Case at a Glance
An Andheri housing society of 38 flats and 7 shops had its first application for deemed conveyance rejected by the Competent Authority on 28 March 2016 and did not challenge it at the time. After a later application succeeded but was set aside by the High Court as barred by res judicata, the society challenged the 2016 rejection itself. Justice Sandeep V. Marne held that a promoter’s duty under MOFA to convey the land is a continuing cause of action, so delay and laches could not defeat the claim. The 2016 order was set aside and the matter remanded for conveyance of land proportionate to the society’s built-up area, to be decided preferably within four months.
The society was registered on 16 February 1994 and has 38 flats and 7 shops on CTS Nos. 6519 to 6523 (Part), Village Kolekalyan, Taluka Andheri. The developer sold the units under agreements governed by the Maharashtra Ownership Flats Act (MOFA). Plans were approved in 1986, revised plans were never approved, and no occupancy certificate was issued; the municipal corporation issued demolition notices between 1997 and 1999.
The society’s first deemed conveyance application (No. 60 of 2015) was rejected on 28 March 2016 on grounds including slum status, acquisition, title claims and illegality of construction. A second application (No. 197 of 2024) was allowed on 29 September 2025, but on 17 March 2026 the High Court set that order aside as barred by res judicata and left the society to its remedies. The society then filed this writ petition against the 2016 rejection.
The Key Question Before the Court
Can a housing society challenge, about ten years later, an order rejecting its deemed conveyance application, and if so what land is it entitled to?
A continuing obligation, and a proportionate share
On delay, the Court held that rigid limitation principles should not defeat a society’s statutory right to conveyance, referring to Samruddhi Co-operative Housing Society Limited v. Mumbai Mahalakshmi Construction Private Limited, (2022) 01 SC CK 0021 and Sushma Tulshidas Adhav v. Pradeep D. Shah. A promoter’s obligation under MOFA to convey the land to which the society is entitled is a continuing cause of action, so the objection of delay and laches was rejected. The Court acknowledged some lack of diligence after 2018 but took into account COVID-19 restrictions and structural repairs in 2023. It also held the petition maintainable because an application under Section 11(3) of MOFA is itself a remedy in accordance with law, and noted its consistent practice of permitting societies to correct earlier mistakes through fresh applications or corrigenda.
On entitlement, the Court relied on the municipal file noting of 12 March 1999 only for built-up area figures: permissible built-up area of 2314.74 sq. m., of which the society’s building used 1989.31 sq. m., with 653.74 sq. m. attributable to 11 other existing structures. The society could not get the entire plot and was entitled only to land proportionate to its 1989.31 sq. m., which its senior counsel fairly accepted. The Court set aside the 28 March 2016 order, remanded Application No. 60 of 2015 for proportionate land division, directed the society to file an architect’s certificate of its exact entitlement, fixed appearance before the Competent Authority on 19 November 2026, and asked for a decision preferably within four months. A request by one respondent to stay the order for eight weeks was declined.
What the Court Actually Held
- A promoter’s MOFA obligation to convey land is a continuing cause of action; delay and laches did not bar the society’s challenge to the 2016 rejection.
- A Section 11(3) MOFA application is itself a remedy in accordance with law, so the writ petition was maintainable.
- The society is entitled only to land proportionate to its built-up area of 1989.31 sq. m., not the whole plot.
- The 2016 order was set aside and the application remanded for fresh decision, preferably within four months; stay of the order was refused.
Why This Judgment Matters
- Many Mumbai societies whose deemed conveyance pleas were rejected years ago may find a route to revive them.
- It treats the builder’s duty to convey as continuing, weakening delay objections.
- It shows how proportionate land division by built-up area can resolve shared-plot conveyance disputes.
What Should Advocates Take Away From the Judgment?
For Housing Societies
- An old rejection of deemed conveyance is not necessarily the end; the duty to convey continues.
- Expect to receive land proportionate to your built-up area where other structures share the plot.
- Keep an architect’s certificate of built-up area and land entitlement ready.
For Counsel
- Plead the continuing cause of action under MOFA against delay objections.
- Cite Samruddhi Co-operative Housing Society Limited v. Mumbai Mahalakshmi Construction Private Limited on limitation in conveyance claims.
- Where a later application is hit by res judicata, consider challenging the original rejection.
Key Takeaways
- A 2016 deemed conveyance rejection was set aside in 2026.
- Delay did not defeat the society’s statutory right.
- Land is to be conveyed in proportion to built-up area.
- The Competent Authority must decide afresh, preferably in four months.
Frequently Asked Questions
What is deemed conveyance?
It is the process under Section 11 of MOFA by which a housing society can get the land and building conveyed through the Competent Authority when the promoter fails to execute the conveyance.
Why was the 10-year delay not fatal?
The Court held that the promoter’s obligation to convey the land is a continuing cause of action, and that rigid limitation principles should not defeat a society’s statutory right to conveyance.
Will the society get the whole plot?
No. The Court held it is entitled only to land proportionate to its built-up area of 1989.31 sq. m., with the rest remaining with the owners.
Conclusion
The ruling gives societies stuck with old rejections a way back to conveyance, while limiting relief to a fair, proportionate share of a plot shared with other structures.
Practical takeaway: If your society’s deemed conveyance plea was rejected years ago, take legal advice on challenging that order; prepare built-up area figures to support a proportionate claim.
Read the full judgment on CourtKutchehry: View judgment →