Judgment
IA(LIQ.)/14/2025- The Above IA(LIQ.)/14/2025 is listed for pronouncement of order. The same is pronounced in open court, vide a separate order.
Per: Coram
The present Application has been filed under Section 33(2) along with 60(5) of the Insolvency and Bankruptcy Code, 2016 (hereinafter referred to as “the Code”) read with applicable provisions of the Insolvency and Bankruptcy Code (Insolvency Resolution Process for Corporate Persons), 2016 (“CIRP Regulations”) by Mr. Manish Motilal Jaju (hereinafter referred to as the “Applicant”) seeking the following reliefs: -
“(a)The Hon’ble Adjudicating Authority may be pleased to pass an order for liquidation of the Corporate Debtor Rajesh Landmark Projects Private Limited in terms of the Section 33(2) of the Insolvency & Bankruptcy Code, 2016 read with applicable provisions of the Code;
(b)The Hon’ble Adjudicating Authority may be pleased to pass an order for appointment of Mr. Manish Motilal Jaju, Insolvency Professional having IBBI Registration No. IBBI/IPA-001/IP-P00034/2016-17/10087 as Liquidator of the Corporate Debtor Rajesh Landmark Projects Private Limited;
(c)The Hon’ble Adjudicating Authorities may be pleased to condone the delay of 180 days in filing of the present application for liquidation of the Corporate Debtor Rajesh Landmark Projects Private Limited;”
Brief Facts
The Company Petition No. 1029 of 2021 was filed by the Financial Creditor i.e., IREP Credit Capital Private Limited as per Section 7 of the Code to initiate Corporate Insolvency Resolution Process (“CIRP”) against the Corporate Debtor i.e., Rajesh Landmark Projects Private Limited. Vide Order dated 10.10.2022, the Corporate Debtor was admitted into CIRP and Mr. Bhrugesh Amin was appointed as the Interim Resolution Professional (“IRP”) of the Corporate Debtor.
The Corporate Debtor was in the construction of residential and commercial projects i.e., Real Estate and at the time of initiation of CIRP was joint developer of Slum Rehabilitation Scheme being implemented on all the piece and parcel of land bearing CTS No. 1322/1 (pt) and corresponding Survey No. 161 aggregating approximately 7478.40 Sq. Mtrs. at Village Versova, Juhu-Versova Link Road, Taluka Andheri West, Mumbai – 400053 (hereinafter referred to as “SRA Project”).
Committee of Creditors (“CoC”)
The IRP made a public announcement of initiation of CIRP on 13.10.2022 in accordance with the provisions the Code and CIRP Regulations to invite claims from Creditors. The last date for filing of claims was 24.10.2022. In accordance with claims received, the IRP constituted the Committee of Creditors comprising of two Financial Creditors namely IREP Credit Capital Private Limited and Assets Care and Reconstruction Enterprise Ltd. (“ACRE”) as under: -
| Name of the Financial Creditor | Amount Claimed (in Rs.) | Amount Admitted (in Rs.) | Voting Share Percentage |
|---|---|---|---|
| Rare Asset Reconstruction Limited | 32,45,33,020 | 27,18,83,418 | 16.07% |
| Asset Care and Reconstruction Enterprises Limited | 1143,40,39,872 | 141,97,85,889 | 83.93% |
| Total | 1175,85,72,892 | 169,16,69,307 | 100% |
Valuation Report
As per the valuers appointed by the CoC, the Fair Value and the Liquidation Value of the Assets of the Corporate Debtor assessed by the appointed valuers has been reproduced as below: -
(in Crores)
| CoC Meeting | Date of CoC Meeting | Relevant resolution & discussions |
|---|---|---|
| 1st CoC Meeting | 07.11.2022 | CoC resolved to appoint Mr. Manish Jaju as the Resolution Professional (“RP”) of the Corporate Debtor by replacing Mr. Bhrugesh Amin, the erstwhile Interim Resolution Professional (“IRP”). |
| 2nd CoC Meeting | 08.12.2022 | CoC took note of the various legal proceedings with respect to the SRA Project being implemented by Corporate Debtor as Joint Developer. In the same meeting, the CoC requested the RP to defer publication of Expression of Interest (“EoI”) by way of Form G in view of various constraint including pending litigations against the Corporate Debtor. |
| 3rd CoC Meeting | 28.12.2022 | CoC decided to vote on extension of time limit for publishing Form G (1st Form G) as ACRE being major Financial Creditor with highest voting rights could not cast its vote due to technical glitch. |
