High CourtsDivision Bench(2026) 09 BOM CK 8135

Beeline Impex Limited & Ors. vs The State Of Maharashtra

Bombay High Court · Decided on 1 September 2026

RESULT
Allowed
CASE NUMBER
Writ Petition No. 2097 of 2016
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

Judgment

82 paragraphs · 4,965 words
CourtKutchehryPremium

Upgrade to Premium

Everything you need for focused legal research, in one membership.

  • Unlimited judgment reading
  • Advanced judgment search
  • AI judgment summaries
  • Original court PDFs
  • All related judgments
  • Bookmarks, notes & exports

Loading membership options…

JUDGMENT (PER BHARATI DANGRE J):-

1.

The Petitioner No.1, Beeline Impex Pvt. Ltd., and Petitioner No. 2, Pearl Coschem Pvt. Ltd., the companies incorporated under the Companies Act, along with Shri Madhusudan Brijial Vakharia, Director of Petitioner Nos.1 and 2 have approached this Court with a relief of direction being issued to the Collector of Mumbai Sub-Urban District i.e. Respondent No.1 to grant the permission for filling and levelling of the land in C.T.S. Nos.1A/167 and 1A/168 of Village Pahadi, Goregaon, Mumbai Suburban District or to refund to the Petitioners the amount deposited by them while granting permission to refill the land by the Collector along with interest at the rate 18% per annum or as such rate as the Court deem fit and proper from the date of its deposit till payment of realization.

2.

We have heard learned counsel Mr. Darshit Jain for the Petitioners and learned Additional Government Advocate Mr. Mlind More, for the Respondent-State. Since the pleadings are completed and the matter is taken up for hearing, we deem it appropriate to issue ‘Rule’ by consent of the parties.

Rule is made returnable forthwith.

3.

The Petitioners claim to be the owner of land admeasuring about 19,01,077 sq. mtrs. from C.T.S. No. 1A/167 and 1A/168 of Village Pahadi, Goregaon, Mumbai Suburban District.

The sequence of events reveal that in respect of C.T.S. 1, Survey No. 161 of Village Pahadi, Goregaon, clearance for development was granted by the Ministry of Environment and Forests (MoEF) on 4/07/1996.

However, based on the complaints of destruction of mangroves, and pursuant to a site visit being carried out by the MoEF between 13/09/2002 and 15/09/2002, a report for violation of CRZ notification was furnished and this resulted into an order dated 27/09/2002, passed by the MoEF suspending the development permission granted.

One Usha Madhu Development CHS Ltd., the then owner raised a challenge to the said order by filing WP No. 1470 of 2003 and on 3/10/2003, this Court stayed the order of MoEF dated 27/09/2002.

This constrained the Bombay Environment Action Group (BEAG) to challenge the interim stay granted by this Court by filing SLP (Civil) 24293 of 2003 before the Apex Court and by order dated 8/01/2004, the Apex Court stayed the interim order passed by this Court in WP No. 1470 of 2003.

On 15/03/2004, the Supreme Court disposed off the said Appeal confirming the earlier interim order dated 8/01/2004 and directed the High Court to dispose of WP No. 1470 of 2003 in an expeditious manner, until which time the interim order granted in WP No.1470 of 2003 was directed to remain stayed. Therefore, as long as the Petition was pending, the erstwhile owners were not permitted to carry out development on the said land.

The present Petitioner No.1 also came to be impleaded in WP No. 1470 of 2003 as co-petitioner. It is on 27/04/2012, the Writ Petition was permitted to be withdrawn by directing the MoEF to pass the order on the proceedings initiated by it and the statement of the counsel for the Petitioners was recorded to the effect that no development shall be carried out on the said land.

4.

The Petitioners before us, in present Petition purchased the subject property from Usha Madhu Development CHS. Ltd., which had filed a WP No. 1470 of 2003 and the Petitioner Beeline Impex Pvt Ltd., being the co-petitioner, on 12/07/2011, the Petitioners preferred an application to the Collector, Mumbai Suburban District with regards to the following subject:-

“Proposed Filling In Our Property Bearing C.T.S. No.1 A / 167 & 1 A / 168 In The Village of Pahadi, Goregaon (West)”.

