was not proved that :-

(a)

the Assessee was statutorily required to pay expenses only as per CSR published by PRBDB and it was not legally allowed to pay expenses more that this amount;

(b)

the payment as per CSR is payment at ALP or at market price.

8 That the Ld. Transfer Pricing Officer vide its order dated 12-04-2022 giving effect to directions of Hon'ble Dispute Resolution Panel u/s 144C has failed to correctly follow the specific directions of the Ld. Dispute Resolution Panel as to certain comparable companies identified by the Ld. Transfer Pricing Officer to be considered only if their segmental data is available by considering those companies in giving effect to order of Ld. Dispute Resolution Panel even though the segmental data in respect thereof was not available.

9 That the Ld. Assessing Officer has erred in charging interest u/s 234B and 234C of the Act.

10 That the Ld. Assessing Officer has erred in initiating penalty proceedings u/s 270A(2) r.w.s 271A(6) of the Act.”

2.

Brief facts of the case are, assessee filed its return of income declaring income of Rs.Nil on 03.11.2017. The case was selected for scrutiny through CASS. Notices under section 143(2) and 142 (1) of the Income-tax Act, 1961 (for short ‘the Act’) were issued through ITBA portal and in response to these notices, assessee filed relevant information. During assessment proceedings, the AO observed that the assessee is having specified domestic transactions with Associated Enterprises (AEs) within the meaning of Section 92B of the Act. Accordingly, the case was referred to Transfer Pricing Officer (TPO) after taking relevant approval from PCIT, Hisar. Accordingly, the TPO issued notices u/s 92CA (2) of the Act and in response, ld. AR of the assessee attended and submitted the information as called for.

3.

At the time of hearing, ld. AR of the assessee brought to our notice relevant facts of the case and submitted his submissions as under. Ld. AR submitted that Punjab Roads and Bridges Development Board ("PRBDB") under World Bank Aid had developed/ upgraded the Ludhiana - Malerkotla Sangrur Road having a length of 71.352 km. PRBDB under PPP model floated a "Request for Proposal" ("RFP") to allot Operation, Maintenance and Transfer ("OMT") of the said highway and copy of the relevant extracts from the said contract are enclosed at pages 166-185 of the paperbook. He submitted that scope of the project -Article 2 (Page No. 167 of the Paper Book) and the Project facilities that the appellant was to build is described in Schedule B at pages 173 - 175 of the Paper Book. He further submitted that the entire activity consisted not of construction of road but the construction of the project facilities such as toll plazas, roadside functions, street lighting, landscaping, traffic and first aid parts etc. which were to improve the standards of maintenance and operation level so as to make the road toll able as can be seen from Schedule B.

4.

Further, ld. AR submitted that assessee sub-contracted the work partly to its AE related party (M/s Gawar Constructions Limited) and to an unrelated third party (M/s Ceigall India Limited). He submitted that payments to both the companies were made as per the Common Schedule of Rates (CSR) prescribed by Public Works Department, Buildings and Roads Branch, Patiala, Government of Punjab and copy of the CSR rates placed at page 271of the paper book. He submitted that since the payments made to Gawar Constructions Ltd. were at CSR, the aassessee company used "such other method" as prescribed by Section 92(1)(f) r.w.r 10BA as the most appropriate method for arriving at the Arm's Length Price (ALP). He further submitted that charges paid to Gawar Constructions Ltd. can also be justified using Comparable Uncontrolled Price (CUP) Method since identical third-party contracts (i.e. with Ceigall India Ltd, an unrelated third party) were also entered at the same rates as with the AE i.e. at the CSR approved by the Governmentt and summary reflecting the comparison of these is at pages 271 of the paper book.

5.

Further, he submitted that the rates as agreed vide the agreements with both the parties is enclosed at pages 254-264 for Gawar Constructions Ltd and at pages 265-268 for Ceigall India Limited (the unrelated party).

6.

Ld. AR further submitted that points of contention of the Ld. TPO are :

•

TPO vide order dated 06.01.2021 rejected the "Other method and applied Transactional Net Margin Method (TNMM").

•

Under TNMM, TPO compared the PLI margin of the Assessee Company, engaged in "operation and maintenance" of a toll road with the margins of the companies engaged in "development, operation & maintenance" proposing adjustment of Rs 9,37,61,612/- stating affairs between the Assessee Company and its related enterprise have been so arranged to show that the Assessee Company is earning super natural profits.