In total 33 CoC Meetings were held, therefore for the sake of brevity, the meetings have been encapsulated in the following table: -
| CoC Meeting | Date of CoC Meeting | Relevant resolution & discussions |
|---|---|---|
| 1st CoC Meeting | 07.11.2022 | CoC resolved to appoint Mr. Manish Jaju as the Resolution Professional (“RP”) of the Corporate Debtor by replacing Mr. Bhrugesh Amin, the erstwhile Interim Resolution Professional (“IRP”). |
| 2nd CoC Meeting | 08.12.2022 | CoC took note of the various legal proceedings with respect to the SRA Project being implemented by Corporate Debtor as Joint Developer. In the same meeting, the CoC requested the RP to defer publication of Expression of Interest (“EoI”) by way of Form G in view of various constraint including pending litigations against the Corporate Debtor. |
| 3rd CoC Meeting | 28.12.2022 | CoC decided to vote on extension of time limit for publishing Form G (1st Form G) as ACRE being major Financial Creditor with highest voting rights could not cast its vote due to technical glitch. |
| 4th CoC Meeting | 19.01.2023 | CoC approved publication of invitation for EoI in Form G (1st Form G) and to extend timelines of various actions/steps to be taken for completion of CIRP process with respect to the Corporate Debtor. |
| 5th CoC Meeting | 17.02.2023 | CoC decided to issue fresh EoI in Form G (2nd Form G) since EoI was received from 1 Prospective Resolution Applicant (“PRA”) only. In response to the 2nd Form G, the Applicant received EoIs from 5 PRAs namely: - (i) Shree Krishna Structures Private Limited with JP Infra Private Limited; (ii) United Biotech Limited; (iii) Romell Real Estate Private Limited; (iv) Sumit Kumar Khanna; (v) Bhumi Reddy Gari Mohan Reddy in consortium with Rajendra Goel and Naveen Srinivasa Yalamanchili; (vi) Sandeep Gupta |
| 6th CoC Meeting | 10.04.2023 | CoC passed resolution for extension of CIRP process period by a further period of 90 days in accordance with Section 12(2) of the Code. The CoC also discussed the appointment of an Auditor for conducting transaction audit for a period of 2 years immediately prior to CIRP commencement date in order to ascertain whether Corporate Debtor has been subjected to any Avoidance Transaction under Section 43, 45, 50 or 66 (Preferential, Undervalued, Extortionate Credit and/or Fraudulent Transactions). Consequently, the CoC |
| appointed N V Dand & Associates as Transaction Auditor for carrying out Corporate Debtor's transaction audit and Chetan T. Shah, Chartered Accountant as Statutory Auditor for F.Y. 2020 – 2021 and 2021 – 2022. | ||
| 7th CoC Meeting | 13.04.2023 | CoC discussed the issuance of fresh Form G for the 3rd time. |
| 8th CoC Meeting | 20.04.2023 | CoC approve the Request for Resolution Plan ('RFRP') with modification and also approved Evaluation Matrix for evaluation of Resolution Plans. |
| 9th CoC Meeting | 29.05.2023 | CoC extended the last date for submission of plans to 15.06.2023 being computed from date of intimation of such extension given by RP to all PRAs. |
| 10th CoC Meeting | 10.06.2023 | CoC resolved to extend the CIRP period with respect to the Corporate Debtor by a further period of 60 days as there would be no sufficient time for CoC to consider and approve the Resolution Plan in terms of the provisions of the Code and for the Applicant to file appropriate application for approval of the Resolution Plan before the Tribunal. |
| 13th CoC Meeting | 04.09.2023 | CoC took note of the fact that the outcome of the CIRP process of the Corporate Debtor would be largely contingent upon orders passed by the Tribunal in I.A. 500 of 2023 and Hon'ble Bombay High Court in Writ Petition No. 5116 of 2022 since the aforesaid legal proceedings affects the rights of the Corporate |
| Debtor to develop and/or implement SRA Project. Consequently, CoC resolved to file an application for exclusion of 60 days from the CIRP period. | ||
| 14th CoC Meeting | 18.09.2023 | CoC decided to deliberate the way forward once clarification/revised Resolution Plan is received from Romell Real Estate Private Limited in response to queries posted by the CoC Members in the 12th CoC Meeting since Romell sought time of up to 20.09.2023 to submit clarification/revised Resolution Plan. |