The said application stated that the land is shown in the No Development Zone and the predecessor in title on getting the plan sanctioned for Golf Course and need based Housing from the Municipal Corporation had converted the land into N.A. use in the year 2001. A specific statement was made in the application that in the wake of the plan prepared by the Maharashtra Remote Sensing Agency, Nagpur under the order passed by the High Court in the year 2005, the land was devoid of any vegetation except some vegetation on the boundary, which was alleged to be mangroves but this was refuted by the Petitioners by submitting that the vegetation is normal sea growing vegetation, which may be interspersed with scattered mangroves, as the property was abutting Malad Creek.

However, with an intent to make the land available for development as per permissible user, the Petitioners sought permission to fill the same by the excavated material from the basement i.e. mud or soil, and for this they were agreeable to pay Royalty as per the rules and regulations.

A specific statement was made that there were no mangroves on the periphery of the property and in any case, the applicants shall not make any filling within 50 mtrs of the periphery of the boundary in keeping with the requirements of CRZ Notification. It was also clarified that the applicants shall instruct the Contractors to keep appropriate record of the material used for filling, so as to distinguish the material to the extent of filling of excavated material.

The filling was agreed to be undertaken in a phase manner over the total area of 19,01,077.00 square meters i.e. 2,04,55,588.52 square feet x 5 feet average height i.e. 10,22,779.426 brass to be filled in four phases as set out as below:-

“1)

Phase – 1 ---------- 2,50,000 brass;

2)

Phase – 2 ---------- 2,50,000 brass;

3)

Phase – 3 ---------- 2,50,000 brass;

4)

Phase – 4 ---------- 2,72,799 brass.”

5.

Upon the Petitioners making an application, the land was jointly inspected on 11/08/2011 and the Collector sought the following compliance at the end of the Petitioners:-

“1)

To submit plan of your property indication boundaries and marking of the area of creek, mangroves, area affected by mangroves, Road widening and the remaining area of which filling is to be done.

2)

To submit receipts of Non-Agriculture Assessment paid upto date.”

6.

On 19/11/2011, the Collector granted the permission to fill 85000 brass minor minerals and to level the land and the Petitioners were directed to deposit the following amounts in the office of Tahsildar, Borivali within period of 4 days.

Application FeesRs. 25.00
RoyaltyRs. 1,70,00,000.00
Ground RentRs. 30,01,987.00
Total AmountRs. 2,00,02,012.00

It was also indicated that the amount of Rupees Two Crores Two Thousand Twelve was not deposited within 4 days, it was to be assumed that the Petitioners are not interested in prosecuting the application which shall be disposed of.

7.

In compliance of the aforesaid direction, it is the case of the Petitioners that it issued two pay orders in the name of Tahsildar Borivali and acknowledgments were passed to that effect and this fact of the amount of Rs.2,00,02,012.00 being deposited is not disputed.

8.

After the payment of the aforesaid amount being made by the Petitioners, on 11/1/2012, the Collector, Mumbai Suburban District, addressed a communication to the Petitioners to the following effect:-

“On the subject herein, you have submitted application for permission for filling in your property bearing C.T.S. No. 1A/167 and 1A/168, village Pahadi, Goregaon, District Borivali. It has come to knowledge of this office that the Environment & Forest Department, Government of India has stayed the development of the said property. And in connection therewith the matter is subjudice before the Ministry of Central Environment & Forests and high Court at Mumbai. You are therefore called upon to immediately inform this office, whether a final decision has been taken in the matter or else what is the present position, so that further steps can be taken.”

9.

Since the Petitioners did not receive any permission for filling up the minor mineral and levelling the subject land, on 26/06/2012, they addressed a communication to the Collector clarifying that since the order was not received and there was no certainty as to when the order would be issued, the amount be refunded at the earliest. It was also clarified that in future if the permission is granted and indent thereof is received, the payment shall be immediately made.

Followed by the aforesaid communication, the Petitioners addressed various reminders to the Collector seeking refund of the amount deposited but there was no response at the other end nor any steps were taken to refund the amount.

10.

On 5/04/2013, MoEF addressed a communication to the Chief Secretary, Government of Maharashtra, with reference to the CRZ clearance accorded by it for developing Golf Link with Club House, Cafeteria, Health Culb and a need based residential accommodation on CTS No.1 in village Pahadi, Goregaon. It also made reference to the orders passed by this Court and it referred to the order dated 27/04/2012 passed by the High Court of Bombay, directing the Ministry to pass a reasoned order. The communication recorded that the project proponent had informed the Court that they are not interested in continuing with the project and even the validity of the CRZ clearance had expired and it had become null and void.