•

The Ld. TPO also alleged that the appellant did not provide the information pertaining to the CSR Rates and therefore the said method cannot be accepted.

7.

Ld. AR further summarised the various averments and arguments made on behalf of the Assessee are as under:-

1.

The Ld. Transfer Pricing Officer has misunderstood and failed to appreciate the basic nature of business of the Assessee Company. The Ld. Transfer Pricing Officer failed to appreciate that the Assessee Company is engaged in the business of "Operating and Maintaining of an existing road and Toll plaza" and maintaining the same and not in construction and development of roads.

2.

The Ld Transfer Pricing Officer has erroneously rejected the CUP method and applied TNMM. Alternatively, without prejudice, even if TNMM is proposed to be applied it should be based on the comparable companies which are specifically engaged in the business of operation and maintenance of toll roads and collection of toll thereon and not construction of highway, bridges, etc.

3.

The Ld. Transfer Pricing Officer has failed to appreciate that the rates given to AE are as per CSR rates which are prescribed by Government and are a valid comparison under the provisions of the Act and which are also the rate given to non- AE. Summary of rates charged by AE and Non AE in a comparative table are at pages 271 of the Paper Book.

4.

The Ld Transfer Pricing Officer while applying TNMM did not apply the correct filters for arriving at the parties search upon in as much as the nature of business activities of the Assessee Company and searched parties are altogether different and not comparable at all. The filters and the comparable companies that the appellant applied are provided in its reply dated 09.12.2020 before the Ld. Transfer Pricing Officer (refer pages 151-159 which reveal that the comparable range of OPIOR was 30.58 - 49.54 % (Refer Pages 158-159 of the Paper Book) and that the OPIOR of the Appellant Company was 32.59% which was well within the comparable range.

5.

The Ld. Transfer Pricing Officer has' misconstrued the basic facts of the case in as much as the Assessee Company has claimed deduction u/s 80-IA(4)(i) (b)(ii)and not u/s 80-IA(4)(i)(i) of the Act.

6.

The conclusion drawn by the Ld Transfer Pricing Officer that the intention of the Assessee Company is to show higher rate is not tenable since there is no loss to revenue even if the same business activities were carried out by the AE. The assessee is 100% subsidiary of the AE and if the same business was carried out by the AE, the AE would be allowed the same rate of deduction u/s 80-IA (1) and there is no loss to revenue in any case.

7.

The Id. Transfer Pricing Officer has alleged that the information was not filed before him during the course of the Transfer Pricing proceedings. Various submissions were made and these details were filed vide letters dated05.10.2020, 09.12.2020 and 11.12.2020, a copy of which is enclosed at pages 143 to 162 of the Paper Book wherein at Pages 149-159 and Para 5 and 6 it is clearly mentioned that these details are being filed before him.

8.

It is further submitted and clarified that road construction was already done by the PRBDB and the appellant company was only given a contract to operate and maintain the said road. The total investment in Fixed Assets was to the tune of Rs.18.70 crores as per Note-8 to the Financial Statements as reproduced by the Ld. TPO at page 44 of his order.

9.

The margins of the appellant company are governed by the number of commuters and hence there would be higher margins in the year when there are more commuters. Infact in the year there was Covid the entity went through a loss as is evident from the summary enclosed at pages 275 of the paper book along with relevant audited profit and loss account for the years displayed enclosed at pages 276-291 of the paper book.

10.

It is also submitted that the appellant has continued to make the said claim in subsequent years and there has been no tinkering and hence on the ground of consistency also there should not be any adjustment to the profits of the appellant.

8.

On the other hand, ld. DR of the Revenue brought to our notice pages 2 to 5 of the TPO order and further brought to our notice findings of the TPO at page 45 of the paper book. Further, ld. DR submitted the written submissions which are reproduced below :-

A. Functional 'profile: Before proceeding further, reference is first invited to the functional profile of the assessee company and its AE, as given in PARA 3.1./ page 18 of the of the TP study report (Page no 65 of paper book). Being pertinent, the same as reproduced below:

3.1.