| 15th CoC Meeting | 05.10.2023 | CoC took note of the revised Resolution Plan/clarification received from Romell and held discussions. After deliberations, the representative of Romell decided to take decision on the Resolution Plan of Romell in the next CoC Meeting. |
| 16th CoC Meeting | 12.10.2023 | CoC decided to reject the Resolution Plan of Romell since it was non-complaint. CoC also decided to re-run the process by issuance of fresh Form G ('3rd Form G') and approved the revised eligibility criteria for PRAs. |
| 17th CoC Meeting | 28.10.2023 | CoC approved the RFRP along with Performance Security as well as Evaluation Matrix. |
| 18th CoC Meeting | 22.11.2023 | The CoC deliberated and approved on the application for the exclusion of 120 days from the CIRP period in order to discuss and finalize Resolution Plan expected to be received from the Resolution Applicant within couple of days and in view of the time |
| consumed in litigations pertaining to JDA rights. | ||
| 22nd CoC Meeting | 20.01.2024 | CoC noted that ACRE being the only other CoC members apart from RARE ARC which had submitted its resolution plan has provided its comments on the plan to RARE. The CoC also took note of the fact that even after exclusion of 120 days, if granted, by this Hon'ble Tribunal, the CIRP period would expire on 04.01.2024 and hence further exclusion of 60 days is required on account of substantial period of more than 350 days lost on account of pending litigations as enumerated hereinabove as well as discussed in the 18th CoC Meeting dated 22.11.2023 which respect to only substantive asset of the Corporate Debtor which are Joint Development Rights with respect to the SRA Scheme. The CoC also noted that non-compliant/conditional resolution plan dated 01.07.2023 was submitted by Romell in response to the 2nd Form G on account of pending litigations including before the Hon'ble High Court wherein JDR of the Corporate Debtor were under cloud, which were subsequently not adjudicated by the Hon'ble High Court and left it for determination by the CEO SRA Hence, the CoC in its 16th Meeting dated 12.10.2023 had rejected the resolution plan and decided to issue Fresh and 3rd Form G in |
| response to which RARE ARC, being one of the two CoC Members had submitted a Resolution Plan dated 29.11.2023 which was under active consideration by the CoC being well aware of the facts and circumstances of the matter. | ||
| 24th CoC Meeting | 09.03.2024 | CoC took note of the developments in the finalization of the Resolution Plan. ACRE being the majority CoC member, brought on record the fact that the approval of Resolution Plan is taking longer than expected since there were meetings convened by the Slum Rehabilitation Authority of Housing Ministry with lenders of SRA project under Amnesty Scheme notified the Government of Maharashtra, wherein ACRE has made submission to the Coordination Committee constituted for Amnesty Scheme. Further, CoC decided to withdraw I.A. No. 675 of 2024 filed for extension of 60 days and filed application for exclusion of 120 days. |
| 25th CoC Meeting | 27.04.2024 | Owing to the fact that Resolution Plan submitted by RARE ARC was being actively considered, the CoC resolved to withdraw I.A. No. 1802/2024 filed for exclusion of 120 days and further resolved to file extension for 180 days from 05.01.2024. |
| 29th CoC Meeting | 18.07.2024 | The revised and final Resolution Plan dated 02.07.2024 was considered by the CoC wherein both the CoC Members required two to three days to close the pending issues with |
| respect to the Plan and are positive to arrive at workable solutions. | ||
| 30th CoC Meeting | 24.07.2024 | Revised Resolution Plan was received on or about 24.07.2024 in order to incorporate clause on compliance with RFRP with regards to the Performance Security of Rs. 5 Crore to be provided in the event the Resolution Plan is approved, the CoC noted that the RP would have to carry out due diligence as per the Code to ensure that the Resolution Plan complies with applicable provisions of the Code and Regulations framed thereunder. |
| 31st CoC Meeting | 31.07.2024 | The suspended director, Pratik Patel raised various issue, observations and objections with respect to the plan including but not limited to non-eligibility of RARE ARC, PRA to submit Resolution Plan as per RBI norms, Resolution Plan being submitted jointly with Roswalt Reality Private Limited etc. Therefore, the CoC decided to legally examine the issue raised by the suspended directors. |