In the wake of the aforesaid, the Minstry passed the following order which was communicated to the Government of Maharashtra.

“10.

In view of the above, Ministry hereby passes the following order:

“Regarding the destruction of mangroves by the project proponent, the State Government shall examine and take necessary action as appropriate under the relevant rules, notifications and directions of the Hon’ble High Court, Bombay including Forests (Conservation) Act, 1980, Environment (Protection) Act, 1986 and CRZ Notification, 1991/2011 with regard to the subject matter of WP 1470/2003 filed by M/s Usha Madhu Development Cooperative Housing Society Ltd.”

11.

On 15/06/2013, the Collector addressed a communication to the Tahsildar, Borivali, and the copy of the same is forwarded to the Petitioners, forwarding an intimation about the deposit of the sum of Rs. 2,00,02,012/- with regards to the subject CTS numbers and the fact that the Ministry of Central Environment and Forests had prohibited development of the said property.

The Collector, therefore, directed the Tahsildar to submit a report, so as to enable him to undertake the exercise of refund by reflecting upon the geographical position and other information. However, no progress took place and on 5/05/2015 the Petitioner addressed a letter to the Tahsildar informing that two years had passed when the report was called but no steps were taken for refund.

This constrained the Petitioners to file the Writ Petition, seeking refund of the amount.

12.

It is the case of the Petitioners that by an application preferred for filling up of the land, pending the said permission, Petitioners deposited the amount as demanded by the Collector by his communication dated 19/11/2011 but thereafter there was no permission granted nor any development was permitted to be carried out. The Petitioner would place reliance upon a plan of the land prepared by the City Survey Officer, Goregaon on 2/06/2015, under the directions of the Collector, which has clarified that there is no filling of the said land nor there existed any mangroves.

The said plan is annexed by the Petitioners along with the rejoinder.

Mr. More, the Additional Government Pleader, by relying upon the said plan/map would submit that the area of 195987.90 square meters of CTS No. 1/A/167 is mangroves and as regards area 39601.00 square meters is already filled up. We specifically inquired with Mr. More, as to when is the filling done, but he is not able to offer any explanation.

13.

The Tahsildar and Executive Magistrate, Borivali, Government of Maharashtra has filed an affidavit on 4/08/2026, where it is stated that on 5/04/2013, a communication was addressed by the MoEF to the Chief Secretary of State of Maharashtra, wherein it was mentioned that the Petitioners in WP No.1470 of 2003 (predecessor) of the Petitioners had made a statement before the Court that they shall not carry out development over the said land, and that the CRZ clearance initially granted by MoEF has lapsed and therefore it directed an investigation into destruction of mangroves at the end of the State of Maharashtra.

The Tahsildar proceed to state that this communication was received by the office of Collector in May 2017.

Pursuant to the aforesaid directions, the Government of Maharashtra constituted a 6 member committee to ascertain whether the land has been reclaimed by destruction of mangroves.

The deponent in the affidavit proceed to state thus:-

“P. In the meanwhile, this office sought for a Joint site inspection report from the office of this office, Forest and City Survey Officer Goregaon. The City Survey Officer Goregaon vide its report dated 29-06-2015 informed inter alia that, land filling has been already done on large area of the said land almost to the extent of approximately 40,000 sq. meters. A copy of the said report dated 29-06-215 along with map is annexed. As such, the Petitioner has not only lost his right to claim refund but in fact is liable for punitive action under the provisions of law. The Petitioner is also guilty of violation of the MoEF order and also for concealing vital facts from this Hon’ble Court as well as from the Respondents before obtaining permission for land filling.”

14.

With the aforesaid pleadings in the affidavit, the State Government has adopted a stand that in light of the report of the six member committee, the question of refund of amount deposited by the Petitioner do not arise as land filling has already being done on large area of land almost to the extent of 40,000 square meters.

In paragraph 5 of the affidavit, the deponent has stated that in respect of the unauthorized filling, the office of Tahsildar conducted hearing and by order dated 21/04/2025 had directed the applicant to pay total penalty of Rs. 87,26,28,450/- for 58,605 brass of unauthorized land filling.