Functions Performed Various functions performed by LSIR and its AE as under:

•

Bidding and Assigning - The first stage for development of project is bidding. AE was involved in bidding for the operation maintenance & transfer of Ludhiana-Malerkotla-Sangrur road on PPP model. AE has entered into contract and LOA (Letter of Acceptance) was issued to AE by PRBDB. After receipt of LOA, AE requested to PRBDB for awarding contract to LSIR. The request was accepted by PRBDB & accordingly PRBDB entered into contract with LSIR. Both LSIR and AE are involved in Bidding and Assigning of the contract.

•

Construction - After tender has been assigned to the concessionaire the next step is construction of roads and highways as per the specifications. LSIR has subcontracted the construction of the roads to AE (Gawar Constructions Limited) and Non-AE (Ceigal India Limited).

•

Maintenance - Once the construction is completed next stop would be to maintain the roads and highways as per the set guidelines of the authority.

LSIR has subcontracted the construction and maintenance work to its AE.

•

Toll Collection - Once the construction of the road is completed, which is on PPP model, Toll will be collected by LSIR.

From the perusal of functional profile,. it is seen that the Concessionaire agreement is for the operation, maintenance and transfer of Ludhiana- Malerkotla-Sangrur road. It is an undisputed fact, that the bidding for the project was done by the AE of the assessee company i.e. M/s. Gawar Constructions Limited and project was also awarded to the AE only. In fact, on the request of the AE the contract awarding agency i.e PRBDB has awarded the contract to LSIR which is, again 100% owned by the AE i.e. Gawar Constructions Limited. After the contract has been awarded, the assessee company i.e. LSIR has again subcontracted the construction work to AE i.e. M/s. Gawar Constructions Limited and some part of it to non AE i.e. Ceigall India Limited. Again an admitted and accepted fact is that, after construction of the road and other ancillary things, the assessee company i.e. LSIR has again subcontracted the operation and maintenance work to AE only.

The sum and substance of the entire functional profile of the assessee, as well as its AE it is that the entire work of construction, operation and maintenance of the highway/roads is done by the AE i.e, Gawar Constructions Limited and no work at all has been done by the assessee company i.e. LSIR. Precisely for this reason only, the TPO / AO has held that as the entire work was done by the AE only and the assessee company was Showing the operations and maintenance only for contract/ agreement purposes, accordingly the profit ratios of AE was taken and it was duly benchmarked with the comparable companies involved in the work of construction, operation and maintenance of highway / roads etc.

B. Work performed as part of concessionaire agreement During the course of arguments, the assessee has taken the ground that it is not doing any major works in the contract and only involved in undertaking some minor modification like landscaping, constructing Toll plaza etc. This contention of assessee is incorrect and contrary to the facts, as mentioned in the contract/ agreement documents. For the sake of ready reference, the following details as mentioned in the contract/ agreement documents are given below. i) The references is invited to the RFP proposal given by the M/s. Punjab Roads which is mentioned in Page 176 to 185 of the paperbook.

Attention is invited to para 1.1.3 at page no.176/177 wherein the scope of work of RFP is mentioned and ready reference of the same is reproduced below:

PUNJAB PUBLIC WORKS DEPARTMENT (B&R)

OPERATION, MAINTENANCE AND TRANSFER

LUL HIANA-MAKERKOTLA-SANGRUR ROAD

ON (PUBLIC PRIVATE PARTNERSHIP BASIS)

Page 177/ para1.1.3. The scope of work will broadly include operation and maintenance of the existing project highway, approach roads, structures, ROBs, bridges etc and construction of project facilities including major and minor maintenance works as mentioned the bidding document. It shall also include the operation and maintenance of Dehlon Byepass (km 18+750 to km 20+800 of 2.98 km length), on the project highway pursuant to handing over on completion by the Government to the Concessionarie. As part of the bidding documents, the Government will provide Site Studies Report as prepared by the Consultant appointed by the Government and other information pertaining/relevant to the project available with it. The bidders shall be required to examine and carry out, at their cost, such studies with due diligence in greater detail as may be required for submitting their respective bids for award of the concession including implementation of the project.

ii) Reference is also invited to the Concessionaire agreement for operation, maintenance and transfer of the Ludhiana Malerkotla Sangrur Road Pvt. between PRBDB and LSIR which is mentioned from page no.166to 175 of paper book. Again reference is invited to the O&M obligations of the Concessionaire, which are mentioned in para 15.1 at page 168 and for ready reference, the relevant extract is reproduced below:

(d)

carrying out periodic preventive maintenance of the Project Highway,

(e)

undertaking routine maintenance including prompt repairs of potholes ,cracks, joints, drains, embankments, structures, pavement making, lighting, road signs and other traffic control devices

(f)

Undertaking major maintenance such as resurfacing of pavements, repairs to structures and repairs and refurbishment of tolling system and other equipments.