| 32nd CoC Meeting | 21.08.2024 | CoC sought time to obtain legal opinion on the issues raised by the suspended director about the Plan. |
In the 33rd CoC Meeting held on 10.12.2024, the CoC discussed about the Resolution Plan as well as on the Liquidation of the Corporate Debtor. During the e-voting held during the period from 13.12.2024 to 23.12.2024, the CoC rejected the Resolution Plan dated 02.07.2024 with 100% voting share and resolved to approve the Liquidation of the Corporate Debtor, with 83.93% voting rights. With regards to the approval of initiation of Liquidation proceedings by the CoC, the following resolution was passed by e-voting: -
“RESOLVED THAT as per the provisions of Section 33(2) of the Insolvency and Bankruptcy Code 2016, the CoC of Rajesh Landmark Projects Private Limited (“Corporate Debtor”) hereby recommends the liquidation of the Corporate Debtor and authorises the Resolution Professional to file necessary application to initiate the liquidation process.”
The following orders were passed by the Hon’ble High Court and Tribunal relating to the CIRP of the Corporate Debtor: -
| Interlocutory Application (I.A.) | Order passed by NCLT |
|---|---|
| I.A. 1351 of 2023 | Extension of 90 days vide order dated 06.06.2023 |
| I.A. 2902 of 2023 | Extension of 60 days vide order dated 18.07.2023 |
| I.A. 52 of 2024 | Exclusion of 120 days vide order dated 16.01.2024 |
| I.A. 2466 of 2024 | Exclusion of 180 days vide order dated 21.05.2024 |
| I.A. 318 of 2023 | Allowed the replacement of IRP with Mr. Manish Jaju as Resolution Professional of the Corporate Debtor. |
| I.A. 4129 of 2023 | Filed for exclusion but was later withdrawn |
| I.A. 500 of 2023 | Filed for: - 1. Restrain Priya Constructions Company from terminating, cancelling, or revoking the Development Agreement and |
| Power of Attorney executed with the Corporate Debtor. 2. Restrain Slum Rehabilitation Authority – SRA from modifying, revoking, terminating, or cancelling the Letter of Intent (LOI) issued in favour of Priya Constructions Company. This I.A. was dismissed vide order dated 25.04.2025. | |
| Interim Application | Order passed by Hon’ble Bombay High Court |
| Interim Application(L)/40772/2022 | Filed by Corporate Debtor in Suit for termination of Letter of Intent by Slum Rehabilitation Authority – Commercial Suit No. 345 of 2022 seeking stay on the continuation of the Suit, in view of the moratorium by virtue of order admitting Corporate Debtor into CIRP. The Hon’ble Bombay High Court vide order dated 10.03.2023, stayed the continuation of the Suit for Termination – Commercial Suit No. 345 of 2022 until the moratorium period is over. |
| Interim Application(L)/18186/2023 | The Corporate Debtor sought to intervene in Writ Petition No. 5116 of 2022 and sought to be impleaded as a party Respondent, in light of the fact that RLPPL is the joint developer |
| of the said Plot and as such is not only directly interested in the subject-matter of the present Petition but will also be directly interested in the subject-matter of the present Petition but will also be directly affected by any order passed by the Court with regard to the said Plot and the Slum Rehabilitation Scheme being implemented thereon. Hon'ble Bombay High Court disposed off the Writ Petition No. 5116 of 2022 vide order dated 12.10.2023 with a direction that all previous interim orders including against the SRA from proceeding under Section 13(2) stood vacated and all rights and contentions of all parties were kept open and no findings were given on merits. |
It is submitted that no application for PUFE transactions are filed by the Resolution Professional as per Regulation 35A. It was decided by the CoC in their 33rd Meeting that, the payment of the Estimated Liquidation Cost as per Regulation 39B; Assessment of the Corporate Debtor as a going concern as per Regulation 39C and Fees of the Liquidator as per Regulation 39D shall be decided by the Stakeholders Consultation Committee (“SCC”) after the Corporate Debtor goes into liquidation. We also note that no other applications are pending before this Tribunal.