It is also informed that the Petitioners have challenged the said order by filing WP No. 2998 of 2025 and in an interim application filed, the High Court by order of 4/05/2026 has directed the learned Sub-Divisional Officer, Mumbai Western Suburbs, to pass a final order in the Appeal filed before it in the Applicant and accordingly, the Appeal was disposed of on 22/05/2026, by upholding and confirming the order passed by the Tahsildar.

15.

It is in this background facts, we have appreciated the contention of the Petitioners in the Petition filed in the year 2016 seeking refund of amount of Rs. 2,00,02,012/- deposited on account of grant of permission of filling and levelling of the land in CTS Nos.1A/167 and 1A/168 of village Pahadi, Goregaon, admeasuring 19,01,077 square meters. The Respondent-State has now adopted a stand that in the wake of the recovery of the amount of Rs. 87,26,28,450/- ordered by Tahsildar, Borivali by initiating proceedings under Section 48 (7) (8) of the Maharashtra Land Revenue Code, 1966 the amount which is deposited by the Petitioner cannot be refunded.

We find the stand adopted to be strange, as, as far as the deposited amount of Rs. 2,00,02,012/- by the Petitioners, is in the anticipation of the permission for land filling as early as in November, 2011, but admittedly, the State Government did not take any steps to permit the development or nor did it permit the Petitioners to fill up the land. On the other hand, the Collector, Mumbai Suburban on 11/01/2012 informed the Petitioners that it has come to its knowledge that the Environment and Forest Department, Government of India has stayed the development of the property and in this connection the matter was subjudice before the Ministry and High Court at Mumbai. It is immediately thereafter, on 26/06/2012 the Petitioners made a request to the Collector to refund the amount at the earliest in the wake of the uncertainty prevailing and also clarified that if in future the permission is granted and an intend thereof is received, the payment shall be immediately made.

Repeated representations from the Petitioners, preferred from time to time to the Collector were not at all taken cognizance of and infact, in 2013, the Collector directed the Tahsildar to prepare a report as regards refund of the amount as per the demand of the Petitioner and making inquiry as to whether the MoEF department had passed any final order. The Tahsildar sat over the said communication and did not take any steps.

It is only in the year 2018 that the Deputy Collector filed an affidavit before this Court, where it is categorically mentioned that when this Court directed the MoEF to pass its order and to submit its copy on the record of WP No.1470 of 2003, the Court had recorded the statement of the counsel for the Petitioners (which included the present Petitioners) that in future, they are not intending to carry out development of the said land.

The order dated 27/04/2012 to which the Petitioners are also party clearly record as below:-

“3.

The counsel for the petitioners has made a categorical statement that the petitioners are not interested in continuing with the project for which permission was granted vide communication dated 4.7.1996. The statement made by the learned counsel for the petitioners makes it clear that the petitioners in future shall not continue with the project pursuant to the communication dated 4.7.1996. The counsel for the petitioners states that the averments and statements made in the affidavit dated 20.4.2012 filed by the respondent nos.6 & 7 are denied in toto.

4.

In the circumstances, the request for withdrawal of the petition is granted. The petition is disposed of as withdrawn. Needless to mention that if the order which may be passed by the Ministry pursuant to the order dated 9.8.2004 passed by this Court as well as the present order and if it is adverse to the parties, it will be open for the parties to take appropriate steps, in accordance with law.”

16.

The aforesaid order is clearly indicative of the fact that the petitioners had undertaken not to carry out the development though it had earlier sought permission in the year 2011 but the court clearly recorded on 27/04/2012, that no development shall be carried out and the petition was permitted to be withdrawn.

In our view, that was the end of the matter, and at that stage, it was imperative for the Collector to refund the amount to the Petitioners, but no such steps were taken and it is only in 2013 the MoEF communicated to the Government of Maharashtra, the allegation of destruction of mangroves by the project proponent, and directed it to examine and initiate necessary action under the relevant rules, notifications and directions of the High Court including Forest (Conservation) Act, 1980, Environment (Protection) Act, 1986 and CRZ Notification 1991/2011 with regard to the subject matter of WP 1470/2003 filed by M/s Usha Madhu Development Cooperative Housing Society Ltd.

Four years down the line, on 16/05/2017, the Government of Maharashtra constituted a committee in the backdrop of the statement recorded by the Court that the project proponent is not interested in continuing with the project. The committee was therefore constituted by the Principal Secretary, Environment Department, under the Chairmanship of Vice Chancellor of Mumbai University along with the Additional Principle Chief Conservator of Forest, Mangrove Cell, as its Member Secretary. The committee was to submit its report on the following terms of reference:-

“i.