(g)

preventing with the assistance of concerned law enforcement agencies any unauthorized use of the Project Highway.

iii) Reference is also made to the maintenance of major and minor work, as mentioned in the Concessionaire on page no. 173 and 174 and the details as contained are reproduced below:

1.2.

Major & Minor Maintenance Works

1.2.1.

The Major maintenance works for the project highway to be undertaken by the concessionarie following COD in. accordance with specifications & standards as per schedule-C and Good industry practice includes:

Sr.No.Description of Work
1.Periodic Overlay on Carriageway and Service Roads as determined by Benkleman Beam Deflection as per provision of IRC:81 in accordance with manual of specification and standards.
2.Pavement marking with thermoplastic paint, repainting of kers, kerb stones etc for carriageway and service roads in accordance with Manual of specifications and standards.
3.Reconstruction of service road of ROB at km 62+000 in Dhuri town (approx length 800m)
4.Construction of concrete crash barriers as per IRC Code of Practice - 10 nos. existing bridges (where not existing at present)
5.Raising and remodeling of rotaries and approaches at RD 6+900 and 9+100 to take care of flooding.

From the perusal of the above, it is crystal clear that the assessee, as part of the contract / argument was supposed to perform major works, as clearly delineated in the contract /agreement. The assessee is definitely not involved in doing minor works like landscaping, constructing toll plazas etc. and all the works which are to be done in any construction, operation and maintenance contract, are being done by assessee company also, which in the instant case, has been sub contracted to the AE. Thus the assessee contention on this point is also incorrect and wrong and deserves to be rejected.

Also, during the course of hearing, it was stated by the assessee counsel that the assessee company is involved in the Toll collection only. From the perusal of the RFP, Concessionaire agreement and also the functional profile submitted by the assess only, it is seen that the collection of Toll is not the individual activity which can be carried out on its own by an agency. Collection of Toll is intricately linked with the work of construction, operation and maintenance of highway meaning thereby, that first an agency has to complete the work of construction, operation and maintenance as per the stipulated terms and conditions and only then it becomes entitled for collection of Toll. Thus the assessee ground that it has to be assessed on the basis of collection of Toll only has to be rejected, at the very outset, as the major work for which the assessee collects the Toll is done by its AE i.e. Gawar Constructions Limited and collection of TOLL cannot be treated as a separate activity.

It is further submitted that the deduction u/s. 80IA (4) is available for construction, operation and maintenance of the roads/projects/highway and there is no deduction for collection of Toll only. If a company is engaged in the work of construction, operation and maintenance of a particular project, only then it becomes entitled for collection of Toll and thus collection of Toll along with construction, operation and maintenance work is eligible for the 80IA deductions. Thus if the assessee company says, that it is involved in collection of Toll only, then there is no deduction available for it u/s. 80IA of the Act. The assessee's another contention that the AE M/s. Gawar Constructions Limited is also covered under 80IA is also wrong and incorrect, in the sense, that an agency I entity as such, is not entitled for deductions u/s. 80IA. Deductions are confined to a specific project and as M/s. LSIR is claiming the deduction u/s 80IA for this project of Ludhiana MalerKotla Sangrur Project, the other entity i.e the AE cannot claim the same deduction.

4.

Aggregation of transactions The assessee has arranged its accounts in such a way that the major expenses are transferred to the P&L account of the AE whereas the income component gets reflected in the assessee's P & L account which results in the inflated claim of deduction u/s. 80IA. All this exercise of showing the excess profits has been done mainly with intention of claiming excess 80IA deductions which is not allowable to the assessee company under the provision of Income Tax Act. In the Transfer Pricing, the rule is to benchmark each transactions separately however, the various courts have decided/ ruled, that if the transaction are so closely linked that they cannot be separately benchmarked, then it is preferable. and desirable to benchmark the transactions in a aggregated manner. In the case of assessee, there is a single contract awarded by a state government agency i.e. M/s. PRBDB which is for the construction, operation and maintenance of project facilities and in lieu of performing that work, the Concessionaire is entitled for collection of Toll for a limited period of time. Two things are very clear from the perusal of the contract / agreement, TP Study report, that the work involved is the construction, operation and maintenance of the highway/ road and second for performing that job, the remuneration is collection of Toll. Both these activities cannot be seen/assessed in isolation as both are interdependent and so closely linked, that they cannot be segregated for benchmarking purposes. Also both these activities emanate from a single contract/agreement and both have to be seen/ benchmarked on aggregate basis. Reliance is placed on the following decisions.