The CIRP of the Corporate Debtor commenced on 10.10.2022. The Resolution Professional sought various extensions and exclusions which were duly granted. Considering such extensions and exclusions, the due date for completion of CIRP was 03.07.2024. However, in such extended period, the resolution of the Corporate Debtor could not be achieved and thereafter as per the provisions of the Code, the Resolution Professional was supposed to file an application before the Tribunal for the initiation of Liquidation proceedings. However, the present application has been filed on 30.12.2024 which is 180 days after the expiry of CIRP period on 03.07.2024. As per Prayer (c), the Applicant has prayed that this delay of 180 days in filing the present application for the initiation of liquidation of the Corporate Debtor be condoned. It is submitted that in the 33rd CoC Meeting which was held on 10.12.2024 a resolution was passed for liquidation of the Corporate Debtor; and thereafter the present I.A. was filed on 30.12.2024. The delay sought to be condoned is seen to be on account of the conduct of Resolution Professional/CoC. However, in above facts and circumstances, the delay in filing this I.A. No. 14 of 2025 is condoned.
The Resolution Professional filed the present application under Section 33(2) of the Code, after rejection of the Resolution Plan dated 02.07.2024 submitted by RARE ARC and approving the agenda of initiating Liquidation proceedings in regards of Corporate Debtor with 83.93% vote share of the CoC. For the ease of comprehension, Section 33(2) of the Code has been reproduced below:
33.(2) Where the resolution professional, at any time during the corporate insolvency process but before confirmation of resolution plan, intimates the Adjudicating Authority of the decision of the committee of creditors [approved by not less than sixty-six per cent of the voting share] to liquidate the corporate debtor, the Adjudicating Authority shall pass a liquidation order as referred to in sub-clauses (i), (ii) and (iii) of clause (b) of sub-section (1).
[Explanation – For the purposes of sub-section, it is hereby declared that the committee of creditors may take the decision to liquidate the corporate debtor, any time after its constitution under sub-section (1) of section 21 and before the confirmation of the resolution plan, including at any time before the preparation of the information memorandum.]
Section 33(2) of the Code provides that the Adjudicating Authority shall pass an order for liquidation of the Corporate Debtor, if the CoC, by more than 66% of vote share passes the resolution for liquidation. It is observed that in the present case, the CoC rejected the Resolution Plan dated 02.07.2024 submitted by RARE ARC by 100% vote share in their 33rd CoC Meeting. Moreover, in the Hon'ble Supreme Court's observation in the matter of K. Sashidhar Vs. Indian Overseas Bank & Ors. in Civil Appeal No. 10673 of 2018 held that the commercial decision of CoC is non-justiciable. Therefore, the above quoted judgement, makes it clear that the "commercial decision of CoC" is to be given paramount status. Since, the Tribunal is not bestowed with the powers of jurisdiction or authority to analyse the commercial decision of the CoC and the CoC members act in their best interest while being completely aware of the financial trends, therefore, the decision of the CoC shall not be interfered with by this Tribunal.