To ascertain, based on scientific facts, whether site had been reclaimed by destruction of mangroves, and determine extent of mangroves destruction in hectors with specific geographical locations, if any on site.

ii.

Present status of the site vis-a-vis approved Coastal Zone Management Plan of the Mumbai.

iii.

Recommendation for further course of action in the matter as directed by MoEF, New Delhi vide letter dated 5.4.2013 in the matter read with various High Court and Supreme Court orders and evidence submitted on record.”

17.

Before the report of the committee was received, a joint site inspection was sought from the Forest and City Survey Officer, Goregaon and he informed vide his report dated 29/06/2015 that filling has already been done on large area of the land approximately to the extent of 40,000 sq mtrs.

It is on the basis of this finding, the Collector, Suburban, arrived at a conclusion that the Petitioners are not entitled for refund but they are liable for punitive action under the provisions of law as they are guilty of violation of MoEF order.

18.

On 19/07/2018, the Tahsildar forwarded a report to the Additional Collector, after carrying out the inspection and in the said communication, he has referred to some filling being done in the past but he also clarified that since the area is large, how much was the filling done could not be assessed. With reference to the 7/12 extract in regards to the said land between 1954 to 1957, he also reported that it was khazan land and there was some growth of grass and some shrubs and no permanent construction was noticed, though there was a watchman cabin, which was found to be constructed. He also clarified that he was not sure whether the trees and shrubs are mangroves and for ascertaining this a GPS mapping should be obtained.

19.

Another development in the matter is also brought on record by the Petitioners by filing an affidavit, when it is stated that by UDD Notification dated 12/05/2023, the Government of Maharashtra has sanctioned EP-PS68 (part), an area admeasuring approximately 70 Acres being reserved for National Law University Maharashtra. In furtherance of the same, the Petitioners through their architect applied for Brihanmumbai Municipal Corporation for development permission to develop the land for MNLU and the corporation by its communication dated 4/10/2023, granted the permission for land refilling. On 19/12/2023, the Additional Collector issued a communication to the effect that there is no provision under the Rules to grant permission for filling activities and hence, no objection as sought for carrying out filling work cannot be granted. A specific statement is made in the rejoinder affidavit that the Petitioners after having necessary permission started work on the land and have filled up the land in furtherance of the activities to be carried out for the reservation of qua reservation of MNLU.

20.

No clarity is emerging before us, about the action proposed by the MoEF, but it is pertinent to note that the MCZMA as early as in 2004 forwarded a report as regards the representation preferred by Usha Madhu Development Cooperative Housing Society, and the Member Secretary, requested the MoEF, who recommended the proposal of the Housing Society for favourable consideration on merit, but as the Bombay High Court, was seized of the matter (WP No. 1470 of 2003), the MoEF was requested to consider the issue by granting hearing to the Applicant. The Member Secretary, clearly expressed the opinion that the suspension on the environmental clearance by MoEF may be revoked so that implementation of the project can be undertaken by the applicant without further delay.

At present, we have not heard any further progress about the report of the six member committee and its followup.

21.

The Tahsildar and the Executive Magistrate in her affidavit of 4/08/2026 has placed before us the order passed on 21/04/2025 under Section 47 and 48 of the Maharashtra Land Revenue Code, 1966, on the complaint filed by one Sandesh Desai and others and with reference to the panchnama carried out in respect of Survey No. 161-1/A/167, and 1/A/168, where the work of road leading to Maharashtra National Law University of Maharashtra was in progress and this land was assigned by the Petitioners Beeline Impex Pvt Ltd., and Pearl Coschem Pvt. Ltd., to the National Law University.

The order record that the panchnama revealed the filling of the said land by debris, earth, murum and this was computed to be 9134 brass. Another inspection carried out on 15/10/2024 revealed that the filling was of 98878 brass and therefore, the action was initiated under Section 48 (7) (8) of the Maharashtra Land Revenue Code against the Petitioners as well as the erstwhile Developer Usha Madhu Development Cooperative Housing Society, as well as the Contractor Mahalakshmi Enterprises.