(i)

Decision of Hon'ble Delhi High Court in the case of M/s. Sony Ericsson India Pvt. Ltd. in 374 ITR 118. Wherein the Hon'ble High Court has dealt with the issue of' aggregation of transactions for benchmarking purposes. The relevant extract of the decision is reproduced below:

K Aggregation or Disaggregation of Transactions and Set Off in Segregation of Bundled Transactions; whether Section 92(3) prohibits segregation.

136.

This leads us to the question of set off when bundled transactions are segregated. Conceptually, this is justified and equitable, as tax is payable on the total income after transfer pricing computation in respect of international transactions (See Section 92(4) of the Act).

137.

The question of aggregation and disaggregation of transactions when the TNM Method or even in other methods is sought to be applied, must have reference to the strength and weaknesses of the TNM Method or the applicable method. Aggregation of transactions is desirable and not merely permissible, if the nature of transaction(s) taken as a whole is so inter-related that it will be more reliable means of determining the arm's. length consideration/or the controlled transactions. There are often situations where separate transactions are intertwined and linked or are continuous that they cannot be evaluated adequately on separate basis. Secondly, the controlled transaction should ordinarily be based on the transaction actually undertaken by the AEs as has been struck by them. We should not be considered as advocating a broad-brush approach but, a detailed scrutinized ascertainment and determination whether or not the aggregation or segregation of transactions would be appropriate and proper while applying the particular Method, is necessary.

(ii)

Reliance is also placed on the Hon'ble Punjab and Haryana decision in the case of Knorr Bremse India P. Ltd. vs, ACIT 2015 63 taxmann.com 186/380 ITR 307 wherein the Hon'ble Court had held that "in order to combine two or more transactions, it is essential that they should be either inextricably linked to each other either by way of a package deal or that a number of transactions are priced differently but on the understanding that the assessee will accept all of them together (i.e. either take all or leave all). The relevant extract of the decision is reproduced below

37.

We will assume that the various international transactions were entered into with respect to the final commercial venture undertaken by the assessee, be it the manufacture and the sale of goods or the provision of services by it. The AO or the TPO, as the case may be, is required to determine the arm's length price in relation to "an international transaction". The acquisition of various items/components in the assessee's venture could indeed be telescoped into and form a single transaction. For instance, in the case of a package deal where each item of the package is not separately valued but all the components thereof are given a composite price, the transactions form but one composite transaction. An assessee may enter into one composite transaction with its AE involving the provision of various services or the sale of various goods. A party may opt for a single window facility where all the services and/or goods are provided under a composite agreement. Each of the components may even be priced differently. If it is established that each transaction was so inextricably linked to the other that the one could not survive without the other, it could be said that it formed a part of a transaction and that it was an international transaction. Take, for instance, a case where an AE offers to provide a bouquet of services and goods to the assessee each priced differently but on the understanding that the pricing was dependent upon the assessee accepting all the services and/or all the goods. In that event, it would not be open to the assessee to accept only some of the goods or the services at the prices indicated. It either takes all or none. This would normally constitute one transaction.

38.

Section 92B itself contemplates an international transaction "between two or more associated enterprises". It is not necessary, therefore, that an international transaction must be between only two parties. There can be a single composite transaction "between two or more associated enterprises". This is clear from the. opening words of Section 92B that for the purposes of Sections 92, 92B, 92C, 92D and 92E, international transaction means a transaction between two or more associated enterprises. The subsequent part of Section 92B makes this clearer by providing that the international transaction means a transaction between two or more associated enterprises in the nature of purchase, sale, etc. and shall include "a mutual agreement or arrangement between two or more associated enterprises". Thus, "a mutual agreement or arrangement" meaning thereby a single agreement or arrangement is contemplated between "two or more" associated enterprises. It would follow then that several transactions between "two or more" AEs can form a single composite transaction. The doubt, if any, in this regard is set at rest by Rule 10A(d) which provides that for the purposes of Rule l0A and Rules l0B to 10E, "transaction" includes a number of closely linked transactions". Thus, the closely linked transactions can in a given situation be components of a single composite transaction.