We note that the Applicant and CoC have proposed the acting Resolution Professional i.e., Mr. Manish Motilal Jaju to act as the Liquidator. However, in Circular No. Liq12011/214/2023-IBBI/840 dated 18.07.2023, IBBI has provided the following guidance: -
3.In view of above justification, the Board in exercise of its powers conferred under section 34(4)(b) recommends that an IP other than the RP/IRP may be appointed as liquidator in all the cases where liquidator order is to be passed henceforth. The liquidator can be appointed from the panel list of IBBI.
In view of the above, this bench is inclined to appoint an Insolvency Professional from the IBBI Panel Ms. Smita Gupta bearing Registration No. IBBI/IPA-001/IP-P-02768/2023-2024/14283 to act as the Liquidator in terms of section 34 of the Code. His Authorization for Assignment is valid up to 30.06.2026.
In light of the above facts and circumstances, it is hereby ordered as follows:
ORDER
a. The Corporate Debtor is directed to be liquidated in accordance with the provisions of the IBC and applicable regulations.
b. Ms. Smita Gupta bearing Registration No. IBBI/IPA-001/IP-P-02768/2023-2024/14283; having address at; Flat no. 7702, 7th Floor, Godrej Central J tower, Shell Colony, Near Tilak Nagar Railway Station, Chembur, Mumbai – 400071, e-mail id: [email protected] is appointed to act as the Liquidator in terms of Section 34 of the Code.
c. The fees entitled to the Liquidator shall be as per Regulation 4(2) of the Insolvency and Bankruptcy Board of India (Liquidation Process) Regulations, 2016.
d. Registry is directed to send a copy of the order to the Registrar of Companies, Mumbai and the Insolvency and Bankruptcy Board of India.
e. A fresh moratorium shall commence under Section 33(5) of the Insolvency and Bankruptcy Code.
f. This order shall be deemed to be a notice of discharge to the officers, employees and the workmen of the Corporate Debtor as per Section 33(7) of the IBC Code, 2016.
g. The Liquidator is directed to proceed with the process of liquidation as laid down under Chapter III of the Part II of Insolvency and Bankruptcy Code, 2016 and the Insolvency & Bankruptcy Board of India (Liquidation Process) Regulations, 2016.
h. The Liquidator shall submit a Preliminary Report to the Adjudicating Authority within seventy-five days from the liquidation commencement date as per Regulation 13 of the Insolvency and Bankruptcy (Liquidation Process) regulations, 2016.
The Liquidator appointed under section 34 of the Code shall have all the powers of the Board of Directors, Key Managerial Personnel and the existing Board of the Corporate Debtor, the Key Managerial Persons and the partners shall cease to have effect.
j. The personnel of the corporate debtor shall extend all co-operation to the Liquidator as required by him in managing the Liquidation process of the Corporate Debtor.
k. A copy of the said order shall be sent to the Financial Creditors, Corporate Debtors and the Liquidator for taking necessary steps.
While referring to Regulation 32(e) of the Insolvency and Bankruptcy Code (Liquidation Process) Regulations, 2016 (Liquidation Regulations) which envisage the sale of the Corporate Debtor as a going concern, the Hon'ble Supreme Court in the matter of Swiss Ribbons Pvt. Ltd. & Anr. Vs. Union of India & Ors. Writ Petition (Civil) No.99 of 2018, observed that:
“What is interesting to note is that the Preamble does not, in any manner, refer to liquidation, which is only availed of as a last resort if there is either no resolution plan or the resolution plans submitted are not up to the mark. Even in liquidation, the liquidator can sell the business of the corporate debtor as a going concern. ... It can thus be seen that the primary focus of the legislation is to ensure revival and continuation of the corporate debtor by protecting the corporate debtor from its own management and from a corporate death by liquidation.”
Accordingly, we suggest that, in order to maximise the value of the Corporate Debtor’s assets, the Liquidator shall endeavour to explore the viability of selling the business of the Corporate Debtor as a going concern under clauses (e) or (f) of Regulation 32 of Liquidation Regulations, as the case may be.
Accordingly, the I.A. No. 14 of 2025 in C.P. No. 1029 of 2021 is allowed in above terms.