On taking into consideration the stand adopted by the respondents to the said complaint, the Tahsildar concluded that unauthorized filling was done on the said land without obtaining necessary permissions and therefore, the Petitioners along with their erst while owner and the contractor were liable for payment of royalty amount of Rs. 87,26,28,450/- and if the same is not deposited it shall be liable to be recovered as arrears of land revenue.

We are informed that the Petitioners has filed WP No. 2998 of 2025 challenging the said penalty and on 14/07/2025, the stay has been granted against recovery of the penalty imposed which is continued till date.

22.

In our considered view, the Respondent is mixing up the issue of recovery of penalty under the Maharashtra Land Revenue Code with the demand of the Petitioners for refund of the amount which was deposited by them in the year 2011 in lieu of the permission to be granted for filling. The Petitioners deposited an amount of Rs. 2,00,02,012/- on 12/11/2012, but when development was not permitted to be carried out and rather the Petitioners made a specific statement before the Court that they did not intent to develop the site, and preferred an application for refund of the amount, this application was never considered despite repeated representations/ request being made.

However, in the wake of the communication from the MoEF permitting the State Government to conduct an inquiry as regards the destruction of mangroves, we are not aware as to what is the outcome of the said proceedings, but in any case, the said cause of action can result into a separate action against the Petitioners, if at all the violation is proved. The proceedings initiated by the Tahsildar under the Maharashtra Land Revenue Code resulted into a challenge being preferred before the Sub-Divisional Officer and now it is subjudice before this Court in WP No. 2998 of 2025, and despite the SDO upholding the order passed by the Tahsildar, this Court has extended the interim order passed by it from time to time and as on the date the said order is in force.

Needless to state that, if the Petitioners do not succeed in its challenge, the order dated 21/04/2025, passed by the Tahsildar shall be enforced and the Petitioners shall be liable to deposit the amount of royalty in the sum of Rs. 87,26,28,450/- as determined by the Collector in exercise of the power under Section 48 (7) and (8), of the Maharashtra Land Revenue Code, 1966. However, independent of that action, we see no reason, why the amount deposited by the Petitioners in the year 2011, shall not be refunded to them as the said amount was deposited as a pre-requisite for grant of permission to fill and level the land but this was not given done and infact immediately in the year 2012, the Petitioners made a statement before the Court that they were not interested in continuing with the project for which the permission was granted on 4/07/1996 i.e. for development of Golf Club etc.

When the present Petitioners, who are the successor in interest of Usha Madhu Development CHSL, preferred an application to the Collector for filling of the land admeasuring 19,01,077.00 sq mtrs, it made it clear that it shall fill up the land by leaving 50 mtrs of area from the periphery of the boundary though there were no mangroves and it also clarified that the filling material would be the excavated material from the basement i.e., mud or soil and the Petitioners agreed to pay royalty as per rules and regulations for excavation of 10,22,779.426 brass and the Collector computed the sum of Rs. 2,00,02,012/- for 85,000 brass of minor mineral, but when the Petitioners did not proceed with the said work, it was imperative for the Collector to refund the said amount, as the State Government cannot enrich itself by retaining the amount. Now in the year 2024 there is a claim stated by the State Government that some filling was done and the Petitioners are liable for payment by way of Royalty and penalty under the provisions of the Maharashtra Land Revenue Code, and therefore, the said amount cannot be refunded.

23.

In the aforesaid circumstances, we do not find any justification in the Respondent withholding the amount of Rs. 2,00,02,012/- which was deposited by the Petitioners, despite the fact that the permission for filling was not granted and, rather, the predecessor of the Petitioners made a statement before the court that it has abandoned the project. The Petitioners immediately sought refund of the amount, but no steps are taken and, without any justification or reason, the Respondent continued to hold onto the amount, which, according to us, is completely unjustified. As far as the proceedings against Petitioners are concerned, we make it clear that the Petitioners shall be liable for making such payment, if any liability is fastened on them, but as far as the present petition is concerned, which seeks a refund of the amount of Rs. 2,00,02,012, we direct the Respondent State to refund the said amount which has been illegally retained by it since the date of its deposit, and we direct the refund of the said amount within a period of six weeks from today with interest at the rate of 6%, from the date of its deposit, as, in our view, the State Government cannot unjustly enrich itself or benefit without a valid justification, and must refund the amount, by topping it up with the interest as directed.

Rule is made absolute. No order as to costs.