39.

The assessee would, however, have to prove that although each sale and each provision of service is priced separately, they were all provided under one composite agreement which constitutes an international transaction.

Thus, the above decisions clearly lays down the law that if the transactions are so closely linked that they form a single composite transaction or they cannot be evaluated separately, then they have to be benchmarked on aggregated basis.

Thus, to summarize, the following points may kindly be considered.

i)

Collection of toll is not an isolated activity, it is dependent on the other works i.e. construction, operation and maintenance of highway/ road, accordingly both these activities are to be aggregated for benchmarking purposes, as they cannot be separately benchmarked. Further there is common agreement for both these activities and as they emanate from single source / contract, they cannot be seen in isolation.

ii) AE of the assessee company i/e. M/s Gawar constructions is performing all the major activities/ works and accordingly profit ratios of this company/ AE were considered for benchmarking and determining ALP of the transactions by comparing it, with comparable companies involved in similar kind of work.

iii) Deductions u/s 80IA are available only for construction, operation and maintenance of infrastructural facility and not for collection of Toll.”

9.

Considered the rival submissions and material placed on record. We observed that Punjab Roads and Bridges Development Board ("PRBDB") under World Bank Aid had developed/ upgraded the Ludhiana -Malerkotla Sangrur Road having a length of 71.352 km. PRBDB under PPP model floated a "Request for Proposal" ("RFP") to allot Operation, Maintenance and Transfer ("OMT") of the said highway. The scope of the project allocated to the assessee, as per the concession agreement are OMT of Ludhiana Malerkotla Sangrur Road and Dehlon Bypass (pursuant to handing over by the Govt) and build as per schedule B i.e., to construct the facilities such as toll plazas, roadside functions, street lighting, landscaping, traffic and first aid parts. We noticed that the assessee has an arrangement with their holding company to extent the subcontract facilities to repair or maintain the road and construct the facilities as per the schedule B. At the same time, we observed from the submissions of the Ld DR that the original proposal to bid the above said contract only by the GCL and later it was transferred to the assessee. The objection raised by the revenue that the toll collection is not only for OMT but also for BMT, since the assessee is only maintaining the road and declaring the abnormal profit, according to Ld DR, this is only transfer of profit from holding company to the assessee. After careful consideration of the facts on record, we observed that the concession agreement is meant only for OMT and construction of additional facilities in and around the toll road. We cannot presume that the main road constructed by the holding company and the benefits are transferred to the assessee. It is clear from the concession agreement that it is only for OMT and construction of additional facilities.

10.

Based on the above agreement, the assessee had completed the contract by utilizing the services of its holding company ie., GCL and third-party CIL. The assessee claimed that the assessee had utilised the CSR to finalise the sub-contract rates awarded to GCL and CIL. Therefore, in order to bench mark the same, the assessee had utilised the other method as the internal CUP is already available. After going through the CSR submitted before us, it is too technical and the assessee had not submitted before any authority how they have applied the CSR to subcontract both the parties, it is difficult to compare the work allocation to both the parties and the CSR rates are available in terms of basic rate as per CSR and Premium above CSR, it is difficult to link the work allocation in terms of basic rates and premium rates. It may lead to raise doubt, whether the assessee had allocated the work of premium and subsequently obtained bill for basic work. This itself requires considerable time to understand and comprehend the details, which the assessee had not explained nor submitted any details before the lower authorities and before us. Therefore, we are not in a position to accept the above submissions. Therefore, in our view, the TP study has to be on the basis of TNMM.

11.

We observed that the TPO had proceeded to bench mark the TP adjustment on the basis of TNMM but applied the wrong functional comparability as the contract executed was OMT but the TPO applied BMT to select the comparable companies. There is fundamental flaw in selection of the comparable companies. Therefore, we are inclined to remit this issue back to the file of AO/TPO to redo the bench marking exercise by the adopting the correct functional comparability, by adopting the OMT to select the relevant comparables in this case. We direct the TPO to give proper opportunity of being heard to the assessee and redo the bench marking as per law.

12.

In the result, the appeal filed by the assessee is allowed for statistical purposes.